Informs That NRC Recently Obtained Info Re Industrial Safety Issues at Hatch Facility.Info Indicated That Personnel Unnecessarily Working on Energized Electrical Equipment Without Appropriate Clothing
ML20155A626
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/15/1998
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9810290200
Download: ML20155A626 (3)


Text

- - . - .- . - -. . - _ - _. .~ - -. -_

October 15, 1998 Southern Nuclear Operating Company, Inc.

ATTN: Mr. H. L. Sumner, Jr.

Vice President, Hatch Plant Nuclear Operations P.O. Box 1295 Birmingham, AL 35201

SUBJECT:

HATCH NUCLEAR PLANT INDUSTRIAL CONCERNS l

Dear Mr. Sumner:

The Nuclear Regulatory Commission (NRC) recently obtained information regarding industrial I safety issues at your Hatch facility. In particular, the information indicated that personnel are  !

unnecessarily working on energized electrical equipment, working on unvented piping  !

containing potentially explosive material, and performing welding or other hot work without i appropriate clothing. These issues, if left uncorrected, could affect plant equipment or I endanger personnel performing these activities. l 1

l We are providing you the above information for your evaluation and action, as you deem l appropriate. You are not required to respond to this letter. l l

1 In accordance with Section 2.790 of NRC's " Rules of Practice," a copy of this letter and your l response will be placed in the NRC Public Document Room. l if you have any questions regarding this letter, please contact Pierce Skinner, Chief, Reactor Projects Branch 2, at (404) 562-4520.

1 Sincerely, (Orig signed by P.H. Skinner)  !

Pierce H. Skinner, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-321,50-366 License Nos. DPR-57, NPF-5 Distribution:

L. Plisco, Ril P. Skinner, Ril L. Olshan, NRR l PUBLIC NRC Resident inspector )

U. S. Nuclear Regulatory Commission 11030 Hatch Parkway North o

Baxley, GA 31513

  • SEE PREVIOUS CONCURRENCE OFFICE IIsDRP RIIsORA RIIEICS SIINEATURE unsIE PESkinnersaka CFRyans* ATBoland*

DATE 10/ /98 10/ /98 10/ /98 10/ /98 10/ /98 10/ /98 10/ /98 COPY? YES WJ YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NA8EE: Os\HATCM\ZNDUSTRY. HAT 9810290200 981015 PDR ADOCK 05000321 P PDR

$0l J

Southern Nuclear Operating Company, Inc.

ATTN: Mr. H. L. Sumner, Jr.

Vice President, Hatch Plant l

Nuclear Operations P.O. Box 1295 Birmingham, AL 35201

SUBJECT:

HATCH NUCLEAR PLANT INDUSTRIAL CONCERNS

Dear Mr. Sumner:

The Nuclear Regulatory Commission (NRC) recently obtained information regarding industrial safety issues at your Hatch facility. In particular, the information indicated that personnel are unnecessarily working on energized electrical equipment, working on unvented piping containing potentially explosive material, and performing welding or other hot work without appropriate clothing. These issues, if left uncorrected, could result in damage to safety-related equipment or endanger personnel performing these activities.

We are providing you the above information for your evaluation and action, as you deem appropriate. You are not required to respond to this letter.

In accordance with Section 2.790 of NRC's " Rules of Practice," a copy of this letter and your response will be placed in the NRC Public Document Room.

if you have any questions regarding this letter, please contact Pierce Skinner, Chief, Reactor Projects Branch 2, at (404) 562-4520.

Sincerely, Pierce H. Skinner, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-321,50-366 License Nos. DPR-57, NPF-5 Distribution:

L. Plisco, Ril P. Skinner, Ril L. Olshan, NRR PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 11030 Hatch Parkway North Baxley, GA 31513

  • SEE PREVIOUS CONCURREN#E /

OFFICE ZZ:DRP RIIsoRA , q h 080BIATURE [ hfN

- , m i.... . c,m o.. m44, DATE 10/ /98 10/ /98 1M h /98 10/ /98 10/ /98 10/ /98 10/ /98 co m = .m m o M.A no = .m m o = o m o orrrezAr. RecoRo con d ' max : oisaarenszwous m .une

r SNC 3 cc w/ encl: Continue '

Progra Manager Fossil Nuclear perations Ogleth pe Po er Corporation 2100 E. xch nge Place Tucker, A 0085 1349 Charles 4. Patrizia, Esq.

Paul, H@ tings, Janofsky & Waiker 10th FI or 1299 ennsylvania Avenue

' Wast ngt:>n, D. C. 20004 9500 Sen' r Engineer - Power Supply Mur cipal Electric Authority of 3eorgia 14 Riveredge Parkway NW Atl ta L , dA 30328-4684 1

Distribution w/ encl:  !

L. Plisco, Ril P. Skinner, Ril L. Olshan, NRR PUBLIC NRC Resident inspector )

U. S. Nuclear Regulatory Commission 11030 Hatch Parkway North  !

Baxley, GA 31513 1 i

l oFrICE' RIISDRP RIIsORA RZIsEICs

!ZWIATURE [pf ,

Ilham PRskinnertaka CFEvan W AT3oland nkTE 10/ /98 .10/ )k y 10/ /98 10/ /98 10/ /98 10/ /58 10/ /90 corrt was no us / mo9 vse no vus no vas no vas no vus no orrzezAx. Recomo coPr VooComuur unus, as saarenuanusur. ant