Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20198B7851998-12-14014 December 1998 Notice of Violation from Insp on 981014-1130.Violation Noted:As of 981113,several Fire Brigade Personnel Not Listed as Qualified Fire Brigade Members Had Not Participated in Required Number of Fire Brigade Drills ML20217A6751998-03-18018 March 1998 Notice of Violation from Insp on 980113-0223.Violation Noted:Inspectors Identified That Shift Supervisor Failed to Remove hold-and-secure Card Attached to Control Room hand- Switch for Number 13 ML20216C1521998-03-0606 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: on 971028,licensee Did Not Make Surveys to Assure Compliance w/10CFR20.1201(a),which Limits Occupational Radiation Exposure IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures ML20199E5871997-11-13013 November 1997 Notice of Violation from Insp on 970830-1013.Violation Noted:From 960229-970410,northwest Corner of Established Vehicle Barrier Sys Not Adequate to Protect Against Use of Land Vehicle in That Barrier Not Continuous ML20149H9221997-07-17017 July 1997 Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly Released ML20141E7961997-06-18018 June 1997 Notice of Violation from Insp on 970412-0527.Violation Noted:Inspectors Identified That Operations Personnel Did Not Know That Number 13 ESW Pump Had Been Operating for 2 Days Following 970408 Loss of Power to Number 15 4160 Volt ML20137A1631997-03-11011 March 1997 Notice of Violation from Insp on 970109-0219.Violation Noted:Surveillance Test 0466-1 Not Conducted Under Suitable Environ Conditions ML20138N6931997-02-20020 February 1997 Notice of Violation from Insp on 961118-970108.Violation Noted:On 960814,during Closeout of Design Change Package RHR Sys Pressure Upgrade Mod, Rev 1,safety Evaluation Failed to Provide Bases for Determination ML20133C3971996-12-27027 December 1996 Notice of Violation from Insp on 960829-1016.Violation Noted:On 961011 & 12,plant Operator Documented Incorrect Standby Liquid Control Tank Level in Surveillance 0090, Standby Liquid Control Sys Checks ML20247N8541989-05-26026 May 1989 Notice of Violation from Insp on 890329-0512.Violation Noted:Procedure 7140, RCIC Sys Annual Instrument Maint Procedure Inadequately Prepared ML20207R6241987-03-12012 March 1987 Notice of Violation from Insp on 870123-0213 ML20215D4051986-12-11011 December 1986 Notice of Violation from Insp on 860528-0905.Violations Noted:During 841102-860611 Both Trains of Standby Liquid Control Sys Incapable of Providing Injection Flow & Actions Not Taken to Initiate Orderly Shutdown ML20138R3871985-12-27027 December 1985 Notice of Violation from Insp on 851223 ML20058F2641982-07-15015 July 1982 Notice of Violation from Insp on 820301-0430 ML20058D8731982-07-12012 July 1982 Notice of Violation from Insp on 820504 ML20056B5771978-05-25025 May 1978 Notice of Violation from Insp on 780411-14 & 27-28.Violation Noted:On 780202 Work Activities Authorized by Work Request Authorization 78-147 Extended Beyond Scope of Approved Work Request Authorization ML20058K4541978-03-14014 March 1978 Notice of Violation from Insp on 780221-24.Violation Noted: Before mid-Jan 1978,analysis of Each Containment Purge Had Not Included Noble Gas Principal Gamma Emitters IR 05000263/19760111977-09-13013 September 1977 Notice of Violation from Insp on 770823-26.Violation Noted: Violations of TSs Reported in Insp Repts 50-263/76-11,77-01, 77-05,77-06,77-07 & 77-10 Were Not Reviewed & Documented by Operations Committee ML20056B5691977-07-0606 July 1977 Notice of Violation from Insp on 770613-16.Violation Noted:Failure to Have Portable Dose Rate Survey Instruments Calibr Annually 1998-03-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000263/19990061999-10-21021 October 1999 Insp Rept 50-263/99-06 on 990813-0923.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000263/19990121999-10-13013 October 1999 Insp Rept 50-263/99-12 on 990913-17.No Violations Noted. Major Areas Inspected:Various Aspects of RP Program Including Radioactive Waste Processing,Storage,Packaging & Transportation & General RP Practices IR 05000263/19993011999-09-27027 September 1999 NRC Operator Licensing Exam Rept 50-263/99-301(including Completed & Graded Tests) for Tests Administered on 990823-26.Both Applicants Passed All Sections of Exam IR 05000263/19990051999-09-0101 September 1999 Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000263/19990041999-07-28028 July 1999 Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19990111999-07-14014 July 1999 Insp Rept 50-263/99-11 on 990621-24.