ML20137X250

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/85-40 & 50-457/85-39 on 850819-1024.No Violations Noted
ML20137X250
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/22/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137X254 List:
References
NUDOCS 8512100458
Download: ML20137X250 (2)


See also: IR 05000456/1985040

Text

,

"

NOV 221985

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

' Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. Jacobson

and J. Muffett of this office on August 19, 22, September 17-19, and

October 3-4, 16-18, 24, 1985, of activities at Braidwood Station, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133

and to the discussion of our findings with Mr. C. Schroeder and others at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

c,,,7,;;1 0:7.:d by'U. J. Ihrkm

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-456/85040(DRS);

No. 50-457/85039(DRS)

See Attached Distribution

!

e512100450$h00 56

PDR ADOCK PDR

i: G

L _

V64/

, _ _ _ __ _ _ .--_ - - - - . - - - _ .---- ___ _ _ . - - - - - - - - _ - - - _ _ - - - - - - _ - - - _ - _ - - - - - - - _ _ _ - _ - - - - - - - -

.

-,

Commonwealth Edison Company 2

NOV 2 21985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

I

'RIII RIII RIII R II RIII

ob?W

acobs)on/jlk d$$

Muffett

W

DanieYson

dk

rrison Li t e

11/21/85 y l7 T.