ML20137J356

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/85-36 on 851201-31.No Violations or Deviations Noted
ML20137J356
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/15/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Walker R
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20137J359 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8601220409
Download: ML20137J356 (2)


See also: IR 05000267/1985036

Text

.-. . . . - .-

.

.t

JAN 151986

In-Reply Refer To:

Docket: 50-267/85-36

Public Service Company of Colorado

ATTN: R. F. Walker, President

P. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Farrell of this office

.during the period December 1-31, 1985, of activities authorized by NRC Operating

. License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the

discussion of our findings with Messers. J. Gahm and R.Craun at the conclusion

of-the inspection.

'

~

' Areas examined during the inspection included operational safety verification,

-licensee. action on previously identified inspection items, NUREG-0737 ,

requirements (Three tiile Island Action Items), engineered safety feature

v l' systems, and new fuel inspection. Within these areas, the inspection consisted ,

of selective examination of procedures and representative records, interviews

,with personnel, and. observations by the inspector. These findings are

documented in the enclosed report.

-

Within the scope of the inspection, no violations or deviations were

, identified.

'

. We have examined actions you have taken with regard to a previously identified

inspection ~ finding. The status of this item is identified in paragraph 3 of

the enclosed report.

-,

Should you have any questions concerning this inspection, we will be pleased to ,

discuss them with you.

Sincerely,

Orldnd SI:ned By

J. E. Gagliardo

'

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-267/85-36

cc w/ enclosure: (see next page)

. I

RIV: SRI $/f[

.(.eREFarrell/ls

RPB/A #f/

JPJaudon

RPB / /

JEGagl iardo

/ //r/86 / //f/86 //,fjed

y

e60122o4o, 86o11s-

gDR ADOCK 0 % g7 {f.

c

. - - - .

., - .. . -- - - -. -- _-_ - - . __ _ . - .

.

<

.: .

-

'

. .

'

,

i' , ,

. . c . ,, , ,

x ,- f u ~* *

'

s

Publicl Service Company of Colorado -2-

.

- -

.,

3 , ,

. p: , .

^

. <

'

J. W. Gahm. . Manager, , Nuclear

.

, . Production Division ,

Fort-St. Vrain Nuclear Station .

'16805 WCR 191/2

,

,

Platteville, Colorado 80651

L. Singleton,: Manager, Quality

- '

Assurance Division '

7 (Same Address) ,

it

Co'lorado Radiation Control Program Director

bec distrib. by RIV:

'

  • RPB R. D. Martin, RA
  • Resident Inspector DRSP
  • SectionChief(RPB/A) . *RIV File

.

  • Section Chief.(RSB/ES)- *R&SPB
  • RSTS OPERATOR' * MIS System
*RSB

.i

I

7

2

i

$

1

4

- >

,

,

'

. ,

i_

.

.

,e

. ,

s H g +

'

b 1

,y_,

-

.

.. ... . - - - , . - . - . - - _ - - - - - - - . . - - - -

. , -