[ Io U.S. NUCLEAR REGULATORY COMMISSION June 1997 g OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1

t.  ! Draft DG-1067 I (+444 ,/ DRAFT REGULATORY GUIDE

Contact:

M.T. Masnik (301)415-1191 DRAFT REGULATORY GUIDE DG-1067 DECOMMISSIONING OF NUCLEAR POWER REACTORS A. INTRODUCTION 3

Decommissioning means permanently removing a nuclear facility from ser'vice and reducing T s.

radioactive material on the licensed site to levels that would permit termin$ tion of the NRC license.

_c, On June 27,1988, the NRC issued general requirements on decommissioning'that contained y

technical and financial criteria and dealt with planning needs, timing,,fi.Indlng mechanisms, and environmental review requirements (53 FR 24018). These req 5ihrnent,s were codified in 10 CFR 50.75,50.82, 51.53, and 51.95. < v On July 29,1996, a final rule amending the regulatioris on' decommissioning procedures was

~

published in the Federal Reaister (61 FR 39278)gThe final rule amended 10 CFR Part 2, " Rules of Practice for Domestic Licensing Proceedings and'Issdance of Orders," Part 50, " Domestic Licensing of Production and Utilization Facilities," and Pa tf51, " Environmental Protection Regulations for Dornestic Licensing and Related Regulator Functions." This rule clarified the regulations for decommissioning nuclear power fasilities.iThe final rule reflects the experience and knowledge gained during actual facility decommissionings, industry and government sponsored workshops, and conferences on decommissioning. The rule clarifies ambiguities in the previous regulations, reduces unnecessary requirements lprovides additional flexibility, and codifies procedures and terminology that have been used on a case-by-case basis. In addition, the rule increases the opportunities for the public to.become ir5 formed about a licensee's decommissioning activities. The new rule is designed th'estdblisEa level of NRC oversight commensurate with the level of safety concerns ,9 Y expected during' decommissioning activities. '

1 d i This regulatory guide is being issued in draf t form to involve the public in the early stages of the development of a regulatory position in this area. It has not received complete staff review and does not represent an official NRC staff position.

Public comments are being solicited on the draf t guide (including any implementation schedule) and its associated regulatory analysis or value/ impact statement. Comments should be accompanied by appropriate support;ng data. Written comments may be subtrutted to the Rules Review and Directives Branch, DFIPS, office of Administration. U.S. Nuclear Regulatory Commission, Washington, DC 20555. Copies of comments received may be examined at the NRC Public Do I if ,eceived by August 18,1997. lllEllUlllll$l$ll$ll Elll Wash ngton, DC. Comments will be most helpful Requests for single copies of draft or active regulatory guides (which may be reproduced) or for placement on an automatic distribution list for single copies of future draf t guides in specific devisions should be made in writing to the U.S. Nuclear Regulatory Commission, Washington. DC 20555, Attention: Distnbution and Mail Services Section, or by f ax to (3011415-2200.

9706160105 970630 PDR REGGD 01.XXX R PDR

The new rule extends the use of 10 CFR 50.59 to allow licensees to make changes to facilities undergoing decommissioning using these requirements. Prior to the final rule of July 29,1996, decommissioning activities were authorized only if they were consistent with an NRC-approved decommissioning plan. Significant deviations from the decommissioning plan required prior approval from the NRC staff.

To facilitate understanding of the decommissioning process, the NRC staff has divided the decommissioning activities for power reactors into three phases. The first phase of decommissioning includes the initial activities, starting on the effective date of permanent cessation of operations and encompassing the activities before the licensee either places the power reactor in a storage mode or tjegins major decommissioning activities. The second phase encompasses activities during the storage period or during major decommissioning activities (i.e., decontamination and dismantlement), or some combination of the two. The third phase consists of the rest of the activities the licensee undertakes to terminate the license. The amendments to 10 CFR Parts 2 and 51 in the final rule pertain to this third phase of decommissioring.

The " Final Generic Environmental Impact Statement (GEIS) on Decommissioning of Nuclear Facilities," NUREG-0586) dated August 1988, evaluates the environmentalimpact of three methods for decommissioning. The supplementalinformation to the 1988 decommissioning rule (53 FR 24019) also discusses the three decommissioning methods. A short summary of the three methods f 7l lows.

DECON: The equipment, structures, and portions of the facility and site that contain radioactive contaminants are removed or decontaminated to a level that permits termination of the license shortly after cessation of operations. The GEIS found DECON to I be an acceptable decomrr.issioning method.

SAFSTOR: The facility is placed in a safe stable condition and maintained in that state until it is subsequently decontaminated and dismantled to levels that permit license termination. During SAFSTOR, a facility is left intact, but the fuel has been removed from the reactor vessel and radioactive liquids have been drained from systems and components

' Copies are available at current rates from the U S Government Pnnting Office, P.O. Box 37082, Washington, DC 20402-9328 (telephcne (202)512-2249); or from the National Technical Information Service by wnting NTIS at 5285 Port Royal Road, Springfield VA 22161. Copies are available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW.. Washington, DC; the PDR's maihng address is Mail Stop LL-6, Washington, DC 20555; telephone (202)634-3273; fax (202)634-3343.

2

l l

and then processed. Radioactive decay occurs during the SAFSTOR period, thus reducing the quantity of contaminated and radioactive material that must be disposed of during decontamination and dismantlement. The GEIS found SAFSTOR to be an acceptable decommissioning method.

