MONTHYEARML20217M3371999-10-20020 October 1999 Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217F4331999-10-15015 October 1999 Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML20210G5061999-07-30030 July 1999 Responds to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates 05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics1999-07-23023 July 1999 Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics ML20210J4991999-07-22022 July 1999 Forwards Rev 18 to USAR for Pingp,Bringing USAR up-to-date as of 990228,though Some Info More Recent.Safety Evaluation Summaries Also Encl ML20209J0941999-07-15015 July 1999 Forwards SER Finding Rev 7 to Topical Rept NSPNAD-8102, Reload Safety Evaluation Methods for Application to PI Units, Acceptable for Ref in Plant Licensing Actions ML20209H8051999-07-14014 July 1999 Forwards Summary of non-modification Safety Evaluation Number 515 Re Storage of Fuel Inserts,Per Insp Rept 72-0010/99-201 ML20209D4181999-07-0707 July 1999 Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr ML20209H8361999-07-0202 July 1999 Forwards Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Issued Reactor Operator Licenses to Operate Pings ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209C3951999-07-0101 July 1999 Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20209B7541999-07-0101 July 1999 Final Response to GL 98-01,Suppl 1 Re Y2K Readiness of Computer Sys.Sys Remediated as Required for Plant Operation. Contingency Plans Developed to Mitigate Impact of Y2K-induced Events at Key Rollover Dates ML20196J8941999-06-30030 June 1999 Transmits Util Comments on Draft Regulatory Guide DG-1074, Steam Generator Tube Integrity. Licensee Recommends That NRC Focus on Several Important Listed Areas Considered Principal Concerns & Contentions ML20209F0391999-06-30030 June 1999 Forwards Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531.Violation Noted.Notice of Violation or Civil Penalty Will Not Be Issued,Based on NRC Listed Decision to Exercise Discretion ML20209C3011999-06-29029 June 1999 Forwards Annual Rept of Corrections to NSP ECCS Evaluation Models,Iaw 10CFR50.46.Since All Analyses Remain in Compliance,No Reanalysis Is Required or Planned ML20209B5751999-06-24024 June 1999 Submits Revised Relief Request for Limited Examinations Associated with Third 10-yr ISI Examination Plan.Attached Is Unit 1 Relief Request 7,rev 1 Which Addresses Limited Examinations ML20196F3871999-06-23023 June 1999 Forwards Revised Pages 71,72 & 298 of Rev 7 to NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units, Per Discussions with Nrc.Approved Version of Rept Will Be Issued 05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics1999-06-18018 June 1999 Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics ML20196D5501999-06-18018 June 1999 Forwards Individual Exam Results for Licensee Applicants Who Took May 1999 Initial License Exam.In Accordance with 10CFR2.790,info Considered, Proprietary. Without Encls ML20196A6741999-06-17017 June 1999 Refers to 990517-20 Meeting with Util in Welch,Minnesota Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F4331999-10-15015 October 1999 Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML20210G5061999-07-30030 July 1999 Responds to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates 05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics1999-07-23023 July 1999 Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics ML20210J4991999-07-22022 July 1999 Forwards Rev 18 to USAR for Pingp,Bringing USAR up-to-date as of 990228,though Some Info More Recent.Safety Evaluation Summaries Also Encl ML20209H8051999-07-14014 July 1999 Forwards Summary of non-modification Safety Evaluation Number 515 Re Storage of Fuel Inserts,Per Insp Rept 72-0010/99-201 ML20209D4181999-07-0707 July 1999 Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr ML20209C3951999-07-0101 July 1999 Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20209B7541999-07-0101 July 1999 Final Response to GL 98-01,Suppl 1 Re Y2K Readiness of Computer Sys.Sys Remediated as Required for Plant Operation. Contingency Plans Developed to Mitigate Impact of Y2K-induced Events at Key Rollover Dates ML20196J8941999-06-30030 June 1999 Transmits Util Comments on Draft Regulatory Guide DG-1074, Steam Generator Tube Integrity. Licensee Recommends That NRC Focus on Several Important Listed Areas Considered Principal Concerns & Contentions ML20209C3011999-06-29029 June 1999 Forwards Annual Rept of Corrections to NSP ECCS Evaluation Models,Iaw 10CFR50.46.Since All Analyses Remain in Compliance,No Reanalysis Is Required or Planned ML20209B5751999-06-24024 June 1999 Submits Revised Relief Request for Limited Examinations Associated with Third 10-yr ISI Examination Plan.Attached Is Unit 1 Relief Request 7,rev 1 Which Addresses Limited Examinations ML20196F3871999-06-23023 June 1999 Forwards Revised Pages 