ML20137T333

From kanterella
Jump to navigation Jump to search
Forwards Copy of BVPS Unit 2 Cycle 7 Startup Test Rept Provided IAW TS 6.9.1.3 Item (2) Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 7 Reload Core Design
ML20137T333
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 04/09/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137T338 List:
References
NUDOCS 9704160073
Download: ML20137T333 (1)


Text

. - - - - _ .

s p 9

v Valley Power Station

, Shippingport, PA 15077 0004 j

l SUSHIL C.JAIN DMalon Vice President (412) 393-5512 i Fax (412) 643-8069 l

$*c'i7, SPo DMalon April 9, 1997 l

l l

U. S. Nuclear Regulatory Commission j Attention: Document Control Desk Washington, DC 20555-0001 l

l

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 ,

Cycle 7 Startup Test Report l Enclosed is a copy of the Beaver Valley Power Station Unit 2 Cycle 7 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle  !

7 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria.

l Sincerely, Sushil C. Jain c: Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager f

/ 2 5eauI < l 13o110 DEllVERING.

l j

9704160073 970409 0UAllTY .

PDR ADOCK 05000412 i P PDR -

ENER6Y i

\

41lIlmpl.nlpt.utisp l 1

-