ENTOMB: ENTOMB involves ercasing radioactive structures, systems, and components in a structurally long-lived substance, such as concrete. The entombed structure is appropriately maintained, and continued surveillance is carried out until the radioactivity decays to a level that permits termination of the license. Because most power reactors will have radionuclides in concentrations exceeding the limits for unrestricted use even after 100 years, this option will generally not be feasible. However, this option might be acceptable for reactor facilities that can demonstrate that radionuclide levels will decay to unrestricted use levels in about 100 years.

The NRC recognizes that some combination of the first two methods would also be acceptable. For example, the licensee could conduct a partial decontamination of the plant followed by a storage period, followed by the completion of the decontamination and dismantlement.

This draft regulatory guide applies on'y to power reactor licensees. The regulations for non-power reactor licen::ees are given in 10 CFR 50.82(b) and have only a few changes from the 1988 decommissioning rule. The NRC staff plans to discuss the changes for non-power reactor license decommissioning in an update of NUREG-1537," Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors."'

The revised regulations require power reactor licensees that were engaged in decommissioning at the time the final rule became effective to convert to and comply with the final rule. Alllicensees are required to comply with the decommissioning procedures specified in the final rule, and no "grandfathering" considerations are applicable.

This regulatory guide is being developed to describe methods and procedures that are acceptable to the NRC staff for implementing the requirements of the final rule that relate to the initial activities and the major phases of the decommissioning process. This regulatory guide will not contain guidance on the license termination process. Guidance on the requirements in 10 CFR 50.82(a)(9), on the license termination plan, will be issued as a format and content regulatory guide and a standard review plan section; drafts of which are expected to be available in December 1977. This regulatory guide does not contain guidance on the 3

management or funding for the storage of spent reactor fuel during the decommissioning period.

Requirements for the storage and management of spent fuel during the decommissioning period (before the U.S. Department of Energy takes title to the spent fuel and the fuelis actually transferred to the Secretary of Energy) and for financial assurance are separate from site d:: commissioning activities and are contained in 10 CFR 50.54(bb). Requirements for the licensing of independent storage of spent nuclear fuel at a facility are addressed in 10 CFR Part

72. This regulatory guide also does not address the shipment or disposal of low-level, high-1:, vel, or greater-than Class-C waste, which are covered in 10 CFR Part 71 (shipment) and 10 CFR Parts 60 and 61 (disposal).

Regulatory guides are issued to describe and make available to the public such information cs methods acceptable to the NRC staff for implementing specific parts of the NRC's r:gulations, techniques used by the staff in evaluating specific problems or postulated accidents, and data needed by the NRC staff in its review of applications for permits and licenses. Regulatory guides are not substitutes for regulations, and compliance with them is not rcquired. Regulatory guides are issued in draf t form for public comment to involve the public in the early stages of developing regulatory positions. Draft regulatory guides have not received complete staff review, do not represent an official NRC position, and are subject to change after comments from the public have been received.

The information collections contained in this draft regulatory guide are covered by the requirements of 10 CFR Parts 2,50, and 51, which were approved by the Office of Management and Budget, approval numbers 3150-0136,0011, and 0021. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

B. DISCUSSION Reactors that are permanently shut down and have no fuelin the reactor vessel present a significantly reduced risk to public health and safety. The final decommissioning rule specifies applicable requirements for such facilities by eliminating, revising, or extending operating reactor requirements commensurate with the importance to safety.

Decommissioning activities for power reactors may be divided into three phases: (1) initial activities, (2) major decommissioning and storage activities, and (3) license termination activities. Figure 1 is a general timeline for the decommissioning of power f acilities, emphasizing the activities occurring during the first two phases of decommissioning.

4

c- __

l In accordance with 10 CFR 50.82(a)(1)(i), a licensee who has determined to permanently cease operations is required to submit written certification to the NRC within 30 days of the

decision or requirement to permanently cease operations. The certification must state the date the licensee has permanently ceased, or will cease, power generation operations (sae 10 CFR 50.4(b)(8)). Once the fuel has been permanently , . moved from the reactor vessel to the spent fuel poolin conformance with the facility's technical specificahns, and a certification of this event has been received and docketed by the NRC (see 10 CFR 60.*'hi(91.ad 10 CFR 50.82(a)(1)(ii)), the Part 50 license will no longer authorize operation of the reactor or allow the movement of fuel into the reactor vessel (see 10 CFR 50.82(a)(2)). This would entitle the licensee to a fee reduction and woulo eliminate the obligation to adhere tc certain regulatory requirements needed only during reactor operation.

For power reactor licensees,10 CFR 50.82(a)(3) states that decommissioning must be completed within 60 years of permanent cessation of operations. Completion of decommissioning beyond 60 years will be approved by the NRC only when necessary to protect public health and safety. The " Final Generic Environmental Impact Statement (GEIS) on Decommissioning of Nuclear Faci;ities," NUREG-0586,' describes alternative methods for decommissioning (DECON, SAFSTOR, and ENTOMB) arid the environmental impacts associated

) with decommissioning of reactors. The licensee may elect to use a combination of DECON and v

SAFSTOR, such as a partial decontamination of the facility before a storage period followed by the completion of the decontamir.ation. During the decommissioning process, the licensee must comply with all other applicable rules and regulations, in accordance with 10 CFR 50.82(a)(4)(i), prior to or within two years following permanent cessation of operations, the licensee is required to submit a post-shutdown decommissioning activities report (PSDAR). The PSDAR would be prepared in accordance with the forthcoming guidelines to be provided in the standard format and content occument, which is under development as a regulatory guide. The PSDAR willinclude a description of the licensee's planned decommissioning activities, with a schedule for the accomplishment of significant milestones and an estimate of expected costs. The licensee will also evaluata the environmentalimpacts associated with the site-specific decommissioning activities, if the postulated impacts have already been considered in previously approved environmental

( assessments and environmentalimpact stctements, the licensee will document this in the PSDAR. The analysis of the specific environmentalimpacts associated with the h decommissioning activities need not be included in the PSDAR. If environmentalimpacts are

/ identified that have not been considered in existing environmental assessments, the licensee 5

must address the environmentalimpacts in a request for a license amendment regarding the activities and must suomit a supplement to the environmental report relating to the additional impacts. See 10 CFR 50.82(a)(6)(ii)and 51.53(b).

