Forwards Rev 20 to Vol 5 of Pilgrim Nuclear Power Station FSAR, Due to Printing of Incorrect Page
ML20138M644
Person / Time
Site: Pilgrim
Issue date: 02/19/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138M645 List:
References
BECO-2.97.019, NUDOCS 9702250462
Download: ML20138M644 (1)


Text

_ _ _ . . . . _ _ _ _ _ __

6

. n.. g,- ,

. e- 10CFR50.71(e) '

9 Boeton Edison Pilgrern Nuclear Power Staton

Rocky Hdi Road Plymouth, Massachusetts 02360 E. T. Boulette, PhD Senior Vice President - Nuclear February 19, 1997 BECo Ltr. 2.97.019 U.S. Nuclear Regulatory Commission Attention
Document Control Desk Washington, DC 20555 i r

Docket No. 50-293 License No. DPR-35 i

Final Safety Analysis Report - Revision 20 l

t

- An incorrect page was used when Revision 19 of the Pilgrim Station Final Safety Analysis Report  :

was printed. We are issuing this revision to the FSAR at this time to correct this page and to  ;

l correct another minor error. This submittal has been designated Revision 20.

Enclosed is the List of Effective Pages for Volume 5 of the Pilgrim FSAR and new corrected  :

pages.

If you have any questions, please contact Marie Lenhart at 508-830-7937.

_ g

. T. Boulette l MTL\dmc\radmisc\FSAR20 ]

original and 10 copies i cc: Mr. Alan B. Wang, Project Manager Project Directorate I-1 Office Of Nuclear Reactor Regulation Mail Stop: 14B2 l 1 White Flint North

'11555 Rockville Pike  !

Rockville, MD 20852 fghj U.S. Nuclear Regulatory Commission Region I 475 Allendale Road -

King of Prussia, PA 19406

Senior Resident inspector l Pilgrim Nuclear Power Station 9702250462 970219 7 PDR K