Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings
ML20148B962
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 05/05/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148B961 List:
References
50-369-97-04, 50-369-97-4, 50-370-97-04, 50-370-97-4, NUDOCS 9705130423
Download: ML20148B962 (2)


Text

_ .

NOTICE OF VIOLATION Duke Power Company Docket Nos. 50-369 and 50-370 McGuire Nuclear Plant License Nos. NPF-9 and NPF-17 During an NRC inspection conducted on February 23 through April 4,1997 violations of NRC requirements were identified. In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions."

NUREG-1600, the violations are listed below:

A. Appendix 8. Criterion V. Instructions. Procedures, and Drawings, requires, in part. that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions. procedures, or drawings.

Contrary to the above, prior to November 30. 1996, activities affecting quality, were not accomplished in accordance with these instructions, procedures, or drawings. in that, heater elements installed for freeze protectior in the Unit 1 and Unit 2 Refueling water Storage Tank (FWST) safety-related level transmitter enclosures were found to be of a higher capacity than described on engineering design drawings and documents.

Specifically, two 250 watt heater elements were installed in each enclosure, whereas the applicable design documents specified one 50 watt element per enclosure.

This is a Severity Level IV Violation (Supplement I). 1 1

B. 10 CFR 50.72 (b) (2) (i) requires, in part, that any event. found while '

the reactor is shut down, that, had it been found while the reactor was in operation would have resulted in the nuclear power plant, including ,

its principle safety barriers, being seriously degraded or being in an i unanalyzed condition that significantly compromises plant safety shall I be reported within four hours of the occurrence.

Contrary to the above, between February 26 and March 13. the licensee failed to make a timely report per the recuirements of 10 CFR 50.72 concerning a degraded condition identifiec on the Unit 1 main feedwater isolation valves during shutdown conditions. l This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201. Duke Power Com)any is hereby required to submit a written statement or explanation to t7e U.S.

Nuclear Regulatory Commission. ATTN: Document Control Desk. Washington, D.C. 20555 with a copy to the Regional Administrator. Region II. and a copy to the NRC Resident Inspector at the McGuire Nuclear Plant, within 30 days of the date of the letter transmitting this Notice of Violation Enclosure 1 9705130423 970505 PDR ADOCK 05000369 O PDR

2 (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for

the violation, or, if contested, the basis for disputing the violation.

(2) the corrective steps that have been taken and the results achieved.

(3) the corrective steps that will be taken to avoid further violations.

and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence. if the

correspondence adequately addresses the required response. If an i adequate reply is not received within the time specified in this Notice, i an order or Demand for Information may be issued as to why the license should not be modified, suspended. or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, i consideration will be given to extending the response time. j Because your response will be placed in the NRC Public Document Room (PDR). to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed
in the PDR without redaction. However, if you find it necessary to

. include such information, you should clearly indicate the specific '

information that you desire not to be placed in the PDR, and provide the i legal basis to support your request for withholding the information.from '

the public.

]

4 1

! Dated at Atlanta. Georgia l this 5th day of May.1997 i

r .

4 Enclosure 1 4

i i