ML20148C862

From kanterella
Jump to navigation Jump to search
Informs That TR BAW-2241P Will Be Ref in Future Submittals of P/T Limit Curve Revs for B&W Plants as Result of 970519 Telcon Between L Lois & J Taylor
ML20148C862
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 05/22/1997
From: Taylor J
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP
To: Birmingham J
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PROJECT-683, PROJECT-693 JHT-97-25, NUDOCS 9705290199
Download: ML20148C862 (2)


Text

i

, s

'~

,"; GwNEns CR8up I r ,,,,,

Duks Power Company Oconee 1. 2. 3 GPU Nuclear Corporabon TMI-1 Entxrgy Operations. Inc. ANO-1 Toledo Edrson Company Davts Besse Flonda Pow Corporaten Crystat einer 3 -~

Framatome Technologes, Inc.

IN MG'Im Working Together to Economically Provide Reliable and Safe Electrical Power l

Suite 525 e 1700 Rockvice Pike e Rockville, MD 20852 e (301)230-2100 l JHT/97-25 May 22,1997 l OG-1653 hpjtc1No 683 and 693 1

i Document Control Desk l U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attention: Mr. J.L. Birmingham, Project Manager Division of Reactor Program Management

Subject:

B&WOG Topical Report BAW-2241P, " Fluence and Uncertainty Methodologies"

References:

1. B&WOG letter OG-1651 dated May 14,1997, "B&W Owners Group (B&WOG) Submittal of BAW-2241P, ' Fluence and Uncertainty Methodologies,' April 1997"
2. Duke Power letter a2ted May 19,1997, ONS Docket Nos. 50-269, -270, -287 Gentlemen:

Reference 1 forwarded proprietary and non-proprietary versions of B&W Owners Group Topical Report BAW-2241P, " Fluence and Uncertainty Methodologies" dated April 1997.

In addition, Reference I requested review of this report to support the review of BAW-2251, " Reactor Vessel Topical Report for License Renewal."

[

t As a result of a telephone call between Mr. Lambros Lois of the USNRC and Mr. Jim ,

Taylor of Framatome Technologies on May 19,1997, we would like to point out that BAW-2241P will also be referenced in future submittals of pressure-temperature (P-T) p0t5.6 limit curve revisions for B&W plants. In the near term, it is expected that submittals for

! revised P-T curves will be made for the three Oc units (Duke Power Company)in the I BOI bE' first quarter of 1998. b' O g-i<

)

g.Pt'(

20 NNOn-Ai b llll3lll3Ql3l[Ill{3ll,$l[l3llll 9705290199 970522 /J @OC g l PDR ADOCK 05000269 P PDR p2$ )

y pf C $

,* i i

e 4

{

b BAW-2241P will also be referenced in the Duke Power License Renewal technical ,

information topical report. The Duke Power schedule and topical report review '

requirements are shown in Reference 2.

Should you have any questions regarding these submittals, please contact me at 804/832- .,

2817. j l

Very truly yours,

~

, w bcu J. 1. Taylor, Manager Licensing Services j l

WRG/mcl c: R. J. Prato/NRR

. L. Lois/NRR i

l l

l l

l 1

i i

_..