MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
See also: IR 05000424/1985035
Text
. .
.
.
TAastt se
. .
CALCULATIONS REVIEWED .
(SNCET 3 or 3)
NRC
w RRT Revlaw f.ind i ne s/Cgement a .
masater TItie anaertodSD
Adequato dIspostion of Yes Setisfactory movement
, 153-1217-182-01 Stress CaIculation Finding as-M. is insigniflcent at
- M4CS*7024 1ocation in questlon.
See M-FCR8-8786
(Table 6.2-5)
?
i M
! 1. ART checklist referenced is Figure 6.1-1 as socluded in the GPC Module 4 Report.
,
1
I
f
't
,
e
4
e .g
.
!
,
.
.
8601150594 860107 ^"'
hDR ADOCK 05000424
'
PDR
t
,
s
y/
_
_ _ _ _ _ . - . _ _ __. .. . _
- _ - _ . o
. . _ _ - - _ _ _ _ - . . _ _ _ - . .
.
.*
l'
LAeLL.3 *
,
..
DRAWIIIOS AIID DRAWIIIG CHANCF NOTICES (DCII) REVIEWED
'
( SHEET 1 OF 4)
I
i
MRC
i IIueber Royleygd e RItT Review F ind inas/ Cements
faev. - maten Title /Demarlatten
(SEE NOT I
1
Yes Checklist used by RRT
Assessed RRT checklist
,
l
RNA Auxillary Sulldlag somber resulted in cu?sery
'
Fenrication lesestric Areas 3E and 3C, Level D (Fig, 6.1-7) and check- review. Also, NRC
- 1K3-1705-003-01 list performance by performance er a checklist
'
(Rev. 24, 2/18/04) reviewing drawing and leftT
entries for checklist ites the RRY considered
not applicable resulted
! Items with RRT eseber in identification of ISO
4
who performed original
j review. nonconformance with the
,
DC. (See text)
Asseased RRT checkIIst Yea CheckIIet and IlltT under=
! DOI-A ale. 8 (11/21/84) ( Fig. 6.1-3 ) and check. standing and application
i Ilss performance by of i t appea red sa ti s-
! reviewing drawing and factory,
! RRT entries for checklist
!
'
Items with RAT eseber who
performed original
review,
Asseesad RRT checkIiet Yes CheckIiet and IlliT under-
i SCn-R Ile. 11 (10/22/84) IFig. 6.1-3) and check. stendf ry; appeared satis-
) list performance by factory for this DCII.
i reviewing drawing and However, the first and
-
RRT entries for checklist possibly aest significent
checklist ites entry was
l atoes with RAT emeter who en incorrect verification
i performed original
'
review. that the DCII was in
compilence with DC-2702.
- - See text.
I
(
Yea CheckIist used by RR7
RNR Systom, Systes4 No. 1205 Asseased RRT checkiIet eseber resulted in cursery
l pm13 1R403122 1 (Fig. 6.1-2) and check-
i (Rev. 13, 1/22/95) l i s t pe rFormance by review. See text.
t reviewing drawing and
- RAT entries for check-
j
'
IIst items with RRT
eseber who perfareed
original review.
Proper incorporation Ilo IIRC review found that the
( BCII IIos. I threeggh 32 of previous DCNs in DCel changes appeared to
have been satisfacterfly
drowing Rev. 13. See
4 other revjew for handled.
Individual DCII 20
beIow.
!
h
, ,
e .
.
.
.TABL U
DRAWIIIGS Afl0 DRAWIIOC CHAleCE 100TICES (DCN) REVIEWED
(SHEET 2 0F 84) ,
.
MRC Flpdines/Cemeents
seueber
Ti t;1eResc riet ion Reviewed r e RftT Review
(Rev. - Detel ISEE NOT 4
Yes Setisfactory. NT revlear
Assessed RRT checkIlst appeared theroesg'- and
DCas Iso. 20 (Fig. 6.1-3) and check- userus. checksisto ror
test perroreenee by DCNs 9, 16, 19, 69d 22
reviewing drawing and were revleved and entries
RRT entries for checklist Indicated they were else
items with RRT esetper
who performed original thereugh reviews.
reviews. Also, checked
(but did not review for
occursey) that check-
lists for DCMS 9, 164
19, and 27 appes red
satisractority perfereed
by RRT.
Basic design conditions No Setlefactory
FerID IM408122 RHR Systee, System 800. 1205
from LDL.
( flev. 13) Checklist end tender- ,
Assessed RRT checklist Yes
SC2-S to vender Dwg. RMR system laelstion f rig. 6.1-3 ) and check- standing of its use
1N4AN04-23-12 volve encapsulation vessel
list performance by appeared settsfactory for
reviewing drawing and this DCN. This was a
RRT entries ror check- very slaple (DCN) change
end not likely to have
list Items with RAT resulted in error. This
member who performed was the only DCII-S
, o rig i na l review.
reviewed by RRT.