71,72 & 298 of Rev 7 to NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units, Per Discussions with Nrc.Approved Version of Rept Will Be Issued 05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics1999-06-18018 June 1999 Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics ML20195G4281999-06-0909 June 1999 Notifies That Amsac/Dss Mods Completed & TS 138/129 Has Been Fully Implemented 05000282/LER-1999-005, Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved1999-06-0707 June 1999 Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved ML20207F4301999-06-0101 June 1999 Forwards 1999 Unit 1 SG Insp Results,Per TS 4.12.E.1. Following Insp 84 Tubes Were Plugged for First Time ML20196L2461999-05-21021 May 1999 Forwards Rev 0 to COLR for Pingp,Unit 1 Cycle 20, IAW TS Section 6.7.A.6 ML20195C6861999-05-21021 May 1999 Forwards Rev 17 to USAR for Prairie Island Nuclear Generating Plant.Attachment 1 Contains Descriptions & Summaries of SEs for Changes,Tests & Experiments Made Under Provisions of 10CFR50.59 During Period Since Last Update ML20206U6781999-05-17017 May 1999 Forwards Revised Emergency Response Plan Implementing Procedures,Including Rev 15 to F3-3,rev 15 to F3-16,rev 14 to F3-22 & Table of Contents ML20206U7131999-05-17017 May 1999 Forwards Revised EOF Emergency Plan Implementing Procedures, Including Table of Contents & Rev 2 to F8-10, Record Keeping in Eof. with Updating Instructions ML20206T2461999-05-17017 May 1999 Forwards Off-Site Radiation Dose Assessment for Jan-Dec 1998, Rev 0 to Annual Radiactive Effluent Rept for 980105- 990103 & Effluent & Waste Disposal Annual Rept Solid Waste & Irradiated Fuel Shipments,Jan-Dec 1998 ML20206R0401999-05-13013 May 1999 Forwards Application for Amends to Licenses DPR-42 & DPR-60, Removing Plant Organization Requirement,Imposed in Amend 141/132 That Plant Manager,Who Has Responsibility for Overall Safe Operation of Plant,Report to Corporate Officer ML20206Q0871999-05-13013 May 1999 Forwards Result of Evaluation Re Ultrasonic Exams of SG Number 22 Performed in Accordance with ASME Boiler & Pressure Vessel Code Section Xi.Procedure Used for Evaluation Contained in WCAP-14166,submitted for Review ML20206F9381999-05-0303 May 1999 Forwards Response to NRC 990304 RAI Re GL 96-05 Program at Pingp.Licensee Commitments Are Identified in Encl as Statements in Italics ML20206J3851999-05-0303 May 1999 Forwards 1998 Annual Radiological Environmental Monitoring Rept 05000282/LER-1999-004, Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics1999-05-0303 May 1999 Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics ML20206E1761999-04-28028 April 1999 Forwards Revised TS Pages for Amends 144 & 135 to Licenses DPR-42 & DPR-60,respectively,to Update Controlled Manual or File ML20205S3221999-04-20020 April 1999 Forwards Application for Amends to Licenses DPR-42 & DPR-60, Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements of TS 5.1 ML20205P9891999-04-12012 April 1999 Requests Approval for Proposed Alternatives to Liquid Penetrant Requirements of N-518.4 of 1968 ASME Boiler & Pressure Vessel Code.Results of Analysis & Summary of Tests Performed & Tests Results Are Encl ML20205Q0191999-04-12012 April 1999 Forwards Application for Amend to License DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR 05000282/LER-1998-010, Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER1999-04-0808 April 1999 Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER ML20205P9221999-04-0101 April 1999 Submits Relief Request 8,rev 0 Which Addresses Limited Exams Associated with Unit 2 Third ten-year Interval Inservice Insp Program.Util Requests Relief Per 10CFR50.55a(q)(5)(iii) Due to Impracticality of Obtaining 100% Exam Coverage ML20205E8371999-03-31031 March 1999 Submits Four Copies of Rev 38 to Prairie Island Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Security Plan.Encl Withheld,Per 10CFR73.21 ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205Q5051999-03-30030 March 1999 Forwards Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327- 981229. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarized Results ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20204H3371999-03-19019 March 1999 Forwards Application for Amend to Licenses DPR-42 & DPR-60, Removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection 1999-09-07
[Table view] |
Text
- _ _ _ _ _ _ _ _ .--
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 March 27,1997 Generic Letter 96-04 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Nos.DPR-42 50-306 DPR-60 Supplemental Response to Generic Letter 96-04, Boraflex Dearadation in Spent Fuel Pool Storaae Racks This letter provides supplemental information in response to Generic Letter 96-04:
Boraflex Degradation in Spent Fuel Pool Storage Racks. Our original response to Generic Letter 96-04 was submitted to the NRC by letter dated October 23,1996.
