Ack Receipt of Requesting Extension to Complete Clarification of TS 15.3.7 Bases Re Operator Licensing Exam Repts 50-266/96-303OL & 50-301/96-303OL.Clarification Will Be Deferred Until 970630
ML20141D618
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/15/1997
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-96-303OL, 50-301-96-301OL, NUDOCS 9705200155
Download: ML20141D618 (3)


See also: IR 05000266/1996303

Text

. _._ _ _ _ . _ _ _ . _ _ . _ __ __ _ _ . _

< i

>

1

l

l May 15, 1997

l

l

l ' Mr. S. A. Petulski

l Site Vice President .

l Point Beach Nuclear Plant

l Wisconsin Electric Power Company

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT: RESPONSE LETTER REGARDING OPERATOR LICENSING EXAMINATION

REPORTS NO. 50-266/96303(OL); 50-301/96303(OL)

Dear Mr. Patuiski:

The NRC received your letter dated April 30,1997, in which you requested an extension ,

to complete the clarification of Technical Specification 15.3.7 bases. You had previously '

committed to complete this action by May 1,1997,in your response dated February 24,

1997, to the Notice of Violation contained in Reports No. 50-266/96303(OL); 50-

301/96303(OL).

We understand that due to newly identified issues that have higher priority and the

adequacy of Technical Specification 15.3.7.B.i, cornpletion of Technical Specification

15.3.7 bases clarification will be deferred until June 30,1997. We find this extension

acceptable.

Sincerely,

/s/ Cynthia D. Pederson

Cynthia D. Pederson, Director

Division of Reactor Safety

)

Docket Nos. 50-266; 50-301

Licenses No. DPR-24; DPR-27

1

Enclosure: Ltr 4/30/97 S. A. Patuiski,

Wisconsin Electric Power Company

to USNRC, w/enci '

i

DOCUMENT NAME: G:DRS\ pol 051[7 DRS (SEE PREVIOUS CONCURRENCE)

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

0FFICE RIII RIII l RIII / PF RIII l

NAME JLennartz:jp MLeach CPede't's6n

-

DATE 05/ /97 05/ /97 0'a / /5'/97 05/ /97

0FFICIAL RECORD COPY

000AA%

9705200155 970515

l

PDR ADOCK 05000266 kllfl h' hllf
  • o

V PDR

. . _ . _.____._ _ . _ . _ _ _ . . _ . . . _ _ _ _ _ _ . . _ _ _ _ _ . . _ _ _ . _

.,_

l

l

r

Mr. S. A. Patuiski

l Site Vice President  ;

Point Beach Nuclear Plant

Wisconsin Electric Power Company

6610 Nuclear Road ]

Two Rivers, WI 54241

'

SUBJECT: RESPONSE LETTER REGARDING OPERATOR LICENSING EXAMINATION

REPORTS NO. 50-266/96303(OL); 50-301/96303(OL)

Dear Mr. Patuiski:

l

i

The NRC received your letter dated April 30,1997,in which you requested an extension

! to complete the clarification of Technical Specification 15.3.7 bases. You had previously

l committed to complete this action by May 1,1997,in your response dated February 24,

1- 1997, to the Notice of Violation contained in Reports No. 50-266/96303(OL); 50-

l 301/96303(OL).

t i

,

s

L We understand that due to newly identified issues that have higher priority and the I

l adequacy of Technical Specification 15.3.7.B.I, completion of Technical Specification

i

!

15.3.7 bases clarification will be deferred until June 30,1997, and we will allow this

extension.

1

Sincerely, '

l Cynthia D. Pederson, Director

l Division of Reactor Safety

l

Docket Nos. 50-266; 50-301

Licenses No. DPR-24; DPR-27

l Enclosure: Ltr 4/30/97 S. A. Patuiski,

Wisconsin Electric Power Company

! to USNRC, w/enci

!

DOCUMENT NAME: G:DRS\ pol 051_7.DRS

To receive a copy of this document, indicate in the box: "C" = Copy without

! attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

. OFFICE RIII l# RIII lv RIII- RIII l

NAME JLennartz:jp)d- MLeach /h4 CPederson

"

DATE 1 05/ N /97 05//s '/97 05/ /97 05/ /97

0FFICIAL RECORD COPY

l

- .

- . . . - . . . . -- __ . - -.. .

,

i

!

.

j S. A. Patuiski -2 May 15, 1997 l

l 1

l

cc w/o encl: R. R. Grigg, President and

{

Chief Operating Officer, WEPCo l

A. J. Cayia, Plant Manager

i

cc w/ encl: Virgil Kanable, Chief, Boiler Section

Cheryl L. Parrino, Chairman,

Wisconsin Public Service Commission

l State Liaison Officer

Distribution:

Docket File w/enct Rill PRR w/enct Rill Enf. Coordinator w/enci '

PUBLIC IE-42 w/enci SRI, Pt. Beach w/ encl TSS w/enci

l OC/LFDCB w/enci LPM, NRR w/ encl CAA1 w/enci

i DRP w/enci A. B. Beach, Rlli w/enci

I DRS w/enci J. L. Caldwell, Rlli w/enci

!

I

!

l

l

.

,

l

l

l

'

I

!

1

I

i  !'

!

1

.,

!

l

t

I

_

sdg

,9%

,

,

. v

Wisconsin M .

Electnc .

pQ

u

POWER COMPANY

f-

'y

Point Beach Nuclear Plant (414) 755 2321

6610 Nuclear Rd.. Two Rivers. WI 54241

NPL-97-0210

April 30,1997

Document Control Desk

US NUCLEAR REGULATORY COMMISSION

Mail Station PI-137

Washington DC 20555

Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301

INSPECTION REPORT NOS. 50-266/96303( O L k 50-301/96303(O L )

POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2

By letter dated January 23,1997, the NRC forwarded to Wisconsin Electric Power Company NRC

Inspection Reports Nos. 50-266/96303(OL); 50-301/96303(OL). Enclosed with the inspection reports

was a Notice of Violation related to a plant procedure that aligned the Vital DC Electrical System to a

configuration for which it was not designed. We issued a reply to the Notice of Violation in our letter

NPL 97-0050 dated February 24,1997.

In our reply, we committed to revise the abnormal operating procedure AOP-0.0 to ensure that a battery

charger does not power a DC bus without a battery connected to the bus. Based on the performance

limits of the PBNP battery chargers, the connection of a battery is necessary to buffer the DC output

su'fficiently to ensure the quality of DC power. These procedure changes were issued on April 11,1997.

We now believe that our procedures adequately implement the Technical Specifications and specifically

address the abnormal configuration described in the inspection report,

in our reply, we also committed to clarify the Bases of Technical Specification 15.3.7 to ensure that the

aforementioned battery charger performance limits are explicitly stated. We committed to complete this

change by May 1,1997. However, during the past month, we have assessed the priority of this task with

respect to newly identified issues that are more safety-significant, and have deferred the completion of

this task until June 30,1997. Based on the adequacy of the Technical Specification (15.3.7.B.i), and the

noted revisions to abnormal operating procedure AOP-0.0, we believe that the clarification may be so

deferred without any risk to the health and safety of the public.

!

g 06 199i

4 g g g aff

.

.IPL-97-0210 l

April 30,1997 l

Page 2

Please contact us if you have any questions or desire additional information.

Sincerely,

eh . -

Douglas F. Johnson

Manager - Regulatory Services ,

& Licensing l

GDA

cc: NRC Regional Administrator, NRC Resident inspector, NRC Project Manager

J. Lennartz NRC Region III