Submits Results of Staff Review Re GL 97-05 SG Tube Insp Techniques. Staff Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Davis-Besse That Would Indicate That Licensee Not in Compliance W/Current Licensing Basis
ML20151T763
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/08/1998
From: Hansen A
NRC (Affiliation Not Assigned)
To: Jeffery Wood
CENTERIOR ENERGY, TOLEDO EDISON CO.
References
GL-97-05, GL-97-5, TAC-MA0461, TAC-MA461, NUDOCS 9809100144
Download: ML20151T763 (4)


Text

- - . .. - --- .- -. ..

., .-- o Vice President - Nuclear eDavis-Besse september 8, 1998 Centerior Service Company c/o Toledo Edison Company

-Davis-Besse Nuclear Power Statien 5501 North State Route 2 Oak Harbor, OH- 43449-9760

SUBJECT:

GENERIC LETTER 97-05, " STEAM GENERATOR TUBE INSPECTION TECHNIQUES," RESULTS OF STAFF REVIEW 0F LICENSEE RESPONSE, DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 (TAC NO. MA0461)

Dear Mr. Wood:

On December 17, 1997, the staff issued Generic Letter (GL) 97-05, " Steam Generator Tube Inspection Techniques," to the industry requesting that each addressee provide the following information:

(1) Whether it is licensee practfte-to leave steam generator tubes with indications in service based on sizing.

(2) If the response to (1) is affirmative, a written report should be submitted that includes, for each type of indication, a description of the associated nondestructive examination method being used and the technical basis for the acceptability of the technique used.

By letter dated March 16, 1998, you responded to this GL, which included a description and technical basis for.all inspection techniques used to size the depth of steam generator tube degradation at the Davis-Besse Nuclear Power Station. The staff has completed its review, and did not identify any concerns with the steam generator tube inspection techniques employed at Davis-Besse that would indicate that you were not in compliance with the current licensing basis for the facility.

This completes the effort on TAC Number MA0461. Please contact me if you have any questions regarding this matter.

Sincerely, Original signed by:

Allen G. Hansen, Pro,iect Manager Project Directon de II-3 Division of Reactor Projects III/IV 3 Office of Nuclear Reactor Regulation ig Docket No. 50-346 cc: See next page DISTRIBUTION:

Docket File PUBLIC PD33 r/f EGAl f(Og RBellamy ADromerick EMCB OGC ACRS CGrant, Region 3 DOCUMENT NAME: G:\DAVISBES;DBA0461.RAI . , _ , , c p 0FFICE- lLA:PDIII-3 , G., PM:PDIII-3 , C-

[ h h_ i s [ i u A J U d B NAME EBarnhill V/V AHansend W DATE Q/3/Q9 ~ ~ t//7/W 9809100144 9eo90s CIAL RECORD COPY PDR ADOCK 05000346 G PDR

E 761n (Z. Coos

. Vice President - Nuclear, Davis-Besse September 8, 1998 i Centerior Service Company c/o Toledo E.11 son Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

GENERIC LETTER 97-05, " STEAM GENERATOR TUBE INSPECTION TECHNIQUES," RESULTS OF STAFF REVIEW 0F LICENSEE RESPONSE, DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 (TAC NO. MA0461)

Dear Mr. Wood:

On December 17, 1997, the staff issued Generic Letter (GL) 97-05, " Steam Generator Tube Inspection Techniques," to the industry requesting that each addressee provide the following information:

(1) Whether it is licensee practice to leave steam generator tubes with indications in service based on sizing.

(2) If the response to (1) is affirmative, a written report should be submitted that includes, for each type of indication, a description of the associated nondestructive examination trethod being usad and the technical basis for the acceptability of the technique used.

By letter dated March 16, 1998, you responded to this GL, which included a description and technical basis for all inspection techniques us.ad to size the depth of steam generator tube degradation at the Davis-Besse Nuclear Power Station. Tha staff has completed its review, and did not identify any concerns with the steam generator tube inspection techniques employed at Davis-Besse that would indicate that you were not in compliance with the current licensing basis for the facility.

This completes the effort on TAC Number MA0461. Please contact me if you have any questions regarding this matter.