No major decommissioning activities may be performed until 90 days af ter the NRC receives the PSDAR. The purpose of the 90-day period is to allow sufficient time for the NRC staff to examine the PSDAR, to publish notification of receipt of the PSDAR in the Federal Reaister, to hold a public meeting in the vicinity of the facility to discuss the licensee's plans for decommissioning, and to conduct any necessary safety inspections prior to the initiation of major decommissioning activities.

Ninety days after the NRC receives the PSDAR, and af ter certification of permanent cessation of operations and permanent removal oi fuel from the reactor vessel, the licensee could begin to perform major decommissioning activities without specific NRC approval using the process described in 10 CFR 50.59. Major decommissioning activities are defined in 10 CFR 50.2 as "any activity that results in permanent removal of major radioactive components, permanently modifies the structure of the containment, or results in dismantling components for shipment containing greater than class C waste. " These activities could include permanent removal of major radioactive components. Major radioactive components are defined in 10 CFR 50.2 as "...the reactor vessel and internals, steam generators, pressurizer, large bore reactor coolant system piping, and other large components that are radioactive to a comparable degree."

The amended 10 CFR 50.82(a)(6) states that the licensee must not perform any decommissionin0 activity that (1) forecloses release of the site for possible unrestricted use, (2) causes any significant environmentalimpact not previously reviewed, or (3) results in there no longer being reasonable assurance that adequate funds will be available for decommissioning.

If any major decommissioning activity would not meet these conditions, the licensee must i

submit a license amendment request that would provide an opportunity for a public hearing.

The NRC staff will, during the annual 50.59 inspection, evaluate the licensee's procedures for Gnsuring that these three restrictions are part of the screening criteria for changes made to the facility.

An application for termination of a Part 50 license must include a license termination plan.

The license termination plan must be a supplement to the Final Safety Analysis Report (FSAR),

or equivalent, and must be submitted at least 2 years prior to the expected terrnination of the license as scheduled in the PSDAR. Guidance on the license termination process is being developed and will be issued separately.

6

DECOMMISSIONING TIMELINE License Permanent Cessation of Operations Termination Certification of permanent cessation of operation Imtial Activities Major Decommissioning Preparation for storage. Activities to

}

Activities storage or dismantlement Terminate the License Decommissioning Plannmg  : 30

4 days  :  : Variable Time Penod  :  : 2 years  :

a withm

. 2 years Public Meeting

90 days  :
  • 30 +i
  • I'  : PSDAR License Termination c .

N  : submittal Plan submitted E

o  :

"  : Certification of permanent

  • ~ *

. fuel removal (variable)

Radiological Decommissioning Remainder of the Radiological Decommissioning Plannmg s3% .

37c - 23% of the amount Decommissionmg Trust Fund of the amount specified in %50.75(c) specified in 150.75(c) 1 Use of Decommissioning funds within 2 years Site Specific Decommissioning Cost Estimate Submittal

The amended Part 50 no longer requires a licensee to submit a preliminary 1 decommissioning plan 5 years prior to the expiration of the license. However,10 CFR 50.75(f)(1)does require the licensee to submit a preliminary cost estimate for decommissioning, including an up-to-date assessment of major factors that could affect the cost of decommissioning,5 years prior to the projected end of operation.

The final rule changes the licensee's ability to access the trust funds for decommissioning required by 10 CFR 50.75. The licensee's ability to use these funds is dependent on reaching certain milestones in the decommissioning process. This limitation on the accessibility of the dncommissioning funds is designed to ensure there are always sufficient trust funds available to place the facility in a safe, stable condition that ultimately leads to decommissioning and license termination. The licensee may use up to 23 percent of the amount (specified in 10 CFR 50.75) of the decommissioning trust funds for decommissioning activities prior to submitting a site-specific decommissioning cost estimate. An initial 3 percent can be used by the licensee, even prior to permanent cessation of operation, for planning the decommissioning. An additional 20 percent may be used for actual decommissioning or reaoying the facility for long-term storage.

This additional 20 percent may be used only after the licensee has submitted the certifications specified by 10 CFR 50.82(a)(1)and af ter the 90- day period following the submittal of the PSDAR. The remaining decommissioning trust funds would be available for decommissioning activities af ter the licensee submits a site-specific decommissioning cost estimate to the NRC.

The final rule requires the licensee to submit the site-specific cost estimate no later than 2 years after permanent cessation of operation. Information in NUREG/CR-0672," Technology, Safety and Costs of Decommissioning a Reference Boiling Water Reactor Power Station" (June 1980)

(including Addenda 1 through 4), NUREG/CR-0130, " Technology, Safety and Costs of Decommissioning a Reference Pressurized Water Reactor Power Station" (June 1978)(including Addenda 1 through 4),' NUREG/CR-5884," Revised Analysis of Decommissioning for the Reference Pressurized Water Reactor Power Station" (November 1995), and NUREG/CR-6174,

" Revised Analysis of Decommissioning for the Reference Boiling Water Reactor Power Station" (July 1996), may be helpfulin developing the site-specific cost estimate.