Basic design conditlens Yes Settsfactory
Fabricetlen Iseestric RNR Auw. Bldg., Area 3E,
Levet D from LDL
1:;3-1205-004-01 (Rev. 17)
Settsfactory
+3 RRT checkt ist itees No
Satisfactory
DCE #1 - RRT checklist itses leo
No Settsfactory
DCal #2 RRT checklist stoma setterectory
DCat #3 RRT checklist itees Ito
Setisrectory
DCae-R #es RRT checkfist itses 80 o
Setlerectory
DC80-R #5 RAT checktist itses No
peo Se t t sfactory
DCat-R #6 RRT checkItst items
DCN-R #7
Rosic design conditlens Yes Setlefactory
fabrication teametric RMft Auw. Bldg., Area 3E,
Lovei D free LDL
1K3-1205-OD6-02 (flev. 73 Settsfactory
- RAT checkIIst items 10 0
DCat-R #1
1
i
__-_ _ _ _ _ _ _ _ _ _ _
._- _ _ _ _ - ._ - . _ . - . __. _-_ - - .
' ' .
.
.
-
l
-
LABM. k . -
DRAWINoS AND DRAWIIIc CHAllCE IIOTICES (DCN) REVIEWED
(surtr 3 Dr 48 .
-
NRc
.
! Nuote r Reviewe.d ror RRY Review rindities/casaments
(Rev. - Decel ns.l LDe orletten Iser wolT7T
i
Basic design condtlens Yes Design conditlen
RHR Auw. Bldg. , Ares 3E. mox pressure is
Fehrication Iseestric tevel D from LDL Incorrect.
103-1205-019-02 (Rev. di
No Setisfactory
RRT checklist items No Satisfactory
DCN #1 ItRT checkIlst Itees No Settsfactory
DCN-R 42 RRT checkIlst Itens
DCN-R f3 *
Basic design conditlens Yes Settsfactory
Nuclear Service Cooling (See Note 2)
FerID 1X408134 Water System - System from LDL
(Rev. 141 No. 12D2
Yes Set t sfactory
Nuclear service Cooling For support or
l fel3 1X408135 water system - System associated reb. ISO. (See Note 3)
4
(nev. 16) No. 1702
Basic design conditlens No Setlefectory
NSCW Auw. Oldg., Area 3E,
Fenricetten Iseestric LeveI D Fcom LDL l
123-1202-110-02, (Rev. 10)
No Setlefactory
RRT checklist itses Settsfactory
DCN #1 RRT checklist Itoes No
No Setiefactory
DCN #2 RRT checkIIst Items SetIsfactory
DCN #3 RRT checkIist Itoes No
No setiefactory
DCSI-R #4 RRT checkIIst Items No Setiefactory
DC88 #5 RKT checkIIat Itoes No SetIsfactory
DCN-R M RRT checkIIst Items Setiefactory
DCN-R #T RRT checkIIst Itoes No
No SetIsfactory
DCN-R #10 RRT checkIIst Itoes Setiefactory
DCN-R #11 RRT checkiIst Items No
DCN-R #12
-
No SetIsfactery
- t RRT checkIIst Items No Setiefactory
DCN-R #13 *
RRT checkIIst Itoes
DCN-R #14
4
Basic design conditlens Yes Settsfactory
Fabricetten loometric IISCW Auw. Bldg., Area 3E,
Level D from LDL
1~3-1202-111-02 (lley. 4)
Ilo SetIsfactory
RRT checkIist It w Setisfactory
DCN #1 RRT checklist Items No
Settsfactory
DC81 #2 RRT checklist itses No
No Settsfactory
DCal #3 RRT checklist Itoes setiefeetory
DC88 #4 RRT checkIIst*Itoes llo
No SetIefectery
DCN #5 RRT checkIIst Items Setiefactory
DCII M RRT checkIIst Itoes No
Setteractory
DCN-R #7 RRT checklist itees No
DCN-R #6
_ - _ _ . __ _ _
_ _ _m ...o. _m
_ . _ _ _ _ . _ . . _ __ . _ _ _ _ . _ _ _ . . . . _ . . . . .. . _. . . _ . _ _ _ - . _
.
.
_TAaj,O
.
ORAWIBOS AIBO OftAWl80C CHANGE 900T ICES (DC4) fitVIEWED .
(SHtr.1 4 0F 4) ,
seRC
leumber Revleye Ititi Review Fluid tfina/Censents
_f ney. - Detel Ti t le/Desertation
istt not
Yes Setlefsetery.
stSCW-Contelament DIdg., For conformance with
Fetrication teamstric Areas 4A, 48, at 4C, associated PetlO
1K4-1202-001-04 (Rev. 7) Level A
,
- IIDYts:
1
fHtT checklists referenced are Figure 6.1-2 and Figure 6.1-3 as Included in the CPC Module 4 Iteport.
2. Listed In pedule 4 Table 6.1-5 es drowing reviewed rar procedue t compliance.
Thirty-seven essecleted DCNs were else reviewed by RRT ror procedurs t compliance.
