Requests That Commitment to Replace Trip Springs for Trip & Throttle Valve Be Reinstated or Appropriate Justification for Deletion of Commitment Be Provided by 851130.Rept on Plan 1D Should Be Revised
ML20137R024
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/15/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Williams J
TOLEDO EDISON CO.
References
NUDOCS 8512050410
Download: ML20137R024 (2)


Text

4-November 15, 1985

. c m' Docket No. 50-346 JRidgely d, DISTRIBUTION Docket File." ACRS-10

~NRC~POR " - " Ringram L PDR ADeAgazio Mr. Joe Williams, Jr. ORB #4 Rdg GDick Senior Vice President, Nuclear HThompson EBrach Toledo. Edison Company OELD H0rnstein Edison Plaza - Stop 712  ;, EJordan WPaulson 300 Madison Avenue 4 BGrimes GEdison Toledo, Ohio 43652 JPartlow OParr

Dear Mr. Williams:

SUBJECT:

DAVIS BESSE ROOT CAUSE FINDING REPORT PLAN 1D On October 30, 1985 we provided Toledo Edison Company with our evaluation of your report related to AFPT overspeed trip throttle valve problems, Plan 10.

The revision of the report which we reviewed indicated that it was Toledo Edison Company's intent to replace the trip spring for the trip and throttle valve on both AFPTs prior to restart of Davis Besse. This recommendation had previously been provided to you in a. letter from Terry Turbine on February 3,

>1984.

In Revision 3 to Plan 10, submitted on October 31, 1985 (Serial No. 1202),

this commitment has been deleted. It is our position that these springs i should be replaced as per manufacturer's recommendations prior to restart; otherwise an acceptable justification should be provided. The report on Plan ID should be revised to reflect restoration of the comitment or the requested justification for our review. Please provide your revision no later than November 30, 1985.

Sincerely, ao.nonuLs:G:Ca x J0GJ 2. E1\r.J "

' . John F. Stolz, Chief Operating Reactors Branch #4 ,

Division of Licensing cc: See next page l

~

l t

ORB #4:D ORB #4:DL[M,,'"

ADeAgaz 0;cr JStolz U ,

11/g85 11/ 85 l t

4, 8512050410 851115 '

PDR ADOCK 05000346 P PDR L

n _,

l

. ~ '

Mr. J. Williams ., Davis-Besse Nuclear, Power Station Toledo Edison Company _

Unit No. 1

. cc:

Donald H. Hauser, Esq. Ohio Department' of Health The Cleveland Electric ATTN: Radiological Health Illuminating Company Program Director P. O. Box 5000 P. O. Box 118 Cleveland, Ohio 44101 Columbus, Ohio 43216 Mr. Robert F. Peters Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General Edison Plaza 30 East Broad Street

300 Madison Avenue . Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris, Director Gerald Charnoff, Esq. Division of Power Generation Shaw, Pittman, Potts Ohio Department of Industrial Relations and Trowbridge 2323 West 5th Avenue 1800 M Street, N.W. P. O. Box 825 Washington, D.C. 20036 Columbus, Ohio 43216 '

Paul M. Smart, Esq. Mr. Harold Kohn, Staff Scientist Fuller & Henry Power Siting Commission 300 Madison Avenue 361 East Broad Street P. O. Box 2088 Columbus, Ohio 43216 Toledo, Ofito 43603 Mr. Robert B. Borsum President, Board of Babcock & Wilcox Ottawa County Nuclear Power Generation Port Clinton, Ohio 43452 Division

, Suite 200, 7910 Woodmont Avenus Bethesda, Maryland 20814

! Resident Inspector U.S. Nuclear Regulatory Commission 5503 N. State Route 2 Oak Harbor, Ohio 43449 l

l Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

l l

(

4. .

.. . . . _ _ _,_ _ _____. _,,_ .____._ _ . _. _ __. . . _ . . . _ . . _ _