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000263/19990021999-05-0303 May 1999 Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation.Major Areas Inpsected:Operations,Engineering,Maint & Plant Support IR 05000263/19990101999-04-0909 April 1999 Insp Rept 50-263/99-10 on 990308-12.No Violations Noted. Major Areas Inspected:Review of Training Administrative Procedures & Operating Exam Matls & Observation & Evaluation of Licensed Operators IR 05000263/19990011999-03-11011 March 1999 Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000263/19980181999-01-20020 January 1999 Insp Rept 50-263/98-18 on 981201-990111.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980191998-12-30030 December 1998 Insp Rept 50-263/98-19 on 981214-18.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensees Chemistry & Radiation Protection Programs,Specifically REMP, PASS & Chemistry QC & Matl Condition IR 05000263/19980161998-12-14014 December 1998 Insp Rept 50-263/98-16 on 981014-1130.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Performance of Emergency Preparedness Drill ML20198B7851998-12-14014 December 1998 Notice of Violation from Insp on 981014-1130.Violation Noted:As of 981113,several Fire Brigade Personnel Not Listed as Qualified Fire Brigade Members Had Not Participated in Required Number of Fire Brigade Drills IR 05000263/19980171998-11-24024 November 1998 Insp Rept 50-263/98-17 on 981026-30.No Violations Noted. Major Areas Inspected:Physical Security Program IR 05000263/19980151998-11-10010 November 1998 Insp Rept 50-263/98-15 on 980821-1014.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000263/19980121998-09-18018 September 1998 Insp Rept 50-263/98-12 on 980719-0831.No Violations Noted. Major Areas Inspected:Opertions,Maint,Engineering & Plant Support IR 05000263/19980131998-09-11011 September 1998 Insp Rept 50-263/98-13 on 980810-13.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants IR 05000263/19980141998-09-0404 September 1998 Insp Rept 50-263/98-14 on 980810-14.No Violations Noted. Major Areas Inspected:Licensee Liquid & Gaseous Effluents Program,Calibration & Testing of Area & Process Radiation Monitors & Free Release Program IR 05000263/19980991998-08-26026 August 1998 SALP Rept 50-263/98-99 for Monticello Nuclear Generating Plant,Covering Period from 960721-980718 IR 05000263/19980111998-08-21021 August 1998 Insp Rept 50-263/98-11 on 980528-0718.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980091998-07-30030 July 1998 Insp Rept 50-263/98-09 on 980511-0612.No Violations Noted. Major Areas Inspected:Review of 10CFR50.59 Safety Evaluation & Screening Activities IR 05000263/19980071998-06-25025 June 1998 Insp Rept 50-263/98-07 on 980413-0527.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000263/19980101998-05-26026 May 1998 Insp Rept 50-263/98-10 on 980427-30.No Violations Noted. Major Areas Inspected:Plant Support IR 05000263/19980061998-05-11011 May 1998 Insp Rept 50-263/98-06 on 980323-0423.No Violations Noted. Major Areas Inspected:Maint IR 05000263/19980041998-05-0808 May 1998 Insp Rept 50-263/98-04 on 980224-0414.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000263/19980081998-04-30030 April 1998 Insp Rept 50-263/98-08 on 980406-09.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Refueling & Maint Outage ML20247M5311998-04-13013 April 1998 EN-98-026:on 980420,informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose Civil Penalty to Northern States Power Co for Two Violations W/Rhr ML20216B2871998-04-0303 April 1998 Insp Rept 50-263/98-05 on 980309-13.Violations Noted.Major Areas Inspected:Physical Security Program ML20217A6881998-03-18018 March 1998 Insp Rept 50-263/98-02 on 980113-0223.