3. Listed in leodule 4. Table 6.1-2 rer edditional verification or commitment 4917
(8tSCW velves and piping Inside containment eroe ASMC Class Fl.
!
4
I
i
!
L
4
i
I
I
4
?
.
6
4
~ - - -- - - - . . . . _ . . _ _ _ _ _ , _ _ _ _ _ _ _ , _ _ _ _
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . __ __ - , . . _ . . _ _ ._
,
._. ,
.
.
IAstt6
-
C0eISTRUCTl0ll PROCEDURES REVIEWED
(sHFET 1 or 21
penc RRT
Procedure Rey _leved For Rev i.ett f_Lt!dit!g3/fatuqE!!13 -
T_I_tJ_g
_hvener Yes Se tl efactory
As listed in Inspectlen
PPP 88-2 Levels I and II Nondestructive Report 84-36.
(6/26/M ) Examinet son Personnel Centrol.
and Adelnistration of Training,
J
.
Excelnetion, Quellfleetlen med
Certirication.
Yea SetIsfactory
As iIsted in inspection
PPP 1Il-4 Orewing and Design Centre 1 lleports 8ts-30, 85-03, (See siete 1)
Procedure,
(10/11/04) and 85-08,
As listed in Inspectlen Yes Settsfactory
f
PPP VI-5 Control of Process Sheets Reports 85-15 and 85-40.
and Wold Rod Requisitten.
( 3/22/84-PC888 ) ProcedureI compfIence
As iIsted in inspectlen Yes
penterIaI ControI unsatisfactory (Vlot.
PPP VlI~2 Reports 85-06 and 8S-14.
(10/3/94) 85-08-02) Procedure
satisfactory.
l
As listed In inspectlen No Setisfactory
!
PPP lx-M I-wT7 pee 9netic Particle Excelnetton Report 84-36.
(9/28/N 9 Procedure continuous Prod
seethod, WInte' 1977 Addende.
As IIsted in Inspectlen leo IFl SS-14-01, Proceduro
PPP IX-PT-1-W77 Penetrant Exneinatten Precedure Reports 84-36 and 85-14. Clarificetten.
-
(6/29/M) to AsseE section lit, Winter 1977
I12/3/84) Addends.
As listed In inspectlen No Settsfactory
PPP IX-RT-WT7 Redlographic Procedure IR-192 Report 84-36.
(6/29/84) Butt Welded Pipe, Winter 1977
Addende.
As listed in inspectlen No Sett sfactory
PPP IX-UT-1-W77 Ultrasonic Eweelnetlen of Idold. Report 84-36.
(4/2/82) eents, Winter 1977 Addende.
As listed in inspectlen No Settsfactory
PPP IX-UT-2-W77 Ultrasonic Eweelnatten of Sese-
less and Welded Tutular peit1lLrlel, Report 84 36.
(12/18/81) Winter 1977 Addende.
Yes IFl SS-40-01, Precedure
'
Fabrication and Field Instelletten For conformance with ASIIE Clerificetlen.
PPP IX-3 and as listed in inspection
(7/18/84) Specifications for IIuclear Power Report 85-40.
(7/20/83) Plant Ceeponents, Piping Systees
and Appurtenances, ASIE Sectlen lit,
Winter 197F Addende.
As listed in inspectlen Yes Sa tisfactory
PPP IX-16 Cold Sending of 2" NPS
Smaller leuclear and 331.1 Pipe. Report 85-1,4
'
(11/30/83)
-- __ - .- _ . _ . - - - - - -. - - -. - _ _ _ _ _ _ _ _ _ _ . _ _ __
,-.._
_ _ _ _ __ _ . __-- - .
- __
TAett_g. .
COIISTRtlCT1086 PROCEOURES REVIEWE0
(SHEET 2 0F 2) .
.
8tRC RRT
Precedure
RevIowed lor (toylew rIndIesa/Ceementa
__g uete e T Lt.t e
.
As listed in Inspectlen Yes Settsfactory
PPP IX-1g Requirements for Alignment Report 85-14
and Fltup
(8/24/84) Set t sfactory
As IIsted in Inspectlen Yes
PPP lx-64 Control of Piping Speel Closures
Report 85-14
(4/29/84)
Visual Excelnation
As IIsted'in Inspection Yes Settsfactory
PPP X-11 Report 85-14
(5/31/82) Settsfactory
As IIsted in Inspeetten Yes
PPP X-18 Fletd Welding Inspectlen
. Repo rts 3,e-30, 85- 03, 85-08
(2/2/84) and 85-14
(7/16/84-POII) Precedurel Ceepflance
As listed in Inspectlen Yes
PPP XV-2 Procedure for HandIIng Reports 84-30, 85-03, 85-08, unsettsfactory (VIOL
(7/11/84) soonconformances (FitLE) and 85-las, 84-30 02) Procedure
settsfactory.
.
