ML20138M552

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-53 & 50-457/85-51 on 851102-30.No Violations Noted
ML20138M552
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/16/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20138M557 List:
References
NUDOCS 8512230025
Download: ML20138M552 (2)


See also: IR 05000456/1985053

Text

T1 % r5

1 . .

,

-

'DEC 1 6 $85-

Docket No. 50-456

Docket'No. 50-457

Commonwealth Edison-Company

ATTN: -Mr. Cordell Reed

Vice' President

Post Office Box-767

Chicago, IL 60690

' Gentlemen:

'

This-refers to the routine' safety inspection conducted by Messrs. T. M. Tongue,

M.' J. Farber, W. J. Kropp, and C. B Ramsey of this office during the period of

November 2 through November 30, 1985, of activities at the Braidwood Station,

Units-1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Mr. C. Schroeder and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews.with personnel.

No: violations of NRC requirements were identified during the course of this

. inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'

" ' M by ll.~S.'Little

W. S. Little, Director

Braidwood Project

Enclosure: Inspection Reports

No. 50-456/85053(DRP);

No. 50-457/85051(DRP)

'See Attacbed Distribution

.

8512230025 85121

4 PDR ADOCK 0500

G

E \ Mc}

'

', . .-

~

' Commonwealth Edison Company 2

DEC 1 6 085'

-Distribution

cc w/ enclosure:

D. L.'Farrar, Director

of Nuclear Licensing-

M.DWallace, Project Manager

~ D. Shan611n, Construction

Superintendent

.E. E. Fitzpatrick, Plant Manager

C.'W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB (RIDS)

. Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office Environmental

Control Division

'O. W. Cassel, Jr., Esq.

J. W.~McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division--

E. Chan, ELD <

'

J. Moore, ELD

G.. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB .

The Honorable A. Dixon Callihan,.ASLB

The Honorable Richard F.' Cole, ASLB

Fil te/1s

f:arber Li ule

h

(,ulhr

'

W I/

12/11/85 fpp g.

J P l$[

.