PY-CEI-NRR-2153, Forwards List of Details,Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3)

From kanterella
(Redirected from ML20140B933)
Jump to navigation Jump to search
Forwards List of Details,Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3)
ML20140B933
Person / Time
Site: Davis Besse, Perry  Cleveland Electric icon.png
Issue date: 03/25/1997
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2153, NUDOCS 9704010521
Download: ML20140B933 (2)


Text

-

y i

'~

. i i

. cswrsmo7  :

i ENERGY

, ,f

. 6670 Beta Drwe Mad Address- 216-604-9897 John P. Stetz MayheldVdlage,OH 44143 P. O. Box 5000 FAX: 216-604-9992 SenorVoce PresKlent Nuclear  !

Cleveland OH 44101 2000 Power Generaton 4

1 4

March 25, 1997 i PY-CEI/NRR-2153L (Perry)

Serial Number-2445 (Davis-Besse) l United States Nuclear Regulatory Commission  ;

Document Control Desk I Washington, D.C. 20555 Perry Nuclear Power Plant / Davis-Besse Nuclear Power Station Docket No. 50-440 (Perry Nuclear Power Plant) 3 Docket No. 50-346 (Davis-Besse Nuclear Power Station) i Property Insurance Coverage - 1997 Annual Notification l

Gentlemen: l Centerior Energy is the parent company for the Cleveland Electric Illuminating Company and Toledo Edison Company, operators of the Perry Nuclear Power Plant and Davis-Besse Nuclear Power Station, respectively. I Pursuant to the requirements of 10CFP50.54 (w) (3) concerning reporting of )

property insurance coverage, the attached list details the Company's I insurers, policy numbers, and coverage limits for the two power plants.

If you have questions or require additional information, please contact Mr. Henry L. Hegrat, Manager - Regulatory Affairs, at (216) 280-5606. ]

1 Very truly yours,  !

a HMC:s

\

Attachment ,l cc: NRC Project Manager NRC Resident Inspector Office NRC Region III NRR License Relations Analyst Utility Radiological Safety Board N

9704010521 970325 ADOCK 05000346 PDR J PDR 2

. .N.h.h

I s.

4 , ,

l Parrv Unitl l NucIcar Property Insurance Insurer Policy No. Amount ofInsurance American Nuclear Insurers (ANI) and 96195 $500,000,000 j Mutual Atomic Energy Liability l Underwriters (MAELU)

Nuclear Electric Insurance Limited X96-065 $2.250.000.000 (NEIL) l TOTAL S2,750,000,000 l

! l l Davis-Besse l l

Nuclear Property Insurance l

1 Insurer Poliev No. Amount ofInsurance l

Nuclear Mutual Limited (NML) P96-059 $500,000,000 l Nuclear Electric Insurance Limited X96-035 $800.000.000 (NEIL)

TOTAL S1,300,000,000 l

i e

1 4

e