As listed in Inspectlen Yes Preceduref Ceepffence
PPP XV-4 Hold Tag Usage Repo-ts 84-30, 85-03, 85-08 unsatisectory (Vict.
(4/26/84) and 85-14, 84-30-02) Procedure
(1/9/85) setIsfactory.
As listed in Inspectlen Yes Precedure compflance
PPP-GWS til/1 Ceners t 1delding Stenderd * Reports85-11s and SS-40, unsatisfactory (VIOI..
(17/14/04) 8S-40-03) Precedure
(4/15/85) satisfactory.
As IIsted in inspectlen see Settsfactory
PPP "eucteer Quellty -Section I-Organirstlen Report 85-14.
Assuance Progree -Section IX-Control of
Manuet. ASpeE Processes
Section ill, -Section V-instructlens,
Olvisloe I, Procedures, and
(8/29/04) Ormwings ,.
..g
.
IuOTE-
1 See violotlens 424, 425/84-33-01 and SS-03-01 (unsatisfactory procedurel eenfermence to upper-tier techtel
Specification Pept. Part C. Section 4, abov. 3).
.
.
e - --.,-. - . .
- __
-
. 4 .
.
MLL l
Fetto Catasset atout5rs (FCan ctvefwts
.
mRC
Rey i_lfwed_1gt matt Asvit y FlndInes/Comeents
m T I t Iafskaac rIo t ion
(S(t moIE 1) [ Bee secte 2)
satisfactory
maea System FA8 e50 RAT chechelst items fee
sa ti srac tory
so-FCae-38$4 mar checksist stems ses
so-FCae-3316F asea Systee sa t i s recto ry
meest system mRT checkelst items see
satisrectory
so-FCae-eees par checksist items see
so-FCae-12SF meen system me sa t i sfacto ry
a5CW FAS e50 ans chechsest items Satisfactory
so-FCae-sees RAT checklist 6tems see
se-FCas-3MT M5Cet FAS ISO mar chechsest stems me sa ti srecto ry
so-FCAS-3eT9 mSCW system, raa sso see setieractory
se5CW Amu. sseg., Area 3C, mai check s s a t stems
so-FCas-Se99
Lovea O ART checksist stems see Se t i s factory
se-FCat-286F se5CW System. FA8 850 see sa tI s roctory
se5CW Syssee an7 check:ist sisas Sa t i sfactory
so-FCat-3452F RRT, checklist items see
so-FCas-3493F mSCW Systee, FA8 sSO sa ti srecto ry
se-FCas-2987 as5CW FAS So, Aun. steg., ant checksist items ses
Area 3C, Lovei D Satisractory
se5CW FAS 850 ART checke ist items see
sa ti sfacto ry
so-FCas-3098 ART checksist items see
so-FCas-3863 BSCW FAS ISO Sa t i s recto ry
sBSCW FAS 150 RAT checks ist items see
Sa ti s factory
se-FCAS-3452 RAT checksist items Yes
se-FCAS-8373 NSCW FAS ISO Ice Satisfactory
se5CW FAS ISO RAT checklist stems Satesrectory
se-FCAS-12SIF RAT checks ist items see
se-FCae-34S1F #5CW Systee Adequate disposition ses sa t I sracta ry
se-FCAS-4786 ACCW Systee or finding 4-56.
i
N ..
i.
mar eseckelst referenced is Figure 6.1-5 as included in the cFC moduie as neport.
2. "Yes* Indicate the FCa was reviewed by the Aal as wes s as the stRC inspecters.
- as" ladicates ties FCR was only reviewed by seRC inspectors.
.-
e.g
-
.
e e ey
-__
O --
- _._ _ __
,
,
,
1 Aast p. .o .
NMCoasF0metAseCE MFMT3 (asCA) Asso OEVI AT tool REPORTO (M) MVIEw(D
..
f Ied # egg 3/Caqueants
m AAY Remiesed O_natves far
MT Chec k e i s t satisrectory .
MCa 130S Vos satisrectory
Vos ART Checksist Satisfactory
M 1348 M T Checksist
M 1396 vos MF Checkt ist Sa t i sfac to ry
MS 2984 Ws MT Checklist satisfactory
Ma 2964 Vos Satisfactory
Wes MT Checklist
M S 3998 M T Cnecksist Satesractory
MS 4001 Vos satisfactory
Vos ami chechtist Satisfactory
M 4372 RAF Check:Ist
Ma 6328 Vos satisfactory
vos stfli Caseckl i s t
MS 6394 festi Checkl i st sa ti sf ac to ry
M 6306 Vos RAT Checksist Satisfactory
M 6393 vos MY Checklist satisfactory
M 6934 Ws M T Checklist satisfactory
M 6999 Vos Setesractory
Vos M T*.Chec k l i s t satesractory
M 73T3 MT Chechtist
M 7337 Vos satisractory
Vos MT Chec k I l st satisfactory
M 7934 MT Checklist
M 7917 Vos satisfactory
Vos Insti Casecklist satisfactory
SR 7962 M T Checklist
M 7975 Vos Satisfactory
Vos RAT Checklist satisfactory
M 7999 MT Checklist
M Sil2 Vos Satisfactory
Wes ant Checksist Satisfactory
as att3 sesti chech t i st
M 86A6 Ves Satisfactory
We NAT Cstack s i st Setisrectory
M 8693 MT Chit:kIiSt
M 93eg Wa M T Checklist Sa ti sfac to ry l
M 9339 Vos Satisfactory
me MT Checklist
M S3st
h:
1. The W #eviensors engelmed the ateve IICAs and 3Rs to the sees criterieSpeelfically, this was take criteria in Itseule 4 reper
aseed W the Get MT.