Because of additional development work necessary to adapt the EPRI RACKLIFE computer program to the Prairie Island specific spent fuel pool conditions, we were unable to provide a full assessment of the physical condition of the Prairie Island Boraflex spent fuel racks in our October 23,1996 response.
The assessment of the Prairie Island spent fuel racks using the EPRI RACKLiFE program has provided sufficient information to allow us to complete our response to Generic Letter 96-04. An assessment of the physical condition of the Boraflex in the Prairie Island spent fuel racks is attached.
This letter contains no new NRC commitments. Please contact Gene Eckholt (612-388-1121) if you have any questions related to our response to Generic Letter 96-04.
I Joel P Sorensen I Plant Manager Prairie Island Nuclear Generating Plant 9704010528 970327 PDR P ADOCK 05000282 PDR gggg}\])l\lh
l I
l
', dSNRC- NORTHERN STATES POWER COMPANY March 27,1997 Page 2 j l
I c: Regional Administrator - Region Ill, NRC Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg Attachments: 1. Affidavit
- 2. Supplemental Response to Generic Letter 96-04
UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50-282 50-306 GENERIC LETTER 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks Northern States Power Company, a Minnesota corporation, with this letter is submitting information requested by NRC Generic Letter 96-04. i I
This letter contains no restricted or other defense information.
l i
NORTHERN STATES POWER COMPANY j BY h g Joel P Sorerfsed Plant Manager Prairie Island Nuclear Generating Plant On this of _ before me a notary public in and for said County, personally appeared Joel P Sorensen, Plant Manager, Prairie Island Nuclear Generating Plant; and being first duly swom acknowledged that he is authorized to execute this document on behalf of Northem States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief the statements madejin it are true and that it is not interposed for delay.
]
ff (l - -
l NOTARYPUBUC4NNNE90TA , ;
. HENNEPSICOUNTY ,
)l MyemEsphesJoe.St.sno ;- I ai:: : :::: ^:. ::::: ^ ^:::: ^:: ^ ^:::...!-
i
SUPPLEMENTAL RESPONSE TO GENERIC LETTER 96-04 Requested Action:
Provide an assessment of the physical condition of the Boraflex, including any deterioration, on the basis of current accumulated gamma exposure and possible water ingress to the Boraflex and state whether a subcritical margin of 5 percent ;
can be maintained for the racks in unborated water.
1 Response to the Reauested Action:
The Prairie Island Boraflex racks were put into use in late 1981 and were filled to near capacity by 1995. As a result, most of the individual spent fuel cells have a high accumulated gamma dose. A Boraflex coupon surveillance program was established when the racks were installed to monitor long term performance of the Boraflex material. At five year intervals, an irradiated Boraflex test coupon is removed from its location in the spent fuel pool and is sent for analysis of physical dimensions, hardness and B10 areal density. The last coupon was analyzed in 1994 and was found to not be significantly degraded, with the B10 areal density exceeding original specification.
Due to high levels of silica in the Prairie Island spent fuel pool miative to the ru T the industry, EPRI and the EPRI Boraflex Working Group shifted its focus from gap formation in Boraflex to the potential for Boraflex dissolution under long term exposure to spent fuel pool conditions. EPRI sponsored studies have shown that the combination of gamma exposure and water ingress into the Boraflex panel cavity significantly degrades the silica polymer matrix. The Prairie Island rack design allowed for a large amount of water ingress to alleviate the potential for cell wall bulging as a result of the Boraflex material offgassing. The Prairie Island sample coupons were not designed to allow for significant water ingress and are therefore not believed to be accurate indicators of rack Boraflex degradation.
