ML20137F638

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-456/85-28 & 50-457/85-28 on 850521-0814.No Violations Noted
ML20137F638
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/23/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137F643 List:
References
NUDOCS 8508270034
Download: ML20137F638 (2)


See also: IR 05000456/1985028

Text

. .- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _. ..

AUG 231985

-

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

l

l This refers to the routine safety inspection conducted by Messrs. R. Mendez

'

and Z. Falevits of this office on May 21 through August 14, 1985, of activities

at Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-132 and No. CPPR-133, and to the discussion of our findings

with C. W. Schroeder and others of your staff at the conclusion of the

inspection.

i The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

1;'.a1 C*:r.cd by J. J.' Unr h0r.

J. J. Harrison, Chief

Engineering Branch

,

Enclosure: Inspection Report

No. 50-456/85028(DRS);

No. 50-457/85028(DRS)

See Attached List For Distribution

B270034 9599y3 \

g ADOCK 05000456 , I

PDR

_ _ - _ _ - - - _ - _ _ _ _ _

Jt$ o\ /

E ,

.

Commonwealth Edison Company 2 AUG 231985

1

Distribution l

1

CC W/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

l

Superintendent

J. F._Gudac, P1 ant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

RIII RIII- RI I RIII RI RII RI

h

.

Dr\

Mendez/kja

f

Falevits

bSA

Willaams M

Love hMuffett- Little

Harrisgn 1

08/21/85 4r0 E/"' [9g

0

6.1

I