ML20137S436

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S436
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8602180049
Download: ML20137S436 (2)


Text

I ~

'c ;

)_ Frn 11733 Docket No. 50-440 .

Docket No. 50-441 , ,

The Cleveland Electric Illuminating Company

  • ATTN: Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised fonn requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please note that the training section will no longer be cumulative. Other changes are detailed in Enclosure 2. Enclosure 3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

OMGINAL SIGNED BY WIS A. REYES O

PDRgo04'y 40 W 36g0 PDR Luis A..Reyes, Chief Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RII Ro len eye 02/11/86 hy f MW

'( : s The Cleveland Electric-Illuminating 2 FEB 11 pg Company DWgfg ut %"

cc' w/ enclosures: .

1 R. Tadych, Training Department -

cc w/o enclosures:

J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager,"-Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and -

Fuel Management Section

' DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert H. Quillin,' Ohio Department of Health l

I

. . - . . . -. . _ _ . . - _ . - - -