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A6751998-03-18018 March 1998 Notice of Violation from Insp on 980113-0223.Violation Noted:Inspectors Identified That Shift Supervisor Failed to Remove hold-and-secure Card Attached to Control Room hand- Switch for Number 13 ML20216C1521998-03-0606 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: on 971028,licensee Did Not Make Surveys to Assure Compliance w/10CFR20.1201(a),which Limits Occupational Radiation Exposure ML20216C1671998-03-0606 March 1998 Insp Rept 50-263/98-03 on 980209-13.Violations Noted.Major Areas Inspected:Various Aspects of Licensee RP Program Including Radwaste Processing,Packaging,Transportation & Implementation of Recent Changes to NRC & DOT Regulations IR 05000263/19970181998-02-0404 February 1998 Insp Rept 50-263/97-18 on 971125-980112.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198G3171998-01-0606 January 1998 Page 6 of Plant Emergency Preparedness Exercise Insp Rept 50-263/97-16.Page Inadvertently Omitted W/Rept Transmitted by IR 05000263/19970161997-12-22022 December 1997 Insp Rept 50-263/97-16 on 971118-21.No Violations Noted. Major Areas Inspected:Evaluation of Performance During Plant Biennial Exercise of Emergency Plan by Regional EP Inspectors & Resident Inspector Staff from Plants ML20197B1731997-12-18018 December 1997 Insp Rept 50-263/97-15 on 971014-1124.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures IR 05000263/19970171997-12-15015 December 1997 Insp Rept 50-263/97-17 on 971118-21.No Violations Noted. Major Areas Inspected:General Radiation Protection Practices,Respiratory Protection Program & Radwaste Processing,Storage & Monitoring ML20199E5871997-11-13013 November 1997 Notice of Violation from Insp on 970830-1013.Violation Noted:From 960229-970410,northwest Corner of Established Vehicle Barrier Sys Not Adequate to Protect Against Use of Land Vehicle in That Barrier Not Continuous IR 05000263/19970141997-11-13013 November 1997 Insp Rept 50-263/97-14 on 970830-1013.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support.Rept Also Includes Insp follow-up of Security Related Issue by Regional Inspector IR 05000263/19970121997-09-18018 September 1997 Insp Rept 50-263/97-12 on 970708-0829.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19970111997-08-19019 August 1997 Insp Rept 50-263/97-11 on 970707-10.No Violations Noted. Major Areas Inspected:Installation of Emergency Core Cooling Sys Suction Strainers & pressure-suppression Chamber Coating Program IR 05000263/19970131997-08-14014 August 1997 Forwards Partially Withheld Insp Rept 50-263/97-13 on 970714-18 (Ref 10CFR73.21) IR 05000263/19970101997-07-23023 July 1997 Insp Rept 50-263/97-10 on 970623-27.No Violations Noted. Major Areas Inspected:Review of Issues Surrounding Licensee Discovery of Error in Head Loss Across ECCS Suction Strainers ML20149H9291997-07-17017 July 1997 Insp Rept 50-263/97-08 on 970528-0707.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H9221997-07-17017 July 1997 Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly Released IR 05000263/19970091997-07-15015 July 1997 Insp Rept 50-263/97-09 on 970616-20.No Violations Noted. Major Areas Inspected:Licensees Chemistry & Radiation Protection Programs ML20141E8031997-06-18018 June 1997 Insp Rept 50-263/97-06 on 970412-0527.Violation Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20141E7961997-06-18018 June 1997 Notice of Violation from Insp on 970412-0527.Violation Noted:Inspectors Identified That Operations Personnel Did Not Know That Number 13 ESW Pump Had Been Operating for 2 Days Following 970408 Loss of Power to Number 15 4160 Volt PNO-III-97-046, on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies1997-05-16016 May 1997 PNO-III-97-046:on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies 1999-09-27
[Table view] |
Text
o 4
NOTICE OF VIOLATION Northern States Power Company Docket No. 50-263 Monticello Station License No. DPR-22 During an NRC inspection conducted on November 18,1996, through January 8,1997, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600 (60 FR 34381; June 30,1995), the violations are listed below:
- 1. 10 CFR 50.59 (a)(1) stated,in part, that the holder of a license authorizing operation of a production facility may make changes in the facility as described in the safety analysis report without prior Commission approval unless the proposed change involves a change in the technical specifications incorporated in the license or an unreviewed safety question.
