ML20141E432

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/97-05 on 970210-14 & 24-28 & Notice of Violation.Violation Re Failure to Make 10CFR50.73 Rept Identified
ML20141E432
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/26/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20141E437 List:
References
50-483-97-05, 50-483-97-5, NUDOCS 9707010058
Download: ML20141E432 (6)


See also: IR 05000483/1997005

Text

e

  • "' % UNIT ED ST ATES

0 f, .\ NUCLEAR REGULATORY COMMISSION

.l R EGION IV

611 RY AN Ft. AZA DRIVE. Suf f E 400

/ ARLINGTON TEXAS 76011 8064

..+

JUN 2 61997

EA 97-168

Garry L. Randolph, Vice President and

Chief Nuclear Officer

Union Elactric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT 50-483/97-05 AND NOTICE OF VIOLATION

Dear Mr. Randolph:

An NRC inspection was conducted February 10-14 and ?4-28,1997, at your Callaway

Plant reactor facility. The enclosed report presents the scope and results of that

inspection. The overall conclusions of this inspection were discussed with Mr. C. Neslund

and others of your t+aff :iuring a final exit meedng held on June 24,1997.

The inspection identified two violations involving the failure to make a 10 CFR 50.73

report and to report 10 CFR 50.59 safety evaluations for temporary modifications.

Specifically, your staff failed to report that 14 main steam safety valves in Refueling

Outage 7 drifted beyond their Technical Specification setpoint tolerances. With respect to

the 10 CFR 50.59 safety evaluation reporting, your staff failed to recognize that any safety

evaluation, regardless of duration, was required to be reported. These reporting failures

indicate a lack of understanding of the NRC reporting requirements.

The violations arts cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding these violations are described in detail in the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

Based on the results of this inspection, th: .*e apparent violations were also identified and

are being considered for escalated enforcement action in accordance with the " General

Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600. These apparent violations involved the failure to perform safety evaluations

in accordance with the requirements of 10 C1 ! 50.59. The first two apparent violations

involved the failure to perform a safety evaluation for a change in the method of operation

of the post-accident sampling system and a change to the setpoints of the refueling .

machine. The third apparent violation involved the substitution of manual operation for the j

automatic actuation of the diesel generator building supply fans. This substitution may

have increased the probability of occurrence of a malfunction of equipment important to

safety previously evaluated in the Final Safety Analysis Report and increased the possibility

for a malfunction of a different type than any evaluated previously in the Final Safety

9707010038 970626 lllll

lilllOlIlllllll.illl0.ll!.!GI

-

PDR ADOCK 05000483

G PDR

. -_ .- -. . ..-_--- - - .. - . - .

. .

4

.

Union Electric Company -2-

1

4

, Analysis Report. Therefore, this substitution potentially constitutes an unreviewed safety

'

question.

, 'In addition, substituting manual actions for automatic operation of the diesel generator

building supply fans made the fans' automatic start function inoperable. Since the fans

were a subsystem of the diesel generators, it appeared that your diesel generators were

rendered inoperable during the times that the fans were in the " pull-to-lock" condition.

3 Depending on the duration that the supply fan switches were in the " pull-to-lock" position

j and the ambient temperature conditions, a violation of Technical Specification requirements

may have occurred. Tnerefore, in your response to this inspection report, we request that

you provide details regarding the specific circumstances in which the diesel generator

building supply fan control switches were in the " pull-to-lock" position.

The circumstances surrounding these apparent violations and the significance of the issues

were discussed with members of your staff at the finalinspection exit meeting on June 24,

1997. As a result, it may not be necessary to conduct a predecisional enforcement

conference in order to enable the NRC to make an enforcement decision. However, a

Notice of Violation is not presently being issued for these inspection findings. Before the

<

NRC makes its enforcement decision, we are providing you an opportunity to either .