D. Tmaraw sin aos sa sedetsee to the esews were rowIowed as sescribed Ie NAC Aspers
emetab-36. ese et them, sa 6997, was a Sa sevleues ey the ant.
.-
.
.
%
~ W , O. .- . .. ,
._ - . - - - . . - . - - _ - . .
. - _ .- . . - _ - - . - _ - . _ _ - _ _ _ _ - . - - _ - _ - _ _ - . _ - . . _ - -_-
,
l TASLE 9
<
i
Pet 0CUGOIEIIT SPECIFICATI0sts AaIO VEle00ft ORAWIIIOS ROrl[W3 I
l
-
,
i IsetC RRT
Specificetten er . Raylew FIMines/Ceegania
1
' Tltie/pe.screstsee Revlewed For ~
I
Bremiam Essamer ART review considered
'
RRT chechi s st items. Yes
specirteetles Mhate84 thes Fenrication of Inadeguate. Casecklist Stees -
l
Ateeseheric Tanke tulit Assessed fifti checkIlst 2, 4, 7, S, 11, 12, and 13
-
J (Asw. S. 6/1S/94) to A&seC III/ItteR System ( F i g . 6.1-7 ) and chec k- were inadeguetely specirled
- IIst performance by and/or perfereed. IIIRC
IS Velve. reviewing specaricetten
1
inspectors identified apparent
and ART checklist itse leproperly specified er
, entries with RAT mester seltted requirements in
J wete perfereed RAT review. specification M4Alends involving
I
railures to specify AleSI
1845.2.11 and Ac 1.44 require-
ment and selssten of units en
specirled redletion levels.
.
l RAT checklist stems Yes ART review considered
wonder orewing Assa aselation velve Assessed RAT checkelst
snedeguete. see signiricant
! Enesesuistion vesnes checksist itees were completed
1 innassen-23-13 trig. 6.1-el and cliecklist my Aar. some cheeksist Itees
'
(3/17/st) perrereence my reviewsne
vender drawing and RRT which cause neve been verirled
were merked not opplicomte er
i checksist ites entries not esclied at eiI. One checet-
I wIth RRT emeter wees sist a toe was incorrectly !
perfereed review.
.
I
1 verirled. The vender drowing
l
!
was partially Iilegible.
j
i
l
1
l
I.
- .-
' *n
,
.
i
.
!
!
!
_ . _ . . _ . . , _ . . _ _._ _.._. . . _ _ _ , _ _ . _ _ _ _ _ _ _ _ _ _ _ _ , _ _ . . . . _ , . _ _ . , _ _ . . . _ _ , . . , _ _ . , . , _ _ . . . _ . . _ _ . _ _ _ _ . , _ . . . . _ _ . _ ._._ . _._ ,._._ _ . _ . . . _ _ _ .
_-_--___ - - - . -- . - , -- . .. . . - _ _ _ _ _ - _
,
t
.
. ,
LAst(,,,10
- 6
READINESS REVIEW MfCHANICAL DESIGN TCAff RfASINESS
INFORMATION REQUESTS REVIEWCO
NRC NWC
Roguest Inforestion
Resolution / Project
R*3.Lwed ,,f,gg fl M RE N
._8?e9Me_s.te.d,_ Re_stP31*
N
Adeguecy or response Setlefectory
DC-1205, Table 1 Identirles The ehenge is streedy documented (INIC Inspectors verifled
4-28 in OC-1204 which is referenced
Westinghouse as providing project response by
check volves larger then 2 ". From OC-1205. No corrective action review or DC-1204.)
required,
DCN 9 to the RHR PerID
Incorporates Bechtel .
supplied Ill" check valves
122 and 123. A change to
DC-1205 is recommended. Setlefectory
A curve generated free the calcule. Adeguecy or response
'
4-1 FSAR Section 6.3.1 states tion provided. the temperature (NRC Inspectors verlflod
that the elevated tempere-
is the by product or e LOCA. The curve referenced. )
ture of the containment sump curve is for egulpeent quellrication,
- solution Iin accident not design.
condition) is within the
.
design toeperture or LCCS
l
components. Provide the
elevated temperature calculation l
(for vert rication),
.
l
.
!
4
4
I
<
, .