Sincerely, Original signed by:

Allen G. Hansen, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page DISTRIBUT1Q3:

Docket File PUBLIC PD33 r/t EGAl RBellamy ADromerick EMCB OGC ACRS GGrant, Region 3 DOCUMENT NAME: G:\DAVISBES\DBA0461.RAI 0FFICE LA:PDIII-3 , Q.J PM:PDIII-3,, C

NAME EBarnhill W V AHansendG#

RDATE Q/3/99 ~ ~ 9 /7 /9f 0FFICIAL RECORD COPY

reg

'a g i UNITED STATES

, s" j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20056 4 001

'+, * * * * * ,d September 8, 1998 Mr. John K. Wood Vice President - Nuclear, Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

GENERIC LETTER 97-05, " STEAM GENERATOR TUBE INSPECTION TECHNIQUES," RESULTS OF STAFF REVIEW 0F LICENSEE RESPONSE, i DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 (TAC N0. MA0461)

Dear Mr. Wood:

On December 17, 1997, the staff issued Generic Letter (GL) 97-05, " Steam Generator Tube Inspection Techniques," to the industry requesting that each addressee provide the following information:

(1) Whether it is licensee practice to leave steam generator tubes with indications in service based on sizing.

(2) If the response to (1) is affirmative, a written report should be submitted that includes, for each type of indication, a description of the associated nondestructive examination method being used and the technical basis for the acceptability of the technique used.

By letter dated March 16, 1998, you responded :o this GL, which included a description and technical basis for all inspeccion techniques used to size the depth of steam generator tube degradation at the Davis-Besse Nuclear Power Station. The staff has completed its review, and did not identify any concerns with the steam generator tube inspection techniques employed at Davis-Besse that would indicate that you were not in compliance with the current licensing basis for the facility.

This completes the effort on TAC Number MA0461. Please contact me if you have any questions regarding this matter.

I Sincerely, l - -

Allen G. Hansen, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page

3 n;

G  ;

John K. Wood Davis-Besse Nuclear Power Station, Unit 1 Toledo Edison Company cc:

]

Mary E. O'Roilly Robert E. Owen, Chief l FirstEnergy Bureau of Radiological Health )

Davis-Besse Nuclear Power Station Service 1 5501 North State - Route 2 Ohio Department of Health Oak Harbor, OH 43449-9780 P.O. Box 118 Columbus, OH 43266-0118 James L. Freels Manager- Regulatory Affairs .

Toledo Edison Company James R. Williams, Chief of Staff Davis-Besse Nuclear Power Station Ohio Emergency Management Agency 5501 North State - Route 2 2855 West Dublin Granville Road Oak Harbor, OH 43449-9760 Columbus, OH 43235-2206 Jay E. Silberg, Esq. Donna Owens, Director Shaw, Pittman, Potts Ohio Department of Commerce and Trowbridge - Division of Industrial Compliance 2300 N Street, NW. Bureau of Operations & Maintenance Washington, DC 20037 6606 Tussing Road P.O. Box 4009 Regional Administrator Reynoldsburg, OH 43068-9009 U.S. Nuclear Regulatory Commission 801 Warrenville Road Ohio Environmental Protection Agency Lisle, IL 60523-4351 DERR-Compliance Unit ATTN: Zack A. Clayton -

Robert B. Borsum P.O. Box 1049 Babcock & Wilcox Columbus, OH 43266-0149 Nuc! ear Power Generation Division 1700 Rockville Pike, Suite 525 State of Ohio Rockville, MD 20852 ' Public Utilities Commission 180 East Broad Street Resident inspector Columbus, OH 43266-0573 U.S. Nuclear Regulatory Commission 5503 North State Route 2 Attorney General Oak Harbor, OH 43449 Department of Attomey 30 East Broad Street James H. Lash, Plant Manager Columbus, OH 43216 ,

Toledo Edison Company  ;

Davis-Besse Nuclear Power Station President, Board of County 5501 North State Route 2 Commissioners of Ottawa County Oak Harbor, OH 43449-9760 Port Clinton, OH 43252 ,

I i

J