ML20207B838

From kanterella
Jump to navigation Jump to search
Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified
ML20207B838
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/24/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20207B840 List:
References
NUDOCS 9906020135
Download: ML20207B838 (3)


Text

-

A-

<g

.b-l

, May 24, 1999

~

Mr. G. Rainey, President PECO Nuclear .

Peach Bottom Atomic Power Station Nuclear Group Headquarters Correspondence Control Desk '

P. O. Box 195 Wayne, Pennsylvania 19087-0195-

SUBJECT:

FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) FINAL EXERCISE '

l REPORT FOR THE NOVEMBER 17,1998, PEACH BOTTOM ATOMIC POWER .

STATION PLUME EXPOSURE PATHWAY EXERCISE

Dear Mr. Rainey:

Enclosed is a letter from Rita A. Calvan, FEMA Region lli Regional Director, dated April 23,

.1999, transmitting the FEMA report for the subject exercise.

There was one Deficiency identified during the November 17,1998, plume exposure pathway exercise which was resolved on March 16,1999, during a remedial drill. Also, there were 27 l Areas Requiring Corrective Action (ARCA) identified during the November 17,1999, exercise.  ;

Please provide assistance to offsite officials as they address and resolve the identified items on i a timely basis. j l

If you have any questions concerning this enclosure, please contact Nancy McNamara at (610) l 337-5337.

I '

i. ' Sincerely,  ;

l l OFIGINAL SIGNED BY:

l l

l Richard J. Conte, Chief l- Human Performance and Emergency Preparedness Branch  :

Division of Reactor Safety Docket Nos. 50-277,50-278 i

Enclosure:

FEMA Final Exercise Report for Peach Bottom 99060d0'155'990524 PDR ADOCK 05000277 F PM si l I

w i

G. Rainey - 2 oc w/ encl:

J. Hagan, Vice President, Nuclear Station Support

'J. Doering, Vice President, Peach Bottom Atomic Power Station M. Wamer, Plant Manager Peach Bottom Atomic Power Station

' G. D. Edwards, Chairman, Nuclear Review Board R. Boyce, Director, Nuclear Quality Assurance !

A. F. Kirby,111, Extemal Operations - Delmarva Power & Light Co.

A. A. Winter, Manager, Experience Assessment J. W. (*sprham, Sr., Senior Vice President and General Counsel H. C. Kresge, Manager, Extemal Operations, Connectiv

. N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council ,

R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania State of Maryland TMI- Alert (TMIA) cc w/o encl:

R.A. Calvan, Regional Director, FEMA Region ill

)

l I

i i

i i

I

G. Rainey 3

. Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector PUBLIC L DRS File (2) '

D. Silk, DRS R. Conte, DRS Distribution w/o enci:

H. Miller, RA/J. Wiggins, DRA (1)

C. Cowgill, DRP D. Florek, DRP D. Cullison, DRP C. O'Daniell, DRP W. Lanning, DRS D. Barss, NRR M. Tschiltz, OEDO E. Adensam, PDI-2, NRR inspection Program Branch, NRR (IPAS)

M. Thadani, NRR B. Buckley, NRR R. Correia, NRR DOCDESK DOCUMENTNAME: G:\EP&SB\ SILK \PBFEMA98.WPD T3 recohe a copy of this document. Indicate in the box: "C" = Co >y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS _, lE Rl/DRS /J / l l l NAME DSilk @:d RConte//V DATE 05/1$/99 058//99 OFFICIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ _