Submits Suppl License Amend Request,Per Discussions W/Nrc Staff.Suppl Proposes to Revise License Conditions 1 & 2 as Submitted
ML20137D760
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/19/1997
From: Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703260298
Download: ML20137D760 (3)


Text

. .-

. Northern states Power Company 1717 Wakonade Dr. E.

Welch, MN 55089 Telephone 612-388-1121 I

March 19,1997 l

10 CFR Pad 50 l Section 50.90 l U S Nuclear Regulatory Commission  !

Attn: Document Control Desk Washington, DC 20555  !

1 l

I

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Supplement 6 to License Amendment Request Dated January 29,1997 Amendment of Coolina Water System Emeraency Intake Desian Bases b

This letter is submitted to supplement the subject license amendment request pursuant to discussions with the NRC Staff. Supplement 5 proposed license conditions which would provide the basis for issuance of the subject license )

amendment. This supplement proposes to revise License Conditions 1 and 2 as  ;

follows: l License Condition 1) NSP will provide a licensed operator in the control room on an interim basis for the dedicated purpose of identifying an earthquake which results in a decreasing safeguards cooling water bay level. This operator will be in addition to the normal NSP administrative control room i staffing requirements and will be provided until License Condition 2 is satisfied.

License Condition 2): NSP will submit dynamic finite element analyses of the

intake canal banks by July 1,1997 for NRC review. By December 31,1998, NSP will complete, as required, additional analyses or physical modifications which provide the basis for extending the time for operator post-seismic cooling water load management and eliminating the dedicated operator [

specified in License Condition 1. [

License Condition 3 remains as proposed in Supplement 5. 00 L 1

9703260298 970319 PDR ADOCK 0S000282 p PDR 3 U U v

I!!sspapagls.sg

1

. USNRC ,

3/19/97 Paga 2 of 2 The dedicated operator specified in License Condition 1 will be an additional operator assigned to the control room each shift. This additional operator will participate in control room duties which can be immediately terminated and do not prevent identifying an earthquake which results in a decreasing safeguards cooling water bay level. This operator may perform such duties as: review work packages; prepare isolations for work packages; review surveillance procedures for a reformatting project; conduct biennial review of operating procedures; assist the Shift Manager in reviewing alarm printouts and daily log printouts; and participate in control room discussions of plant operating issues.

NSP wishes to withdraw the probabilistic evaluation, Safety Evaluation, Section lil, i and the specific numeric probability given in the Safety Evaluation Conclusions presented in Supplement 5.

A revised Safety Evaluation, Significant Hazards Determination and Environmental Assessment have not been submitted since these evaluations, as presented in the original submittal and previous supplements, continue to bound the proposed license amendment as supplemented by this letter.

If you have any questions related to this supplement to the subject license amendment request, please contact myself or Dale Vincent at 612-388-6758.

i Joel P. Sorensen Plant Manager, Prairie Island Nuclear Generating Plant c: Regional Administrator-lil, NRC NRR Project Manager, NRC Senior Resident inspector, NRC State of Minnesota Attn: Kris Sanda J E Silberg '

4 l

. o 5 .  !

UNITED STATES NUCLEAR REGULATORY COMMISSION I

NORTHERN STATES POWER COMPANY j PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET Nos. 50-282 50-306 REQUEST FOR AMENDMENTTO l OPERATING LICENSES DPR-42 & DPR-60

[ LICENSE AMENDMENT REQUEST DATED January 29,1997 Amendment of Coolina Water System Emeraency Intake Desian Bases l

i Northem States Power Company, a Minnesota corporation, by this letter dated

March 19,1997, provides supplementalinformation in support of the subject license amendment request dated January 29,1997. This letter revises two of the three

! previously proposed license conditions and withdraws the probab!!!stic evaluation l 3 presented in Supplement 5.

4 This letter and its attachments contain no restricted or other defense information.

l NORTHERN STATES P ER COMPANY By n Joef. Sorensen 1

Plant Manager, I Prairie Island Nuclear Generating Plant On this day of dk kN before me a notary public in and for said County, personally appeared, Joel P. Sorensen, Plant Manager, Prairie Island Nuclear Generating Plant, and being first duly swom  ;

, acknowledged that he is authorized to execute this document on behalf of Northem States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belie the statements made in it are true and that it is not interposed for delay.

W c

)

MARCIA K. lac 0fE  ; l NOTARYPUOUCMNNESOTA i !'

HENNEPN COUNTY mycaudahnEspbssJan.31,ame: i e :::: ::::: :::::::: : ::::::::::: .