The staff recognizes that during planning for decommissioning it is necessary to consider activities leading to license termination and the storage of spent fuel; therefore, the staff's interpretation of the appropriate use of these planning funds will permit planning for allissues related to tho decommissioning of the facility. However, decommissioning trust funds should not be used for the maintenance and storage of spent fuelin the spent fuel pool, or for the design or construction of spent fuel dry storage facilities, or for other activities not directly l

8 1

related to the long-term storage, radiological decontamination or dismantlement of the facility,

} or decontamination of the site.

C. REGULATORY POSITION

1. APPLICABILITY This regulatory guide applies to all power reactor licensees, including those who have submitted a decommissioning plan for approval or who possess an NRC-approved decommissioning plan on the effective date of the amendment, August 28,1996. The approved decommissioning plan and the associated environmental review are considered to be the PSDAR submittal. If a licensee has submitted a decommissioning plan and the staff has not taken final action on the plan, the staff will consider the decornmissioning plan to be the PSDAR submittal. The staff would require the licensee to update the PSDAR if it is deficient.
2. CERTIFICATION OF PERMANENT CESSATION OF OPERATIONS I As stated in 10 CFR 50.82(a)(1)(i), when a licensee has determined to permanently cease operations, the licensee must submit a written certification to the NRC within 30 days of that determination. Note that the rule requires submittal of the certification within 30 days of the determination to cease operations, rather than within 30 days of facility shutdown. The NRC considers that the 30-day clock star.s on the day the licensea publicly announces the date the facility will permanently cease operations. When the facility has been shut down for a period of time, the date of permanent cessation of operations would correspond to the day the decision is made not to return to power generation operations. If an order is issued by the NRC to cease operations, the certification would be required within 30 days of the effective date of the order.

According to 10 CFR 50.4(b)(8), the certification must state the date on which power generation operations have permanentiy ceased, or will permanently cease, and the signed and notarized certification must be submitted by the licensee to the Document Control Desk, Nuclear Regulatory Commission, Washington, DC 20555-0001. This certification will be deemed to have already been submitted for licensces whose licenses were permanently modified before the effective date of the rule to allow possession, but not operation of the facility, as stated in 10 CFR 50.82(a)(1)(iii).

I 9

Following submittal of the certification for permanent cessation of operations, the facility lic:nse continues in effect beyond the expiration date until the NRC notifies the licensee in writing that the license has been terminated (10 CFR 50.51). No amendment to extend the expiration date of the license is required for a permanently shutdown facility.

Receipt by the NRC of the certification of permanent cessation of operation will be viewed as a commitment by the licensee to cease operations on that date. Following submission of the certification of permanent cessation of operations, or at any time during the decommissioning process,if the licensee desires to again operate the facility, the licensee must notify the NRC of its intentions in writing. The procedures for requesting approval to return the facility to op; ration would be handled on a case-by-case basis, and the approval would depend on the facility status at the time of the request to relicense.

3. CERTIFICATION OF PERMANENT REMOVAL OF FUEL Once the licensee has permanently removed the fuel from the reactor vessel,10 CFR 50.82(a)(1)(ii) requires the licensee to submit written certification to the NRC, consistent with the requirements given in 10 CFR 50.4(b)(9), stating the date the fuel was permanently removed from the reactor vessel and stating the disposition of the fuel. For example, the licensee should state whether the spent fuel was transferred to another Part 50 licensee, or placed in the facility's spent fuel pool, or stored in an independent spent fuel storage installation (ISFSI). This certification should be signed and notarized, and the original submitted to the Document Control Desk, Nuclear Regulatory Commission, Washington, DC 20555-0001.

Although the certification for permanent cessation of operation can be submitted before the facility has ceased operation, the certification of permanent removal of fuel can only be submitted after all the fuel has been removed from the reactor. In 10 CFR 50.2, permanent fuel removal for a nuclear power reactor facility is defined as "a certification by the licensee to the NRC that it has permanently removed all fuel assemblies from the reactor vessel."

This certification wi4 be deemed to have already been submitted for licensees whose licenses were permanently modified before the effective date of the rule to allow for possession, but not operation, of the facility, as stated in 10 CFR 50.82(a)(1)(iii).

There are no requirements on the duration between the decision to permanently cease i operations and the certification of permanent fuel removal. However, until the certification of permanent fuel removal has been received by the NRC, the licensee will not qualify for the removal of those regulatory requirements that a.a no longer necessary to protect public health 10

and safety as a result of the non-operational status of the facility or for a reduction in the fees required by 10 CFR 171.15.

}

The NRC staff expects to receive the certification to permanently cease operations before the certification of permanent fuel removal, although it would also be acceptable to the NRC staf f to receive a combined certification, for instance, if the core had been off-loaded before the decision was made to permanently cease operations. According to 10 CFR 50.82(a)(2), upon docketing of both the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel, or when a finallegally effective order to permanently cease operations has come into effect, the 10 CFR Part 50 license no longer authorizes the operation of the reactor or placement of fuelinto the reactor vessel.

4. POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT Prior to or vHthin two years after permanent cessation of operations, the licensee is required by 10 CFR 50.82(a)(4)(i)to submit a Post-Shutdown Decommissioning Activities Report (PSDAR) to the NRC and to send a copy to the affected States. It is suggested the affected States should include those within 8 kilometers [5 miles) of the facility. The purpose m

of nctifying the affected States is to actively involve the States in the decommissioning process N

I if they choose to participate.

