ML20141F379

From kanterella
Jump to navigation Jump to search

Forwards SE Authorizing Licensee Request for Extension of First ISI Interval to 970924,per 10CFR50.55a(a)(3)(ii)
ML20141F379
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/30/1997
From: Clifford J
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20141F382 List:
References
TAC-M98996, NUDOCS 9707020325
Download: ML20141F379 (3)


Text

. ..

~

Mr. Charles M. Dugger Juna 30, 1997

. Vice President Operations l Entergy Operations, Inc. '

P. O. Box B Killona, LA 70066

SUBJECT:

EVALUATION OF THF REQUEST FOR EXTENSION OF THE FIRST INSERVICE INSPECTION INTERVA'., WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. M98996)

Dear Mr. Dugger:

The Nuclear Regulatory Conuission (NRC) staff has reviewed and evaluated the information provided by Entergy Operations, Inc. in its letter dated June M,1997, requesting, as an alternative to the first inservice inspection I (ISI) interval, an extension of the inspection interval in order to complete the required system pressure tests. The proposed alternative of extending this first ISI interval to include September 24, 1997, is authorized pursuant to 10 CFR 50.55 a(a)(3)(ii), in that compliance with the code interval would result in hardship or unusual difficulty without a compensating increase in i the level of quality and safety. The staff's evaluation and conclusion are contained in the enclosure.

Sincerely, ,

ORIGINAL SIGNED BY: l James Clifford, Acting Director

'BC E'. C " C0W eroJect oirectorate iv-i Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

NRC Staff Evaluation and Conclusion cc w/ enc 1: See next page DISTRIBUTION:

. Docket File PUBLIC PD4-1 r/f )

C. Patel J. Clifford C. Hawes J. Roe T. Gwynn, RIV E. Adensam (EGA1)

ACRS OGC (

(k i Document Name: WAT9E996.LTR n _,

OFC PM/PD4-1,M LkPQ(-lb OGC MO (A)D/PQ4-1 l NAME CPatel/[ kHkesN EHolN JCliNord DATE 6 /Z7/97 lhM97 6/ M 97 L /f0/97 COPY h/N0

~

YES/N0 YESh YESkO)

OFFICIAL RECORD COPY 9707020325 970630 PDR ADOCK 05000382 G PDR l

p Kat g *, UNITED STATES

  • } NUCLEAR REGULATORY COMMISSION

'+9 * * * * * ,o June 30,1997 1 -

i Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B Killona, LA 70066

SUBJECT:

EVALUATION OF THE REQUEST FOR EXTENSION OF THE FIRST INSERVICE INSPECTION INTERVAL, WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. M98996)

Dear Mr. Dugger:

The Nuclear Regulatory Commission (NRC) staff hos reviewed and evaluated the information provided by Entergy Operations, Inc. in its letter dated June 16, 1997, requesting, as an alternative to the first inservice inspection (ISI) interval, an extensicn of the inspection interval in order to complete the required system pressure tests. The proposed alternative of extending this first ISI interval to include September 24, 1997, is authorized pursuant to 10 CFR 50.55 a(a)(i)(ii), in that compliance with the code interval would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The staff's evaluation and conclusion are contained in the enclosure.

Sincerely, P

J mes Clifford, eting Director Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

NRC Staff Evaluation and Conclusion cc w/ enc 1: See next page

. Mr. Charles M. Dugger Entergy Operations, Inc. Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington, TX 76011 Vice President, Operations Resident Inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.

Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 i Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer Entergy Operations, Inc. l Wise, Carter, Child & Caraway P. O. Box 31995 '

P. O. Box 651 Jackson, MS 39286-1995 Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc. One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066

. Licensing Manager Entergy Operations, Inc.  !

P. O. Box B Killona, LA 70066 1

Winston & Strawn '

1400 L Street, N.W.

Washington, DC 20005-3502 i