4
i
4
m -- .. . --e. , - . - - - =. - - - - , , , - - - ne- - --,..m-e < .---,=- e e,- - e- - - - . . , - - - - = .
,
_ __ __
,_ _. _
t .
t .
,.
.
1
!
1ASLCll.
' RFADINESS REVIEW MECHANICAL DESIGN TEAM Fil0 DINGS REVIEwtD
r
'
l
IIllC HRC
RRT Resolutlon/
Finding Level / Revfewed_f,pf FIndInes/Comument
ItflT FlOdIgg Cetegoty Egpject. Resp.onog
88MalPer flecolution inedeguete
til MELS DC 1018 in revision Adeguecy or resolution in Identificetlen er
4-75 Five orbitrary
project to status chorees and revision to DC-1018 follow-en committeent
,
. Intermodlate break weekly to prevent en regemed require.
locations deleted. recurrence, monts to Ceemitments
t
inconsistent with related to STP MES 3-1
Design Criterle,
l -
leRC Inspectors owsmined Vertried originof
l Speelficetlen cover page
4-85 Cover page for MilAH0% lli edeguecy of corrective conditlen was not e
i spectrication and tech- was corrected. Other action including action safety concern. Fewnd
equipment spectrications additlenet eweeples
nical provisions do not
give proper Project Class were checked and round to determine ir conditlen or deciements with
was en isoleted incident.
,
.
to have correct Project lacerrectly specirled
'
for RNR isoletion Velve Classes. Tonk require- PreJoct Cissses = pene
l Encepsufstion Tank. ments specirled were appeared te the e
I
'
settsfactory. serety concern.
,
!
}
!
!
J
<
1
+
i
i
l
l
<
.
I
4
i
,.
4
3
-- . - - - . _ - - _ - . - _ . . - - - - - . - - - - . _. . - . . . - .
- -- - - - - - - - - --
. . . . ,
' * ,
'
j .
1
.
LA81t;._g
.
illSPECT1000 AND RECOROS REVIEW FOR INSTALLEO MECHANICAL E41flPMEllT AND PIPfl10
(SHEET 1 Or 9) .
.
Nardware inspection Records Review Ceements/ Findings
Egelament/ Piping RRT MllC RRT hAC Lges nasa 11
i l
J.dR!!1Lflge_tu_on
.1K3-1205-003_01 R/21
Ne31dueI Hoet RemoveI,
f;brleetion loometric,
Auw. Sieg. Areas 3E k 30,
Lcvel O
RMII NOV Encepsulation vessel No YES - See Table 12-1 Apparent discrepencies
VI-1RQ)-Ve=001
NO YES - See Table 12 1 in hardwere. See Totte
-
12-1 end text.
!
1
Pla.Lne Megr[ple Set t sfectory
No YES - See Table 12-2 NO NO Settsfectery
Spool Piece 003-5-06 NO YES - See fetle 12-2
Spool Place 028-5-01 NO YES - See Table 12-2 NO NO
Settsfactory
' Spool Piece 061-5-01 NO YES - See Table 12-2
<
Piping Meterial (for spool piece Settsfectory
.
!
- -
- YES - Certification per Code
! 061-5-01) Het L4245
.'
fIeId_Wp.19.3 I
Satisfactory
YES - Code Visual Reg. NO YES - Used RRT Checklist Satisfactory
028-W-01 and Repair 3 NO
YES - Code Visual Reg. NO NO
061-W-01 NO Setisfactory
i
NO YES - Code Visual Reg. NO YES - Used RRY CheckIlst Se t t sfactory
'
003-W-01 No YES - Code visual Reg. NO NO
028-W-02A Setisfactory
l
NO YES - Code Visual Reg. NO NO Settsfactory
028-W-029 NO YES - Code Visual Reg. NO NO Setlerectory
003-W-01 No YES - Code Visual Reg. NO NO SetIsfactory
003-W-02 No YES - Code VIsueI Reg. No YES - Wer1 fled the OveIIficetlen
,
003-W-03 of Welder identitled in
i WeIhdown
j NO YES - Used RRY Checkflet See secte 2
NO YES - Code Visuel Reg. Sotlefactory
f 061-W-03 NO YES - CodetVisual Reg. NO NO Setlefectory
i 061-W-03A NO YES - Code Visual Reg. NO NO Set l efectory
l 061-W-04 NO YES - Code Visual Reg. NO NO Setisfactory l
! 061-W-02 No YES - Code Visual Reg. NO NO Settsfactory
! 061-W-02A NO YES - Code. Visual Reg. NO NO
,
- 061-W-01
j
1.!gj.qli ne Me te ria l s.
(two selected Setlerectory
r for ebeve welds) -
- YES - Certifications per Code Settsfactory
!
ER 308L, Het 05394 -
-
-
- YES, - Certifications per Ceds
and Hit NH017
4
- - - See note 3
-
{ ltLht.E
'
l
!
!