The PSDAR may be submitted before cessation of operations or at the declaration of l

cessation of operations. Submittal of the FSDAR before cessation of operations would minimize any delay in decommissioning activities caused by a 90-day waiting period for the document's review, which is specified in 10 CFR 50.82(a)(5) and discussed in Regulatory Position 6. For example,if a licensee chose to provide a PSDAR to the NRC and the affected States 1 year prior to the permanent cessation of operations, the NRC staff docketed the PSDAR and held a public meeting, and the 90-day period elapsed, major decommissioning activities could begin immediately after reactor shutdown and defueling provided the certifications required by 10 CFR 50.82(a)(1)(i) and 10 CFR 50.82(a)(1)(ii) have been submitted to the NRC.

For a multi-reactor site, a single PSDAR could address all the activities for all the reactors at the site, assuming there is a reasonably short time betweeri permanent cessation of operations for the individual units.

According to 10 CFR 50.82(a)(4)(i),the PSDAR willinclude a description of the planned decommissioning activities, a schedule for the completion of these activities, an estimate of expected costs, and a discussion that provides the reasons for concluding that the 11 1

environmentalimpacts associated with the site-specific decommissioning activities will be bounded by appropriate, previously issued environmentalirnpact statements. These could include site-specific environmental assessments or environmentalimpact statements and the

" Final Generic Environmentalimpact Statement (GEIS) on Ducommissioning of Nuclear Facilities," NUREG-0586.' Licensees who did not perform an environmental review for initial licensing, or who do not have a Final Environmental Statement issued by the NRC, and do not have an adequate environmental assessment, mSy need to submit an environmental report for their decommissioning activities before major decommissioning activities may occur.

Guidance is being developed on the contents of the PSDAR and it will be issued as a standard format and content regulatory guide for PSDARs, with examples of appropriate leveis of detail for the document, including the bases for the estimation of the expected cost. Any background information or analyses required for the discussion of environmentalimpacts should b3 documented and made available for onsite inspection by the NRC. A licensee will not be allowed to proceed with major decommissioning activities if there is an environmentalimpact that is not bounded by a previously issued environmental assessment or impact statement, that is, if the environmental consequences of a particular decommissioning activity are expected to b3 greater than the consequences predicted in previously issued environmental assessments.

The licensee would be required to submit a license amendment for the specific activity and update the environmental report to provide an assessment of the environmentalimpacts of the particular decommissioning activity. The NRC staff would review the environmental report, prepare an environmental assessment of the action, and issue a license amendment for the activity.

Although the NRC will review the PSDAR, NRC approval of the PSDAR is not required.

However, should the NRC's review determine that the licensee's PSDAR is deficient, the NRC willinform the licensee in writing of the deficiencies and require the deficiencies to be addressed prior to the initiation of major decommissioning activities.

A number of factors could cause the NRC to find the PSDAR deficient. These factors are directly related to the topics to be included in the contents of the PSDAR, as discussed above.

The NRC could find the PSDAR deficient if the licensee's plan for decommissioning could not be completed as described (for example,if the plan called for an immediate decontamination and dismantlement of the facility and there were no waste disposal facilities available for the facility to use). The NRC could find the PSDAR deficient if the schedule included a decommissioning process that could not be completed within 60 years of the permanent cessation of operations (as required by 10 CFR 50.82(a)(3))unless it were shown that this action is necessary to 12

protect public health and safety (if so, approval would be made on a case-by-case basis).

Factors that should be considered for an extended decommissioning process include the unavailability of low-level waste disposal capacity and other site-specific f actors affecting the licensee's capability to carry out decommissioning in the given time period, including the presence of other operating nuclear facilities at the site. The NRC could find the PSDAR deficient if the licensee's decommissioning plans, as presented in the PSDAR, included a decommissioning process that obviously could not be completed for the estimated cost (the NRC staff will base this decision on the generic guidelines and on previous facility decommissioning costs). The NRC would also find a PSDAR deficient if it included activities that would endanger the health and safety of the public by being outside the NRC's health and safety regulations or would result in a major detrimental impact to the environment that is not bounded by the current environmentalimpact statements.

5. PUBLIC MEETING The NRC will place a notice of receipt of the PSDAR in the Federal Reaister and make the PSDAR available for public comment. A copy of the PSDAR will be made available to the public

-s

) at the local Public Document Room. The NRC will also schedule a public meeting,in the vicinity of the licensee's facility, pursuant to the regulations in 10 CFR 50.82(a)(4)(ii). To the extent possible, the public meeting should be held within 90 days of the NRC's receipt of the licensee's PSDAR submittal. Normally, the meeting will be held at least 30 days before the 90-day period ends. A notice of this public rneeting will be published by the NRC in the Federal Reaister and in a place or places readily available to individuals in the vicinity of the site, such as a local newspaper. The '3tice will also be sent to the local Public Document Room. The notice will provide the date, time, and location of the meeting, as well as a brief description of the purpose of the meeting.

The public meeting will be informational and is expected to be chaired by a local official.

During the public meeting, the licensee will be invited to present its plans for decommissioning.

Representatives from the affected States will also have the opportunity to participate. State l and local officials will be invited to comment on the licensee's PSDAR. NRC staff will discuss l

the regulatory process to be followed for decommissioning the facility. Comments received by

/

l the NRC staff on the PSDAR will be addressed at the public meeting, and a question and

[, answer period will follow the presentations. A written transcript of the meeting will be prepared

) and made available to the public through the local Public Document Room.

13

6. INITIAL ACTIVITIES I

The licensee may not perform any major decommissioning activities, as defined in 10 CFR 50.2, until 90 days af ter the date the NRC receives the licensee's PSDAR submittal and until the certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel have been submitted, as stated in 10 CFR 50.82(a)(5). The NRC staff may use this 90-day period to conduct any pre-decommissioning inspections necessary to verify that the 1 licensee's programs and controls are adequate to ensure that decommissioning activities are l conducted safely and the environment is protected. After 90 days, the licensee may proceed with major decommissioning activities allowed under 10 CFR 50.82 unless the NRC formally informs the licensee of any deficiency in the PSDAR within the initial 90-day period.

