Provides 30-day Response to GL-97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Written Response Relative to Info Requested in GL Will Be Submitted by 970730
ML20138H516
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/30/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-01, GL-97-1, NPL-97-0215, NPL-97-215, NUDOCS 9705070207
Download: ML20138H516 (2)


Text

. .-

Wisconsin '

Electnc POWER COMPANY l

Point Beach Nuclear Plant (414) 755-2321 i 6610 Nuclear Rd., Two RNers, WI 54241 l

l 1

NPL 97-0215 i

April 30,1997 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 l Washington, DC 20555 l I

Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 GENERIC LETTER 97-01: DEGRADATION OF CONTROL ROD DRIVE MECHANISM NOZZLE AND OTHER VESSEL CLOSURE HEAD PENETR.ATIONS 30 - DAY RESPONSE POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 By letter dated April 1,1997, the Nuclear Regulatory Commission transmitted to licensees Generic Letter 97-01. The Generic Letter requested licensees to provide, within 120 days of the date of the letter, information related to the inspection of control rod drive mechanism nozzles and other vessel head penetrations. Specifically, the NRC staff requested data related to inspections performed to date as well as the schedule for future inspections. In addition, information related to resin incursions, if any, into the Reactor Coolant System was requested.

As noted in the Generic Letter, an inspection of the Point Beach Nuclear Plant Unit I vessel head penetrations was conducted in 1994. All of the penetrations were inspected to the extent possible. No indications were detected. A discussion of the inspection performed and the results achieved is documented in an NRC trip report from Mr. Chuck Hsu to Mr. Jack E. Rosenthal dated April 26,1994.

I I

0"i0054 1

g6,o 9705070207 970430 PDR ADOCK 05000266 P PDR Asubsho ofHisankDwmTwpondon

_ . _ _ . . _ _ _ . . . .m. . . - _ _ _ _ . _ . _ _ _ . _

I i

d - ' NPL 97-0215 i

. Apri,130,1997 j i'

PQ,e'2 ,

f i 1

j l I

I Wisconsin Electric Power Company will submit a written response to the NRC by July 30,1997 relative

]

to the information requested in the Generic Letter.  ;

i If you have any questions or desire additional information, please contact us.

Sincerely, m v- Q Q f_ ,

?_ _ _

Douglas F. Johnson Manager Regulatory Services and Licensing cc: NRC Regional Administrator NRC Resident Inspector Subscribed to and sworn before me this 3e day of A yr.', \ ,1997

)