I __ . _ _ _ , ._. _ . _ _ _ _ _ . . _ _ _ _ . . _ . . _ - . _ _ . _ . . _ _ _ . _ _ . , _ _ _ _ . _ - _ . _ . _ _ . . _ , ._ . _ _,__ ~ . . . _ _ _
.
_ .. _
-
_
,
.
JAM 1%
.
INSPECTIOlt AND RECOIL 0S REVIEW TOR INSTALLED MECHANICAL EgglPMEftf ANO PIPIIIS *
(SHEET 2 0F 9)
.
Hardware Inspectlen n=c--dn Review CeementalfIndInes .
E freent/ Piping RRT GRC ISee ;ma 11
I tIfIcetien RRT NRC
1K3-1205-004-01 R/17 .
fle3idual Heat Memova l,
!. f&tprication isometric,
Auw. Sidg. Area 3E, Leve l 0, .
P1 pine Meterfels,
Seoei PIoce Setisfactory
NO YES - Code Visual Reg. NO YES - See 100te 6 Satisfactory
004-S-01 (14" NO YES - Code Vihuel Reg. NO YES - See feste 6 Setlefectory
i 004-4-03 (14")) NO YES - Code Vlnual Reg. NO YES - See Note 6
'
004-5-04 (14")
,
(Hea t No. ' 6714 ( Al l 3))
U.e_Ld._WeJJ.a Setisfactory
NO YES - Code Visual Reg. NO YES - Used RRT Checklist Setterectory
-
004-W-01 YES - Code Visual Reg. NO YES - Used RRT Checklist
004-W-02C NO Setisfactory
NO YES - Code Visual Reg. NO YES - Used RRY Checklist Settsfactory
004-W-020 YES - Code Visuel Reg. NO YES - Used RRT Checklist
004-W-03 .NO
' Weldine Meterfels Setisfactory
l
Wil: 2598252 NO NO NO YES - See IIste 7 Settsfactory
1/8" E300L NO 90 0
NO YES - See 100te 7 Setisfactory
- 1/16" ER308L Hil
- 26245 NO 10 0 NO YES - See Ilote 7 Setisfectory
i 3/32" ER308L Hil: 05394 No 10 0 No YES - See feste 7 Setisfectory
1/8" ER308L HN: 05394 NO ff0 NO YES - See flote 7 Setisfactory
3/32" E308L HN: HH010 NO NO NO YES - See IIste 7 Satisfactory
l 3/32" E308L Hil: HH011 NO YES - See 100te 7
NO NO
'
3/32" E308L M80: 2598267 ,
I
s*
. .,
4 .
.
4
!
,
h
4
. . . - . - ,. . . - . , . . - . , . - . . .-. - ---.- - -.,.-. - .- - --- - . --. , - - . . - -
. _ . . _ _ _._ _ _ . _ _ _ .
_
. l .
.
14a g _12 .
ICSPECTION AXn RECOROS CEVIEW ron II:STALLE0 MECHANICAL EOUlreet:T Asto r191100
( SHE E 7 3 CF 9)
.-
Hardware inspection Records Review Commenta/rIndlnes
'
E paent/ Piping
RRT NRC RRT NRC ISee note 11 ,
I tiricet!en
1K3 - 120b006-02 R/7
Residual Heat Removal, -
FCOricetten isometric
Auw Sidg., Area 3E, [evel D
Pleine Statorials Setlerectory
NO YES - Code Visual Reg. NO YES - See liete 7
. 1205-026-3/4"
NN: 464276 Setteractory
No YES - Code V{sual Reg. NO YES - See Rote 7
1205-006-2"
NN: 465158
Velves Setisfactory
,
1
NO YES - Code Visual Reg. NO YES - See liete 7
054 SN: N749AAll Code steeped name-
NO YES - Code Vlnuel Reg. NO YES - See feste 7 plate won elssing
CIS SN: NO31AAN From vsivs.
Field We 3 Setlerectory
NO YES - Code Visual Reg. NO YES - Used RRT Checklist satisfactory
006-W-102 NO YES - Code Visual Reg. NO YES - Used RAT Checklist Set t erectory
006-W-103 NO YES = Code Visual Reg. NO YES - Used RRT Checklist Setlerectory
006-W-104 NO YES = Code Visual Reg. NO Yr5 - Used RRT Checklist satisfactory
006-W-105 No YES - Code Visual Reg, NC YES - Used RRT Checklist Setierectory
006-W-106 No YES - Code Visual Reg. NO YES - Used RRY Checklist Setierectory
006-W-107 No YES - Code Visual Reg. NO YES - Used RRT Checklist
026-W-107 .
.
.
, ..
!
.
,
!
!
_. - . - - . _ - , . _ - - _ . _ _ . _ . . - . . _
~ *\
. _ _ _. -
_
3. .
TABLE 12
IRSPECTION AND RECORIS REVIEW FOR INSTALLED MEC'HANICAL EQUIPME%T AND PIPINC
(SHEET 4 0F 9) ,
.
