ML20137H481

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-456/85-49 on 851002-1115.No Violation Noted
ML20137H481
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 11/26/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137H485 List:
References
NUDOCS 8512020403
Download: ML20137H481 (2)


See also: IR 05000456/1985049

Text

. _ _ _ . . _ . - _ _ . _ . _ . ._._._ -

_ .. _ _ _ _ _ -

. _ _.

.

.

. .

i

NOV 2 61985

.

i

Docket No. 50-456

i

Commonwealth Edison Company

ATTN: Mr. Cordell Reed {

r

Vice President

Post Office Box 767 i

Chicago, IL 60690  !

'

i

Gentlemen
.  !

l  !

This refers to the routine safety inspection conducted by Messrs. D. L. Williams  !

l

and A. Dunlop, Jr. , of this office on October 2 through November 15, 1985, of r

3 activities at Braidwood Nuclear Power Station authorized by NRC Construction  !

l Permit No. CPPR-132 and to the discussion of our findings with Mr. C. J. Tomashek ,

i at the conclusion of the inspection,  !

1

'

The enclosed copy of our inspection re) ort identifies areas examined during i

the inspection. Within these areas, t1e inspection consisted of a selective  :'

examination of procedures and representative records, observations, and

) interviews with personnel. I

No violations of NRC requirements were identified during the course of this f

inspection.  !

i

, In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,  !

i Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

l will be placed in the NRC Public Document Room.

,

j We will gladly discuss any questions you have concerning this inspection.  !

I

j Sincerely,

J Original signed by Mark A. Ring (for)

l

!

i

! J. J. Harrison, Chief >

l Engineering Branch i

} Enclosure: Inspection Report {

j No. 50-456/85049(DRS) j

See Attached Distribution l

!  !

! l

1  !

!  !

!

$$ASSoESSSh6

0 t

,

f

\\

I

v'd /

.

.

Commonwealth Edison Company 2 NOV 2 61985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

'

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

I

A II D RIII JII{ R fly RIII

Jk a. V Jik d y m Harr

o*(ison*fy

,

Williams /kja Dunlop Ring Par nr

11/25/85