Licensees may opt to submit the PSDAR before permanent cessation of operations or j

p rmanent removal of fuel to minimize any delay in decommissioning activities resulting from the 90-day waiting period. However, the certifications for permanent cessation of operations and permanent removal of fuel must be submitted before major decommissioning activities can be initiated.

7. MAJOR DECOMMISSIONING ACTIVITIES As long as fuel remains in the reactor core, facility modifications pursuant to 10 CFR 50.59 must be consistent with continued facility operation. Once the licensee certifies that the facility has permanently ceased operation and the fuel has been permanently removed from the reactor vessel, the provisions of 10 CFR 50.59 that are consistent with a permanently shutdown reactor apply. In addition, as stated in 10 CFR 50.82(a)(6), licensees of permanently shutdown reactors may not perform any decommissioning activities that would foreclose the release of the I site for possible unrestricted use, that would result in significant environmentalimpacts that have not previously been reviewed, or would result in there no longer being reasonable assurance that adequate funding is available for decommissioning.
8. TECHNICAL REGULATIONS The final rule of July 1996 explicitly extends requirements for specific parts of the '

technical specifications that will cover decommissioning activities. Technical specifications (os discussed in 10 CFR 50.36) will be developed on a case-by-case basis. The licensee will review 14 l

____l _

the operational technical specifications and determine which specifications are no longer

}

applicable and which should remain in force. The licensee will make the appropriate submittals to request changes to the Technical Specifications as required by the regulations.

Technical specifications on effluent releases will be required as specified in 10 CFR 50.36a. In addition to technical specifications that require compliance with the applicable provisions of 10 CFR 20.1301, technical specifications would be developed that would require that operating procedures for the control of effluents be established and followed as given in 10 CFR 50.34a(c) and that the radioactive waste system, pursuant to 10 CFR 50.34a, be maintained and used. The licensee is required by 10 CFR 50.36a(1) to retain these operating procedures as a record until the NRC terminates the license. The licensee is required to keep all superseded revisions to the procedures for three years from the date they were superseded.

Licensees will still be required by 10 CFR 50.36a(a)(2) to submit an annual report to the NRC that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and gaseous effluents during the previous 12 months, including any other information that may be required by the NRC to estimate maximum potential annual radiation doses to the public resulting from effluent releases. The time between submission of the reports must be no longer than 12 months. If quantities of radioactive materials released during the reporting period are significantly above the design objectives for the facility when it was operating, the report must specifically address the reasons for this variation. The NRC will use these reports, along with additional information, to require the licensee to take actions the NRC l

deems appropriate. Licensees may continue to use the values set out in 10 CFR Part 50, Appendix l, " Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the Criterion "As Low As is Reasonably Achievable" for Radioactive Materialin Light-Water-Cooled Nuclear Power Reactor Effluents," which provide numerical guidance for meeting the requirements for radioactive materials in effluents released to unrestricted areas.

Other requirements for the licensee during the period of major decommissioning activities include the following.

8.1 The Maintenance Rule The maintenance rule,10 CFR 50.65," Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," requires monitoring the performance or condition of structures, systems, or components. For licensees who have submitted the certifications for cessation of operation and for permanent fuel removal specified in 10 CFR 50.82(a)(1),this 15

section applies only to the extent the licensee monitors the performance or condit ion of the structures, systems, and components associated with the storage, control, and maintenance of spent fuelin a safe condition and in a manner sufficient to provide reasonable assurance such structures, systems, and components are capable of fulfilling their intended functions (see 10 CFR 50.65(a)(1)).

8.2 Maintenance of the Final Safety Analysis Reoort The Final Safety Analysis Report (FSAR), or other comparable document, provides a licensing basis document for the evaluation of licensee activities under 10 CFR 50.59. This licensing basis will have to be updated to cover decommissioning activities. According to 10 CFR 50.71(e)(4), subsequent revisions updating the licensing basis must be filed with the NRC at least every 24 months by nuclear power facilities that have submitted certifications for permanently ceasing operations and for permanent removal of fuel.

For permanently shutdown facilities that have not maintained their FSAR or comparable document (i.e., Final Hazards Summary Report or Decommissioning Safety Analysis Report), the licensee is prohibited from using the 10 CFR 50.59 evaluation process to make changes to the facility. Until the FSAR or comparable documents reflect the current facility conditions and relate these conditions to the design basis accidents, changes to the facility will require prior NRC approval.

Specific sections of the FSAR that should continue to be updated periodically include the following.

8.2.1 Eacility Description The facility status will be described at the time the facility is shut down, before any decommissioning or dismantlement activities occur. Only those facility structures, systems, or components that are included in the technical specifications or that directly affect the safe storage of ir:adiated fuel should be updated. This section should include an updated description of any engineered safety features that are required to ensure the safe storage of the irradisted fuel. Periodic revision of the FSAR or comparable document, facility drawings, and piping and instrument diagrams are not required during dismantlement unless the information directly affects the safe storage of irradiated fuel.

16 eI

8.2.2 Licensee Oraanization The FSAR or comparable document should include a description of the licensee's corporate

}

and site organization during decommissioning. The structure, functions, and responsibilities o' the onsite organization established to decommission the facility should be described.

