Forwards 1996 Annual Rept of Personnel Exposure & Summary of Special Maint Conducted
ML20138L605
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/19/1997
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-97-26, NUDOCS 9702240440
Download: ML20138L605 (4)


Text

.

VERMONT YANKEE NUGLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002

% ENGINE I OFFICE

$80 MAIN STREET BOLTON, M A D1740 (508)779 6711 February 19,1997 -

BVY 97-26 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a) Ucense No. DPR-28 (Docket No. 50-271)

Subject:

1996 Annual Report of Personnel Exposure As required by Vermont Yankee Technical Specification 6.7.A.2, enclosed please find our ,

annual report of personnel exposure. The enclosures consist of a report entitled " Reg. Guide 1.16 Man-Rem Final End of the Year Report for 1996" and a summary of any special maintenance conducted. This report covers the period beginning January 1,1996 and ending l December 31,1996.

Should you have any questions with regard to this information, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION dHw . $

James J. Duffy g400,'O Licensing engineer ,

c: USNRC Region I Administrator USNRC Resident inspector- VYNPS USNRC Project Manager - VYNPS f

9702240440 970219 A PDR ADOCK 05000271--

P. PDR

V3rmont Yankse Nuclair Power Ccrp.

. REG. GUIDE 1.16 MAN REM FINAL END OF THE YEAR REPORT FOR 1996 NUMBER OF PER$0NNEL DVER 100 MREM TOTAL MAN-REM

-STATION UTILITY CONTRACT WORKERS STATION UTILITY CON 1RACT WORKERS EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES AND OTHERS REACTOR OPERATIONS & SURVEILLANCE MAINTENANCE 21 0 102 5.229 0.000 34.631 OPERATIONS 25 0 1 7.978 0.000 0.304 HEALTH PHYSICS 11 0 18 3.711 0.000 4.660 SUPERVISORY 0 0 0 0.081 0.000 0.052 ENGINEERING 0 0 0 0.139 0.000 0.000 OTHER 1 0 0 0.218 0.000 0.047 SECURITY 0 0 0 0.000 0.000 0.000 ROUTINE MAINTENANCE' MAINTENANCE 21 1 371 8.586 0.101 114.502  ;

OPE 9ATIONS 16 0 0 5.539 0.000 0.001 HEALTH PHYSICS 4 0 27 1.463 0.000 9.676

$UPERVISORY 3 0 1 0.645 0.000 0.272 ENGINEERING 1 0 1 0.194 0.000 0.407 OTHER 1 0 0 0.415 0.000 0.000 SECURITY 0 0 0 0.000 0.000 0.000 i INSERVICE INSPECTION MAINTENANCE O 0 18 0.091 0.000 6.155 l OPERATIONS 0 0 0 0.038 0.000 0.000 HEALTH PHYSICS 0 0 0 0.112 0.000 0.166 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.003 0.000 0.000 OTHER 0 0 0 0.000 0.000 0.003 SECURITY 0 0 0 0.000 0.000 0.000 SPECIAL RAINTENANCE MAINTENANCE 0 0 53 0.019 0.000 22.340 OPERATIONS 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS 0 0 0 0.000 0.000 0.007

$UPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.000 0.000 0.000 OTHER 0 0 3 0.00'0 0.000 1.520 SECURITY 0 0 0 0.000 0.000 0.000

WASTE PROCESSING MAINTENANCE O O 0 0.068 0.000 0.428 OPERAil0NS 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS 0 0 0 0.053 0.000 0.042 SUPERVISORY 0 0 0 0.006 0.000 0.000 E
:GINEERING 0 0 0 0.000 0.000 0.000

'OTHER 0 0 0 0.000 0.000 0.000 SECURITY 0 0 0 0.000 0.000 0.000 RE FUELING MAINTENANCE O O O 0.293 0.000 0.498 OPERATIONS 0 0 0 0.1[7 0.000 0.001 HEALTH PHYSICS 0 0 0 0.002 0.000 0.008 SUPERVISORY 0 0 0 0.027 0.000 0.000 ENGINEERING 0 0 0 0.112 0.000 0.000 OTHER 0 0 0 0.000 0.000 0.000 SE CURITT 0 0 0 0.000 0.000 0.000

e TOTALS ,

MAINTENANCE 42 1 544 14.287 0.101 178.554 OPERATIONS 41 0 1 13.732 0.000 0.307 HEALTH PHYSICS 15 0 45 5.341 0.000 14.558

$UPERVISORY 3 0 1 0.759 0.000 0.324

[NGINEERING 1 0 1 0.447 0.000 0.407 OTHER 2 0 3 0.633 0.000 1.570 SECURITY 0 0 0 0.000 0.000 0.000 GRAND TOTAL 104 1 595 35.199 0.101 195.720 Approved by : - --- -- ------ - N -

Radiation Protection Manager Date l

l i

l l

I

Special Maintenance Work

Description:

Four special maintenance projects were performed at Vermont Yankee in 1996.

Project 1: Drywell Piping Over Pressurization: This was a design change which installed pressure relief and check valves around certain valves in the drywell.

Project 2: Feedwater Heater Replacement Project: This was a complete replacement of the two feedwater heaters located inside the condensers.

Project 3: Core Shroud Tie Rod Installation Project was a design change which installed four tie rod clamps on the core shroud to prevent the shroud from coming apart due to a circumferential crack.

Project 4: Appendix J Modifications Project: This project was a design change to address weaknesses in Vermont Yankee's implementation of the Appendix J program. This design change installed 3/4" connections to be used as vents, drains, or connections for leak rate testing.

i l

spemai/rrm