ML20206K192

From kanterella
Jump to navigation Jump to search
Discusses 990503 Telcon Between J Williams & B Bierly Re Arrangements Made for Administration of Licensing Exam at Peach Bottom Facility During Week of 990913
ML20206K192
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/06/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9905130094
Download: ML20206K192 (4)


Text

-i'

,i~;

l 1

l May 6, 1999 Mr. G. Rainey, President 1PECO Nuclear .

Peach Bottom Atomic Power Station Nuclear Group Headquarters

Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195

SUBJECT:

SENIOR REACTOR AND REACTOR INITIAL EXAMINATIONS -

PEACH BOTTOM

Dear Mr. Rainey:

In a telephone conversation on May 3,1999 between Mr. J. Williams and Mr. B. Bierly, arrangements were made for the administration of licensing examinations at the Peach Bottom facility during the week of September 13,1999.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in interim Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any

. changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

- outlines by July 16,1999. The written examinations, operating tests,- and the supporting reference materials identified in Attachment 2 of ES-201 will be due by August 9,1999. Any i delay in receiving the required examination and reference materials, or the submittal of

' inadequate or incomplete materials, may cause the examinations to be rescheduled. ,

1 in order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

. to make the simulation facility available on the dates notes above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  ;

temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect'while the written examinations and operating tests are being administered.

'V?

J\

99051'3009'4 990506 )

PDR ADOCK 05000277

.V PDR $

4 i

r ,

G. Rainey '

' To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget

. (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.' If the applications are not received at least 30 days before the examination date,' a postponement may be necessary. Signed applications certifying that all training has l been completed should be submltted at least 14 days before the first examination date. -

This letter contains information collections that are submit to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response,-including the time for reviewing instructions, gathering and maintaining the data ,

needed, writing the examinations, and completing and reviewing the collection of information. I Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),  ;

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic j mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, l NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

l The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Bierly has been advised of the policies and j guidelines referenced in this letter. If you have any questions regarding the NRC's examination '

procedures and guidelines, please contact Julian Williams at (610) 337-5124, or me at (610) 337-5183.

Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch  ;

Division of Reactor Safety 1 l

Docket Nos. 50-277, 50-278  !

i l

l l

2

p ,.

( .

G. Rainey ,

cc:

J. Hagan, Vice President, Nuclear Station Support

-J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station G. D. Edwards, Chairman, Nuclear Review Board R. Boyce, Director, Nuclear Quality Assurance A. F. Kirby,111, External Operations - Delmarva Power & Light Co.

A. A. Winter, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel H. C. Kresge, Manager, External Operations, Connectiv N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council R. Ochs,' Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr & Mrs. Kip Adams Com.nonwealth of Pennsylvania State of Maryland

'TMI- Alert (TMIA)

L. MacEntee, Manager-Operator Training i

1 I

l l

l l

/

G. Rainey Distribution:

Region l Docket Room (with concurrences)

. Nuclear Safety information Center (NSIC)

NRC Resident inspector PUBLIC

' H. Miller, RA/J. Wiggins, DRA (1)

C. Cowgill,' DRP.

D. Florek, DRP.

D. Cullison, DRP C. O'Daniell, DRP W. Lanning, DRS _

R. Conte, DRS ~

J. Williams. DRS OL-Facility File DRS File

]

Distribution: (VIA E-MAIL)

M. Tschiltz, OEDO '

- E. Adensam, PDl-2, NRR Inspection Program Branch, NRR (IPAS)

M.'Thadani, NRR

~ B. Buckley, NRR R. Correia, NRR DOCDESK l

l 4

i DOCUMENT NAME: G:\HPEPB\ WILLIAMS \PBINITEX.WPD .l Tm receive a copy of this document, Indicate in the box: "C" = Co>y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy l OFFICE Rl/DRS ()$ d l Rl/DRS g/ l l l NAME JWilliams l'" RC9nt// 7 DATE 05/04/99 c/5 05[WJ9 05/ /99 05/ /99 05/ /99 OFFICIAL RECORD COPY

--