Forwards Addl Response to Violation from Insp Rept 50-382/97-01,per Request in
ML20141C539
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/23/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-382-97-01, 50-382-97-1, W3F1-97-0154, W3F1-97-154, NUDOCS 9706250282
Download: ML20141C539 (4)


Text

. _ _ _ . _ _ _

s y Ent:rgy Oper tions,Inc.

l Killona, LA 70066 i Tel 504 739 6242 Early C. Ewing,111 Safety & Regulatory Affairs W3F1-97-0154

A4.05

! PR l

l June 23,1997 '

l U.S. Nuclear Regulatory Commission ATTN: Dccument Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382

License No. NPF-38 NRC Inspection Report 97-01 l Additional Information for Violation Response i Gentlemen

l In accordance with 10CFR2.201, Entergy Operations, Inc. hereby submits in g

Attachment 1 the additional response for Violation 50-382/9701-02 requested in your I letter received May 23,1997.

\

if you have any questions concerning this response, please contact Tim Gaudet at (504) 739-6666.

l Very truly yours, 1

l l E. C. Ewing l Director Nuclear Safety & Regulatory Affairs ECE/DMU/tjs Attachment

, , l,k hf h l

9706250282 970623 I PDR ADOCK 05000302 G pm

~

i <

l . Additional Information to Violation Response l' W3F1-97-0154 l Page 2 June 23,1997 cc: E.W. Merschoff (NRC Region IV)

C.P. Patel (NRC-NRR)

J. Smith N.S. Reynolds )

NRC Resident inspectors Office j l

l l

l l

I I

l l

r

.: Attachment to W3F1-97-0154 Page 1 of 2 i

e ,

ATTACHMENT I ENTERGY OPERATIONS, INC. ADDITIOND. RESPONSE TO VIOLATION 0701-02 Additional Information Requested Your response to the second violation (50-382/9701-02) was lacking, in that, the described corrective actions were na rrowly focused. Specifically, the NRC inspectors reviewed 14 plant systems and the site structures monitoring program during the Maintenance Rule Baseline Team Inspection at the Waterford-3 site. We identified five examples of inadequate monitoring. Our review was a sampling of the total inventory of Waterford-3 systems, trains, and components. Your April response letter did not address the acceptability of nonsampled systems, trains, and components. Therefore, a potential exists that the effectiveness of maintenance on I other systems, trains, or components is not being monitored as required by the Maintenance Rule. Consequently, your response to the violation should address the more broader aspects of your corrective actions.

Response ,

In our violation response dated April 21,1997, Waterford 3 stated that provisions  !

would be made to monitor under 10 CFR50.65 paragraph (a)(2), the availability performance of the broad range gas monitors, PPS, CPCs and the ESF actuation system. The PSA would be reviewed and unavailability criteria established accordingly. These criteria would be reviewed and approved by the Expert Panel.

The availability maintenance history of these systems would then be reviewed against their respective (a)(2) unavailability performance criteria and a system categorization made. If it is determined that (a)(1) status is warranted, then (a)(1) l goals would be established.

l Our response also stated that provisions would be made to monitor under 10 CFR50.65 paragraph (a)(2), the reliability performance of the lift function of the containment polar crane. The (a)(2) reliability performance criteria would be j established and approved by the Expert Panel. A reliability historical review would j then be performed against criteria established and system categorization made. If j determined that (a)(1) status is warranted, then (a)(1) goals will be established.

In conjunction with above, a review of all plant systems was performed to ensure that (a)(2) performance criteria had been established commensurate with safety. This

, s

Attachm:nt to t <

W3F1-97-0154 Page 2 of 2 review paid particular attention to areas identified in the Notice of Violation (NOV). l They are (1) the adequate establishment of unavailability performance criteria for Risk Significant and Standby Systems down to the train and channel level and (2) correct use of NUMARC 93-01 scoping criteria for all systems (both scoped and non scoped) to ensure that all appropriate systems and functions have been included in the Maintenance Rule program.

As a result of this review, two (2) additional systems where unavailability was not l

appropriately monitored were identified. The systems are the starting air system for the Emergency Diesel Generators (EDG) and Excore Nuclear Instrumentation (ENI). I These 2 systems are in addition to those previously identified in the NOV.

For each of the 2 systems above, the PSA will be reviewed and unavailability criteria established accordingly. These criteria will be reviewed and approved by the Expert Panel. The availability maintenance history of these systems will then be reviewed against their respective (a)(2) unavailability performance criteria and a system ,

categorization made. If it is determined that (a)(1) status is warranted, then (a)(1) I goals will be established.

The additional actions addressed above will be completed by August 30,1997.

Upon completion of the above, Waterford 3 will be in full compliance. ^ )

I l

l