ML20138G444

From kanterella
Jump to navigation Jump to search
Responds to Electronic Messages Sent to NRC Requesting That SONGS Units Be Shutdown & Sf Removed Immediately.Staff Temporarily Suspended Review of Petition Until Time Info Wished to Be Considered in Staff Final Decision Provided
ML20138G444
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/01/1997
From: Bateman W
NRC (Affiliation Not Assigned)
To: Dwyer S
AFFILIATION NOT ASSIGNED
Shared Package
ML20138G450 List:
References
2.206, NUDOCS 9705060299
Download: ML20138G444 (2)


Text

. - _ _ - - - -.

4v.macu ,

g & UNITED STATES g

j NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. 2006H001 D. . . . . ,o! May 1, 1997 l

l Mr. Stephen Dwyer c/o Robert Sanregret, Esq.

17621 Irvine Blvd. #100 Tustin, CA 92780

Dear Mr. Dwyer:

I am replying to the electronic messages you have sent to the U.S. Nuclear Regulatory Comission (NRC) since my last letter to you dated March 14, 1997.

Specifically, you sent two messages to Mel Fields of my staff dated March 19 l and 24, 1997, and two messages to NRC Chairman Jackson, both dated March 26, 1997. In accordance with the public process for treating 2.206 petitions, these electronic messages have been placed on the public docket. A pamphlet -

describing the 2.206 process was included in our February 6,1997, letter to l you. In your electronic messages, you reiterated your request that the San J

Onofre Nuclear Generating Station (SONGS) units be shutdown and the spent fuel '

removed immediately, and you also provide reasons as to why you believe the  :

seismic design of the SONGS units is inadequate. For the reasons stated in l Mr. Miraglia's November 22, 1996, letter to you, your September 22, 1996,

request for immediate action was denied. In Mr. Miraglia's February 6, 1997, letter, you were informed that the staff had temporarily suspended its review of your petition until such time as you had provided the information you j wished to be considered in the staff's final decision regarding your petition.

As noted in Mr. Miraglia's November 22, 1996, letter, the staff performed an extensive review of the design of the SONGS units during the operating license review stage, including its ability to withstand the effects of natural phenomena such as earthquakes. In addition, the staff requested the licenses in a letter dated February 3,1997, to provide information related to recent geological or geophysical investigatiou performed in the SONGS region, and information related to recent assessments of the ground motion at the SONGS site. The licensee responded to the staff's request in 7. letter dated March 14, 1997.

The staff has determined that sufficient information now exists to perform a review of your petition related to the seismic adequacy of the SONGS units.

The staff has renewed its review of your 2.200 petition request and will take into account the information provided in your electronic messages mentioned above.

h ,

$G M d o\ ,

9705060299 970501 PDR ADOCK 05000206 H PDR

i i Mr. Stephen Dwyer May 1, 1997 ,

h

'If you have any additional information you wish the staff to consider in its evaluation of your 2.206 petition, please provide all relevant material to the NRC by May 30, 1997. Please contact me if you need more time to provide additional information you wish considered in regard to your petition. I can l be reached by phone at (301) 415-1372 or by mail at the NRC address.

Sincerely, Original Signed By William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Ntclear Reactor Regulation DISTRIBUTLON:

Docket 1 Fin e ,(w/ incomings) WBateman PUBLIC"(is/ incomings) MFields (w/ incomings)

PDIV-2 Reading EPeyton-EDO Reading JKennedy l JCallan N01 son HThompson THarris i JBlaha NRR Mail Room (GT-96778)

PNorry OPA l EJordan OCA SBurns, 0GC SECY (CRC 97-0273 and CRC 97-0274)

KCyr, 0GC JDyer, Region IV  ;

KPerkins,-Region IV/WCF0 -

l SCollins/FMiraglia AThadani >

RZimmerman TTMartin WTravers JRoe EAdensam DOCUMENT NAME: DWYER.APR *See Previous Concurrence ,

0FC PDIV-?,/PM - PDIV-2/LA OGC* DRPW-DN N YN NAME M b s:ye ENN McGurren' JWRoe ipy, RZimmerYan DATE 4/13 /97 4/58/97 4/22/97 4/1k97 442p/97eY[a e OFC PDIV-2/D z NAME WBate M h DATE [/ / /97 0FFICIAL RECORD COPY i