Forwards Insp Rept 99900403/87-06 on 871109-12.Insp Conducted as Followup to NRC Insp Rept 99900403/86-01,in Response to Gap to NRC Re Alleged Deficiencies in Design Control Activities within QA at Ref GE Facility
ML20148C614
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/02/1988
From: Stone J
Office of Nuclear Reactor Regulation
To: Wolfe B
GENERAL ELECTRIC CO.
Shared Package
ML20148C619 List:
References
CON-#189-8129, REF-QA-99900403 2.206, NUDOCS 8803220453
Download: ML20148C614 (4)


Text

-

c i o UNITED STATES g

s E o NUCLEAR REGULATORY COMMISSION 7; .t WASHING TON, D. C. 20555 s...../

March 2, 1988 Docket No. 99900403/87-06 GE Nuclear Energy ATTN: Dr. Bertram Wolfe, Vice President and General Manager 175 Curtner Avenue San Jose, California 95125 Gentlemen:

This letter addresses the inspection of your facility at San Jose, California conducted by Mr. R. L. Pettis, Mr. R. P. McIntyre, and Mr. W. P. Haass of this office on November 9-12, 1987, and the discussions of their findings with Mr. J. J. Fox and members of your staff at the conclusien of the inspection.

The inspection was conducted as a follow-up to NRC Inspection Report No. 99900403/

86-01, in response to allegations recieved by the NRC in a letter dated October 5, 1985, from the Government Accountability Project (GAP). This letter and related documents alleged deficiencies in the design control activities within the Quality Assurance (QA) program at General Electric's (GE) San Jose, California facility, during the period March 1978 to April 1982. The allegations were based on the work record of Mr. Sam A. Milam. III, a fortner GE employee, and on a review of Mr. Milam's work record performed by Mr. Charles E. Stokes, a consultant for GAP. GAP n'ade documents concerning these allegations available for NRC review in February 1986. In March 1986, NRC obtained copies of these documents, including a copy of the report prepared by Mr. Stokes. In July 1986, April 1987, and August 1987, NRC conducted inspections at San Jose to review these allegations. These inspections were documented in NRC Inspection Report Nos. 99900403/86-01, 87-01, and 87-03, respectively.

Additional concerns expressed in Congressman Edward Markey's April 10, 1987 letter to NRC Chairman Lando Zech, Jr., specifically addressing the reactor mode switch, FSAR verification, deferred design verification, fire protection, and subcontractor signature related concerns have now all been reviewed and addressed within NRC Report Nos. 99900403/87-03 and this report.

Areas examined during this inspection and our findings are discussed in the enclosed report. The inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors. Certain areas remain open pending further inspection. A signifi-cant area of concern to Mr. Milam, deferred design verification, was closed with no identification of instances where General Electric failed to meet NRC requi rements .

8803220453 880302 PDR GA999 ENVGENE 9 99900403 PDR fgD o

\

GE Nuclear Energy March 2, 1988 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you believe to be exempc from disclosure under 10 CFR 9.5(a)(4), you must (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed so that you have less than 7 days for your review, please notify this office promptly so that a new due date may be established. Consistent with 10 CFR 2.790(b)(1), any such application must be accompanied by an affidavit, executed by the owner of the infonnation, that identifies the document or part sought to the withheld, and that contains a full statement of the reasons that are the basis for the claim that the information should be withheld from public disclosure. 10 CFR 2.790(b)(1) further requires the statement specifically to address the considerations listed in 10 CFR 2.790(b)

(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to discuss then ith you.

Sincerely,

/S/

James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Inspection Report No. 99900403/87-06
2. Appendix B-Inspection Data Sheets (9 pages)

DISTRIBUTION:

RIDS Code IE:09 VIB Reading DRIS Reading JPartlow BGrimes JStone ,

UPotaposs l RPettis (2) l RMcIntyre WHaass LParker 0FC :Vib:DRIS :SC/Vib: RIS :AL/V;fMDRIS :  :


:------------ -:----- -----:---(p-----:------------:------------:------------:--------

NAME :RPettis:tt :UPot vs JStone  :  :  :  :


:-------------:---h88 DATE :7,/,2//88

2/)-
7 /lh CS  :  :  :  :

L .

s GE Nuclear Enargy March 2, 1988 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. if this report contains any information that you believe to be exempt from disclosure un.ier 10 CFR 9.5(a)(4), you must (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed so that you have less than 7 days for your review, please notify this office promptly so that a new due date may be established. Consistent with 10 CFR 2.790(b)(1), any such application must be accompanied by an affidavit, executed by the owner of the information, that identifies the document or part sought to the withheld, and that contains a full statement of the reasons that are the basis for the claim that the information should be withheld from public disclosure. 10 CFR 2.790(b)(1) further requires the statement specifically to address the considerations listed in 10 CFR 2.790(b)

(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/M James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Inspection Report No. 99900403/87-06
2. Appendix B. Inspection Data Sheets (9 pages)

DISTRIBUTION:

RIOS Code IE:09 VIB Reading DRIS Reading JPartlow BGrines JStone UPotapovs RPettis (2)

RMcIntyre WHaass LParker 0FC :V16:0RIS :SC/VIb: klS :AC/VlBADRIS :  :  :

.....:............ .:..... .....:.. (p.....:............:............:............:........

NAME :RPettis:tt :UPota' vs 'JStone  :  :  :  :

.....:........... ..:... 7.....  :............:............:............:............:. ......

DATE :7,/,2//88 :2 /)U88  : 7 /lC/CS  :  :

.\ t

's GE Nuclear inergy March 2, 1988 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Publie Document Room. If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), you must (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed so that you have less than 7 days for your review, please notify this office promptly so that a new due date may be established. Consistent with 10 CFR 2.790(b)(1), any such application must be accompanied by an affidavit, executed by the owner of the information, that identifies the document or part sought to the withheld, and that contains a full statement of the reasons that are the basis for the claim that the information should be withheld from public disclosure. 10 CFR 2.790(b)(1) further requires the statement specifically to address the considerations listed in 10 CFR 2.790(b)

(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 198C, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, g JaVendor Inspection tone, cN f k Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Inspection Report No. 99900403/87-06