8.2.3 Radioactive Waste Manaaement The scope remains the same as the current FSAR requirements.

8.2.4 Radiation Protectign The scope remains the same as the t. ant FSAR requirements.

8.2.5 Conduct of Operations The scope remains the same as the current FSAR requirements.

8.2.6 Site Characterization Any sections of the FSAR that could affect the safe storage of fuel or could directly affect the design basis of the f acility should be updated, i

8.2.7 A_ccident Analysis Any new or different design basis accidents should be included (for example, consideration of accidents involving a newly installed gas pipeline). Conversely, as decommissioning progresses, any design basis accidents that are no longer possible should be removed from the FSAR or comparable document (e.g., the design basis of a facility that has transferred its spent fuel from the spent fuel pool to an ISFSI would be significantly changed and the FSAR should reflect this).

8.3 Fire Protection Reauirements The fire protection requirements of 10 CFR 50.48(f) have been revised to require licensees who have certified the permanent cessation of operations and the removal of fuel from the reactor vessel to maintain a fire protection program to address the potential for fires that could cause the release or spread of radioactive materials, which could result in a radiological hazard.

x This amendment also has eliminated the requirements to ensure the safe shutdown of the facility.

17 l

The fire protection rule, at 10 CFR 50.48, requires licensees to assess the fire protection program on a regular basis and revise it, as needed, throughout the various stages of facility decommissioning. However, the rule also permits the licensee to make changes to the fire protection program without NRC approvalif these changes do not reduce the effectiveness of fire protection for facilities, systems, and equipment that could result in a radiological hazard, taking into account the conditions and activities of decommissioning at the facility. The objectives of the fire protection programs are to (1) reasonably prevent such fires from occurring, (2) rapidly detect, control, and extinguish fires that could result in a radiological hazard, and (3) minimize the risk of fire-induced radio!ogical hazards to the public, environment, and plant personnel.

8.4 Actions by Certified Fuel Handlers According to 10 CFR 50.54(y), either a certified fuel handler or a licensed senior operator may take reasonable actions that may depart from a license condition or technical specification in an emergency (upon NRC's review and approval of a licensee's certified fuel handler training program). This applies only to nuclear power reactor licensees that have certified that they have ceased operations and permanently removed the fuel from the reactor vessel.

9. ELIMINATED REGULATORY REQUIREMENTS l

From the time the certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel are submitted to the NRC, the Part 50 license no longer authorizes the operation of the reactor or emplacement of the fuelinto the reactor vessel (10 CFR 50.82(a)(2)). This nonoperating status also provides the basis for removing regulatory requirements that are no longer necessary to protect public health and safety at the facility. I Regulatory requirements that would no longer be applicable include the following. l Combustible gas control requirements (10 CFR 50.44)

Emergency core cooling systems acceptance criteria (10 CFR 50.46, Appendix K to 10 CFR Part 50)

Environmental qualification of electrical equipment (10 CFR 50.49)

I

Fracture prevention measures (10 CFR 50.60) 18 a

I

  • Fracture toughness requirements for protection against pressurized thermal shock events (10 CFR 50.61) l

Notifying the NRC of the termination of these programs is not required.

10. CHANGES TO THE PSDAR Following submittal of the PSDAR, and after the ' ' day waicing period, the licensee may begin major decommissioning activities provided the actions comply with the requirements in 10 CFR 50.82(a)(5) and (6) as discussed in Regulatory Position 7. However,10 CFR 50.82(a)(7) requires the licensee to notify the NRC,in writing with a copy sent to the affected States, before performing any decommissioning activity that is not consistent with or could be considered to be a change from the actions or schedules described in the PSDAR. The PSDAR and any written notification of changes required of a licensee will be used by the NRC staff to schedule inspections and provide regulatory oversight of decommissioning activities. Changes that would significantly increase the decommissioning costs would also require notification of

) the NRC with a copy sent to the affected States.

Changes to the PSDAR should be handled as follows. Changes in major milestones, scheduling, resources, or environmentalimpacts not bounded by environmentalimpact statements or assessments, or by the GEIS on decommissioning (NUREG-0586), require written notification to the NRC. The licensee's milestone schedule will be used by the NRC staff to schedule NRC inspections of licensee activities, as necessary, to provide assurance that jecommissioning is being conducted safely and in accordance with regulatory requirements.

Examples of changes in activities and schedule include, but are not limited to, changing from long-term storage to active dismantlement, changing the method used to remove the reactor vessel or steam generators from cutting and segmenting to intact removal, and changing the schedule to affect major milestones of any duration. Examples of significant increases in cost associated with decommissioning the facility would include a new estimated cost greater than 20 percent above the site-specific cost estimate or the PSDAR cost estimate, or a 25 percent increase in cost above a major milestone estimate. The significant increase in cost would require written notification to the NRC. Environmentalimpacts requiring written notification to Em the NRC would include any environmentalimpact outside the scope of the Final Environmental

)

,/ Statement for the facility (as supplemented) or the GEIS.

, 19 l

l l

l______.__________________.________.__.___

M If the licensee's PSDAR that was formerly an approved decommissioning plan does not i address dismantlement in sufficient detail and only addresses long-term storage of the facility, the licensee should submit an update before initiating major decommissioning activities.

Written notifications to the NRC made under 10 CFR 50.82(a)(7) do not require the 90-day waiting period prior to initiation of activities. The staff would not normally require a public meeting to discuss the proposed changes.

l

11. USE OF FUNDJ For a power reactor facility that is not prematurely shut down and is nearing the expiration of the license, a licensee must submit, at or about 5 years prior to the projected end of operations, a preliminary decommissioning cost estimate that includes an up-to-date assessment of the major factors that could affect the cost to decommission (10 CFR 50.75(f)(1)). For prematurely shutdown facilities, the cost estimate required by the PSDAR can either be a site-specific cost estimate or a cost estimate that relies on generic industry estimates, but the licensees of such facilities must submit a site-specific decommissioning cost estimate .vithin two years after permanent cessation of operations (10 CFR 50.82(a)(8)(iii)).