10 CFR 50.59 (b)(1) stated, in part, that the licensee shall maintain records of changes in the facility. These records must include a written safety evaluation which provides the bases for the determination that the change does not involve an enreviewed safety question.
Contrey to the above:
- a. On August 14,1996, during closeout of Design Change Package # 85M042, "RHR System Pressure Upgrade Modification," Revision 1, the safety evaluation failed to provide the bases for the determination that the physical :
plant changes, that were not returned to their original values following the modification's cancellation, did not involve an unreviewed safety question,
- b. On October 23,1996, Safety Review item 96-016, "1996 FOl identified USAR Changes," Revision 0, Addendum 4, failed to provide the bases for ;
the determination that each change identified in the safety review item did I not involve an unreviewed safety question. ]
This is a Severity Level IV violation (Supplement 1). l
- 11. 10 CFR Part 50, Appendix B, Criterion lil, " Design Control," states, in part, that measures shall provide for verifying or checking the adequacy of the design, and that changes shall be subject to design control measures commensurate with those applied to the original design.
l Contrary to the above:
- a. On March 14,1996, changes were made to General Electric Calculation, EqDE-34-0687, " Core Spray System Operational Capability Report," and these changes were not commensurate with those applied to the original design. Changes were " pencilled-in" on a copy of the calculation, the
" revised" calculation was not entered into the document control system, and a record of the " revised" calculation was not identifiable or retrievable within =
the quality assurance records system. l i
7703030118 970220 PDR ADOCK 05000263 G PDR
1 l
l l
i l
Notice of Violation 2 l
- b. On June 24,1996, calculation CA-96-090, " Evaluation of ECCS Net Positive Suction Head," Revision 0, was approved although the design verification l activities were not adequate. The calculation reached an incorrect '
conclusion as to the amount of available net positive suction head because l the vapor pressure value used in the calculation for water at 191'F was incorrect. )
- c. On December 6,1996, calculation CA-96-166, "Drywell Flooding Evaluation for Post DBA LOCA," Revision 0, was approved to resolve non-conservative and non-verified assumptions contained in calculation CA-93-056
" Suppression Pool Drawdown Calculation." The verification for the 1996 calculation was not adequate in that the calculation still contained non-verified, non-conservative assumptions.
- d. On May 19,1995, calculation CA-94-20, "RHR/RHR Service Water Heat Exchanger Performance," Revision 1, was approveo although the design verification activities were not adequate. The verification consisted of confirming that a computer could perform mathematical computations rather than verifying that the formulae input to the computer were accurate.
(
This is a Severity Level IV violation (Supplement 1).
Ill. 10 CFR Part 50, Appendix B, Criterion XI, " Test Control," states, in part, that a test program shall be established to assum testing is performed in accordance with i written test procedures which incorporate the requirements and acceptance limits I contained in design documents. Test results shall be documented and evaluated to assure test requirements have been satisfied.
Contrary to the above:
- a. On March 16,1995, surveillance procedure 1136, "RHR Heat Exchanger Efficiency Test" was revised such that the acceptance limits contained in design documents were no longer incorporated into the surveillance procedure. Specifically, the procedure was revised to incorporate a heat exchanger area not contained in any design document.
- b. On March 23,1995, surveillance procedure 1136, "RHR Heat Exchanger Efficiency Test," Revision 15, was signed by the shift engineer as complete j without the test results being evaluated to assure test requirements were j satisfied. The "HXPERF" computer program output sheets, showing that the l test results were acceptable and required by the procedure to be attached, ;
were dated October 22,1996, and were based on Revision 1 of the computer program rather than on Revision 0 as specified by the test i procedure.
This is a Severity Level IV violation (Supplement 1).
l
i Notice of Violation 3 Pursuant to the provisions of 10 CFR 2.201, Northern States Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region 111, and a copy to the NRC Resident inspector at the Monticello Nuclear Generating Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an order may be issued to
- show cause why the license should not be modified, suspended, or revoked, or why such i other action as may be proper should not be taken. Where good cause is shown, !
- consideration will be given to extending the response time. I Dated at Lisle, Illinois this 20th day of February 1997 1 <
i i