'

(1) respond to the apparent violations addressed in thic inspection report within 30 days of

the date of this letter or (2) request a predecisional enforcement conference. Please

contact Mr. Chris A. VanDenburgh at (817) 860-8161 within 7 days of the date of this

letter to notify the NRC of your intended response. J

J

Your response should be clearly marked as a " Response to Apparent Violations in NRC

<

lospection Report 50-483/97-05" and should include for each apparent violation: (1) the

reason for the apparent violation, or, if contested, the basis for disputing the apparent

violation, (2) the corrective steps that have been taken and the results achieved, (3) the

corrective steps that will be taken to avoid further violations, and (4) the date when full

complianco will be achieved. Your response should be submitted under oath or affirmation

and may reference or include previous docketed correspondence if the correspondence

adequately addresses the required response, if an adequate response is not received

within tnv time specified or an extension of time has not been granted by the NRC, the

NRC will proceed with its enforcement decision or schedule a predecisional enforcement

conference.

in addition, please be advised that the number and characterization of apparent violations

described in the enclosed inspection report may change as a result of further NRC review.

You will be advised by separate correspondence of the results of our deliberations on this

matter.

t_

. _ . . ._ - . _ ._ . .- -- _ .

.

.

.

Union Electric Company -3- I

l

1

l

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

1 its enclosures, and your response (if you choose to provide one) will be placed in the NRC

'

Public Document Room (PDR). To the extent possible, your response should not include

any personal privacy, proprietary, or safeguards information so that it can be placed in the

i

PDR without redaction.

Sincerely, l

1

~

l

)d llt vE

Arthur T. How I til, Director

'

Division of Rea tor Safety

Docket No.: 50-483

License No.: NPF-30 ,

i

Enclosures:

1. Notice of Violation i

2. NRC Inspection Report

50-483/97-05

l

cc w/ enclosures:

'

Professional Nuclear Consulting, Inc.

19041 Paines Drive

Derwood, Maryland 20855

Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Site Licensing

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Manager - Eloctric Department

Missouri Public Service Commission

301 W. High

P.O. Box 360

Jefferson City, Missouri 65102

u.

. _ _ _ . _ - . . . . - . - . .-- . . _ ~ - . - - - . . . _ .

e

.

Union Electric Company -4-

,

.

l Ronald A. Kucera, Deputy Director

Department of Natural Resources

! P.O. Box 176 '

3 Jefferson City, Missouri 65102

Otto L. Maynard. President and

Chief Executive Officer

. Wolf Creek Nuclear Operating Corporation

i P.O. Box 411

Burlington, Kansas 66839

Dan 1. Rolef, President

Kay Drey, Representative

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

University City, Missouri 63130

Lee Fritz, Presiding Commissioner

Callaway County Court House

10 East Fifth Street

Fulton, Mi;souri 65151

Alan C. Passwater, Manager

Licensing and Fuels

Union Electric Company

P.O. Box 66149

St. Louis, Missouri 63166-6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

e

. . . -- . - - - .- - - . -. . . - . . . -

,

.

.

i

l Union Electric Company -5-

,

I

'

E-Mail report to T. Boyce (THB)

, E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (L;CDESK)

,

bec to DCD (IE01)

'i

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

,

Branch Chief (DRP/B) MIS System

,

Project Engineer (DRP/B) RIV File

'

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

DOCUMENT NAME: R:\_CW\CW705RP.TFS

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy wdh enclosures "N" = No copy

RIV:TL:EB E RI:EB Rl:EB l PM:NRR C:EB

TFStetka/Imb" PAGoldberg" WJWagner * KTh CAVan rgh

05/07/97 05/07/97 05/07/97 06/9797 06/M97

OE [j)l4 M,

~

D:DRP , D:DRp)/

/T

'

MVasquez TPGwynn ATHoWdll

06/$97 06/a /97 06j//97

  • Previously concurred OFFIC AL RECORD COPY

_-

I

l

/

Union Electric Company -5-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

Branch Chief (DRP/B) MIS System

Project Engineer (DRP/B) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

)

DOCUMENT NAME: R:\_CW\CW705RP.TFS

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy we enclosures "N" = No copy

RIV:TL:EB lE RI:EB l RI:EB PM:NRR l C:EB T~

TFStetka/Imb* PAGoldberg' WJWagner * KTh CAVan rgh

05/07/97 05/07/97 05/07/97 06/9797 06/t497

IOE hj ,fg{,

'

D:DRP ,, D:DRp)/l l l

MVasquez TPGwynn i V ATHoWell I

06//(f97 06/j/97 06C/j97 l

'Previously concurred OFFIClAL RECORD COPY

010022 l

1