Forwards Safety Insp Repts 50-456/86-09 & 50-457/86-08 on 850912-860224.No Violation Noted
ML20137Z408
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/07/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137Z414 List:
References
NUDOCS 8603130034
Download: ML20137Z408 (2)


See also: IR 05000456/1986009

Text

,

.

MAR 7 1986

Docket No. 50-456

Docket No. 50-457 l

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

i Vice President

Post Office Box 767

,

Chicago, IL 60690

Gentlemen:

This refers to the. routine safety inspection conducted by Messrs.

,

J. W. Muffett and J. M. Jacobson of this office on September 12, 26,

October 29, November 19-21, December 19, 1985 and February 18, 24, 1986,

. of activities at Braidwood Station, Units 1 and 2 authorized by NRC

Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion

of our findings with Mr. D. Shamblin at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

  • the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations and

interviews with personnel.

~

No violations of NRC requirecents were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

! We will gladly discuss any questions you have.concerning this inspection.

.

'

Sincerely,

9

,;.  ; t...

, *. ' . ~.. a

'

8603130034 860307

PDR J. J. Harrison, Chief

0 ADOCM 050C0456

PDR Engineering Branch

Enclosure: Inspection Reports

No. 50-456/86009(DRS);-

No. 50-457/86008(DRS)

See Attached Distribution

RIII J RI RIII RIII RIII

4 -

ddAA ]

Li /bls rrison d son Muffett h/M'sp&

acob n

_

bh Eb hhl% 3l4

,/< .2*E 0/

E 1

...

'

i

l

l

Commonwealth Edison Company 2 ~ MAR 7- 1985 l

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station ,

'

Superintendent

P. L. Barnes, Regulatory i

Assurance Supervisor i

DCS/RS8 (RIDS)

Licensing Fee Management Branch j

Resident Inspector, RIII

Braidwood~ .

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental i

Control Division

'

D. W. Cassel, Jr., Esq.

'J. W. McCaffrey,. Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance j

Division 1

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD l

'

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

l

i

. I