I The use of decommissioning trust funds is covered in 10 CFR 50.82(a)(8). The amounts of the decommissioning trust funds that can be used by the licensee are controlled during the initial phase of decommissioning in order to provide reasonable assurance that adequate funding will remain to decommission the facility. Expenditures from the decommissioning trust fund are allowed for legitimate decommissioning activities as currently defined in 10 CFR 50.2. The expenditures should not reduce the value of the decommissioning trust fund to below the amount necessary to place and maintain the facility in safe storage. The withdrawals from the trust fund should not adversely affect the licensee's ability to fully fund the decommissioning trust; funds must be available to ultimately release the site and terminate the license.

The licensee is allowed, in 10 CFR 50.82(a)(8)(ii), to use 3 percent of the generic amount

{

of the decommissioning funds specified in 10 CFR 50.75 for decommissioning planning, l including decommissioning planning that occurs even while a facility is still operating.

Appropriate activities include engineering designs, work package preparation, and licensing activities. Activities that would not be considered appropriate uses for these planning funds include decontamination, draining of systems, removal of filters, projects designed to demonstrate the feasibility of a particular decommissioning activity, or the decontamination of a l 20 l

building that is no longer required and would ultimately have to be decontaminated before

}

license termination.

Af ter the licensee has submitted the certifications required by 10 CFR 50.82(a)(1), and 90 days after the NRC has received the PSDAR, the licensee may use an additional 20 percent of the decommissioning funds prescribed in 10 CFR 50.75(f). These funds should be used for legitimate decommissioning activities, not for reducing the value of the trust below an amount

{

necessary to place and maintain the f acility in safe storage. The withdrawals may not be I allowed to adversely affect the licensee's ability to fully fund the decommissioning trust; the availability of funds to ultimately release the site and terminate the license must be ensured.

The licensee is prohibited from using the remaining 77 percent of the generic decommissioning funds until a site-specific decommissioning cost estimate is submitted to the I 1

NRC. This estimate must be submitted within 2 years following permanent cessation of operations (10 CFR 50.82(a)(8)(iii)). Site-specific cost estimates should include an outline of the expected costs for activities specified in the PSDAR. As an example of the appropriate level of detail, the licensee would be expected to include costs for radiological decommissioning (planning, large-component removal, decontamination activities, low level radioactive waste disposal, final radiological survey, and decommissioning finance costs). ,

1

}

Site-specific cost estimates may be provided sooner than 2 years after permanent cessation of operations. For facilities that submitted a preliminary cost estimate about 5 years before the projected end of operations, the licensee could expand and update the preliminary cost estimate and submit it as the site-specific cost estimate. The site-specific cost estimate could also be submitted with the PSDAR. If submitted with the PSDAR,it should be appropriately identified as a site-specific cost estimate. This approach would eliminate the 23 percent holdpoint for spending the decommissioning funds Licensees who plan to begin major decommissioning activities shortly after permanent cessation of operations should consider an early submittal of the site-specific cost estimates with the PSDAR.

If the licensee's PSDAR specifies a delayed completion of decommissioning, the licensee must provide a means of adjusting cost estimates and associated funding levels over the storage or surveillance period to ensure that the appropriate amount of funding will be available to terminate the license (10 CFR 50.82(a)(8)(iv)). Additional guidance will be developed and published in a standard format and guidance document for the PSDAR, which will specify the level of detail required for the financial plan to adjust cost estimates and associated funding levels.

21

D. IMPLEMENTATION The purpose of this section is to provide information to licensees regarding the NRC staff's 1 plans for using this regulatory guide.

This draft regulatory guide has been released to encourage public participation in its development. Except in those cases in which a licensee proposes an acceptable alternative method for complying with specified portions of the NRC's regu!ations, the rnethods to be described in the final regulatory guide reflecting public comments will be used by the NRC staff in the evaluation of decommissioning activities before the licensee submits its license termination plan.

9 l l

l 22

REGULATORY ANALYSIS I

A separate regulatory analysis was not prepared for this regulatory guide. The regulatory analysis prepared for the amendments to Parts 2,50, and 51,

" Decommissioning of Nuclear Power Reactors," which was issued on July 29,1996(61 FR 39278), provides the regulatory basis for this guide and examines the costs and benefits of the rule as implemented by the guide. A copy of this regulatory analysis is available for inspection or copying for a fee in the NRC Public Document Room,2120 L Street NW., Washington, DC; the PDR's mailing address is Mail Stop LL-6, Washington, DC 20555; telephone (202)634-3273; fax (202)634-3343.

l l

Printed on recycled Paper Federal Recycling Program 23

1 l l!! lI .I 'lll !i N

U C

P WL E

~

E N SA A A HR N R U L I T

YO F G E N FR OC T GI RI A OUT LE PL ,N AD RB I

D O T S VU AS C T TI ENE RA 2 Y T U S 0 CE 5

S S

.E 5O S 3

5M 0

0 0 0 M I

0 S 1

SI O

N WIDIU1 AWONS2 SFCF 0 HNUON5 I MRR5 NPEMC5 G1NA 0 T1TTO6 O7 II4 -

N COR2 ONM1 N 5 T&

R OR LE 2 C

DO I ER S SD A KS I D S C MR G I M S 2 T 1 0 1 1

5 S 5

5 P

O S

P Tn E AR R GS ET TSU AC IM NR N DNL A O. CFS S -

G E 4 EM 7

SA J PL A

D l llll l1