Forwards Insp Repts 50-313/85-27 & 50-368/85-28 on 851201-31 & Notices of Violation & Deviation
ML20140E279
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/29/1986
From: Gagliardo J, Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jeffery Griffin, Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20140E283 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8602030217
Download: ML20140E279 (2)


See also: IR 05000313/1985027

Text

7

'

,

,, .

s

JAN 2 91988

In Reply Refer To:

Dockets: ' 50-313/85-27

50-368/85-28

Arkansas Power & Light Company

ATTN: John M. Grif fin,

Senior Vice President -

Energy Supply

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson and

C. C. Harbuck of this office during the period December 1-31, 1985,-of

activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas

Nuclear One, Units 1 and 2, and to the discussion of our findings with

Mr. J. M. Levine, and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, followup on previously identified items, followup on

licensee event reports, followup on Three Mile Island Action Plan requirements,

IE Circular review, procurement program implementation, containment purge, and

control room ventilation. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. The findings are documented in

the enclosed inspection report.

'

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter. A written response is not

required for the violation involving a broken chain on a locked valve, since

adequate corrective action was taken and confirmed during this inspection

period.

i

During this inspection, it was found that certain of your activities appeared

to deviate from commitments made to the NRC. This item and references to the

i commitments are identified in the enclosed Notice of Deviation. You are

RIV:SRIh RI [' RPB/B RPB

WDJohnson/ g /

CCHarbtck DMHunn@icuttJEGag i rdo

g /p /86 )/p/86 )/p/86 / /27 83

hb0 bbh {

G

- -. . . = . -. .- . -. ..

'

> . .,  ;,

t c

Arkansas Power & Light Company -2-

<

3

1

'

requested to respond to this deviation in writing. Your response should be

based on the~ specifics contained in the Notice of Deviation enclosed with this

, .

>

. 1etter.

t

'

The responses directed by this letter and the accompanying Notices are not -

. ' subject to the, clearance procedures ~of'the Office of Management and Budget as

. required by.the Paperwork Reduction Act of 1980, PL 96-511.

Le e

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

.

.

Sincerely,

,

S. Origina! SignST By

J. E. Gagliardo

! J. E. Gagliardo, Chief

Reactor Projects Branch

i .

Enclosures:

1. Appendix A - Notice of Violation

l 2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report

l 50-313/85-27

50-368/85-28

'

cc w/ enclosures:

J. M. Levine, General Manager

Arkansas Nuclear One

P.-0. Box 608

Russellvilie, Arkansas 72801

Arkansas Radiation Control Program Director

bcc to'0MB (IE01)

bec distrib. by RIV:

  • RPB * Resident Inspector R. D. !iartin, RA
  • EP&RPB *Section Chief (RPB/B) *D. Weiss, LFMB (AR-2015)
  • RIV File E. H. Johnson, DRS&P *RSB
  • MIS SYSTEM *RSTS Operator *0RSP