The EPRI sponsored calculational model RACKLIFE has been used to estimate the condition of the Boraflex panels. The RACKLIFE model utilizes spent fuel pool chemistry parameters (including silica levels) and cell-by-cell exposure histories to estimate each Boraflex panel's potential for degradation. The published RACKLIFE model was unable to accurately simulate the rapid silica rise attributable to a few very high dose spent fuel cells so a slightly different curve fit was necessary to model the Prairie Island silica history. The Prairie Island-specific RACKLIFE model indicates that the Prairie Island spent fuel racks have a peak panel boron carbide loss of 100% (four panels), approximately 96% of the panels have <10% boron carbide loss and the average panel boron carbide loss is <2%. The high silica's are primarily due to the early applied dose to the spent fuel cells surrounding the Boraflex coupons resulting in long term exposure of high dose cells to the spent fuel pool water environment. The
information provided by the Prairie Island-specific RACKLIFE model, in combination l with information published in EPRI interim Report TR-103300, " Guidelines for Boraflex l Use in Spent-Fuel Storage Racks" (Dec 1993), indicates that <0.5% of the spent fuel pool cells are outside their design basis and outside the requirements of Prairie Island j Technical Specification 5.6.A.1.b, with a margin to criticality of less than 5% assuming l no soluble boron in the spent fuel pool water. Per the requirements of 10 CFR Part 50.72, Section 50.72(b)(1)(ii)(B), this condition was reported by phone to the NRC on November 26,1996.
1 In response to the Boraflex degradation identified by the EPRI RACKLIFE program, a i safety evaluation was performed to address the use of soluble boron in the spent fuel I pool to offset the degradation of the Boraflex in the racks. That evaluation determined that the use of credit for soluble boron is an unreviewed safety question. A License Amendment Request, which requests approval of a criticality analysis for the Prairie Island spent fuel storage racks with no crer1, .r Boraflex panels and instead utilizing j credit for soluble boron, was submitted on July 26,1995. This License Amendment i Request specifically addresses the unreviewed safety question related to the use of credit for soluble boron in spent fuel pool criticality analyses.
As part of the developmental work for the July 28,1995 License Amendment Request, l spent fuel pool criticality analyses were performed that showed that 1850 ppm boron maintained kon < 0.95 under accident conditions with no credit for Boraflex or checkerboarding. Analyses crediting soluble boron using the existing checkerboarding requirements have not been performed, but that checkerboarding would provide additional margin. Until review of the July 28,1995 License Amendment Request is completed, administrative controls have been implemented to ensure that the spent fuel pool soluble boron concentration is maintained at a level adequate to ensure K n for the spent fuel storage racks will remain less than 0.95. Those administrative controls conservatively require that the spent fuel pool boron concentration be maintained >
2000 ppm and that the spent fuel pool boron concentration will be confirmed weekip.
To ensure that adequate soluble boron is maintained in the spent fuel pool under all conditions, the following actions have been taken.
. Procedures that provide for normal and emergency makeup to the spent fuel pool have been revised to require boron sampling following makeup to verify acceptable boron levels remain. The relevant requirements of the revisions will be permanently incorporated into the procedures once the July 28,1995 License Amendment Request (revised February 21,1997) for soluble boron credit has been approved.
. Operator spent fuel pool checks have been increased in frequency from once per day to once per shift to potentially decrease the time an unplanned dilution can go undetected.
. Boric acid has been placed in the immediate vicinity of the spent fuel pool in the event manual addition is required.
s , . -
. Spent fuel pool dilution sources have been tagged out to eliminate their use l without adherence to the new administrative controls.
Finally, as part of the original Prairie Island response to Generic Letter 96-04 a fuel l management strategy has been established to ensure that fresh and other high ;
reactivity assemblies (based on a combination of burnup and initial enrichment) will '
only be placed in spent fuel pool cells that are projected to have little or no boron carbide loss. The determination of boron carbide loss is based on the RACKLIFE simulations.
f I
I l
I J