Equipment / Piping - Hardware Inspection Records Review
identification RRT NRC RRY NRC ISee note 11 Comments /Findines
1K3-1205-019-02 R/6
Residual Hea t Remova l , ,
Fchrication Isometric, Aux. Bldg.,
Area 3E, Level D
Plaine Meterials
YES - Code Visual Reg. NO YES - See Note 7 Sati sfacto ry
1205-019-2" NO
, (Between welds 019-W-111
and 019-W-101) HN: 466294 ,
.
Ploe Fittlnes i
YES - Code visual Reg. NO YES - See Note 7 Sa ti sfacto ry
90* Elbow 2" NO
(Between welds 019-W-002
and 019-W-003) HN: JJ
Velve
NO YES - Code Visual Req. NO YES - See Note 6 Sa t i sfacto ry
003 SN: H739AAN
Fleid_ Welds I
019-W-101 NO YES - Code Visual Req. NO YES - Used RRT Checklist Sa t i sfacto ry
019-W-102 NO YES - Code Visual Req. NO YES - Used RRT Checklist Sa t i sfacto ry
019-W-103 NO YES - Code Visual Req. NO YES - Used RRT Checklist Sa ti sfacto ry
NO YES - Code Visual Req. NO YES - Used RRT Checkilst Sa t i s fac to ry
Ol9-W-104 Sati sf actory
019-W-106 NU YES - Code Visual Req. NO YES - Used RRT Checklist
- 019-W-109 NO YES - Code Visual Req. NO YES - Used RRT Checklist Sa ti sfacto ry
,
t
.
s
4
9
i
$
_, ,, _ ,_. . . , _ , . _ _ _ . . . . - , . -
_ . _ _ . . _ . _ _ . _ , . _ , .
_ _ _ _ . - _ _ _
.) . - _ _
,
- .
.
.
IABl.E _12 ,
INSPECTION AND RECOROS REVIEW FOR INSTALLED MECHANICAL EQUIPMENT AND PIPING *
(SHEET 5 0F 9)
Equipment / Piping Hardware Inspection Records Review
identification RRT NRC PRT NRC fSee note 11 Comments /Findines
1K3-1202-110-02 R/10
,
-
Nuclear Service Cooling Water
Fcurication isomectric
'
' (CSCW) Aux. 81dg. , Area 3E.
LCvei D
i Ploine Meterials
!
1202-377-2" NO YES - Code Visual Req. NO YES - See Note 7 Sa ti sfactory
(From RNR Pump to Tee) ,
YES - Code Visuel Req. No YES - See Note 7 Sa ti sfactory
1202-110-2" No
( f rom RHR Pump to
i
Valve 096) HN: 465158
Ploe Fittinos
YES - Code Visual Req. No YES - See Note 7 Sa ti sfactory
l 90* Elbow 2" . NO
(Between welds 110-W-137
and 110-W-138) HN; CA
'
Velve ,
i
! 096 SN: H30SAAR- NO YES - Code Visual Req. NO YES - See Note 7 Satisfactory
Field Welds
110-W-135 No YES - Code Visual Req. NO YES - Used RRT Checklist Satisfactory
110-W-136 NO YES - Code Visual Req. NO YES - Used RRT Checklist sa ti sfactory
110-W-13T No YES - Code Visual Reg. NO YES - Used RRT Check 11st Satisfactory
110-W-138 NO YES - Code Visual Req. NO YES - Used RRT Checklist. Satisfactory
110-W-139 NO YES - Code Visual Reg. NO YES - Used RRT Checklist Satisfactory
110-W-144 NO YES - Code Visual Req. NO YES - Used RRT Checklist Sa tisfactory
NO- YES - Cgde Visua1 Req. 'iO - YES - Used RRT CheckIist SetIafactory
110-W-149A
..g
.
,
,
d
.
,
i
_ . . . _ _ _ _ . . , _ , _ . . _ _ .. ._ _ _ . . ._. . _ _ ,
-- .- . . . . .
.
.
.
J3S C g
IllSPECil000 AND EECOSOS CEVIEW FOR 1% STALLED MECHA81lCAL EgillPME%T AND PIPING
(SHEET 6 of 91 * .
.
Herdwere inepectien Recerda RevIow -
7mMindines
- Epipoent/Plp1pg RAT NAC RRT NRC isee nata 11
I _ lficetten
1ES-1989-111 et R/14
Itucteer Service Coeling Water,
FCOrlestion losestric,
'
Anar. Sieg, Aree 3E, Level O
Penine Besterials Setterectory
YES YES - Code Visual Reg. YES YES - See IIste 7
,-
1202-376-2"
i
(Setween weld 111-W-167C
valve 099) HII: 465158 .
MR.liff Settsfactory
NO YES - Code Visual Reg. NO YES - See flote 7
099 Sft: 181532AAT
Plas Fittines
Settsfactory
YES YES - Code Visual Reg. VES YES - See Ilote 7
. 90" Elbow
j (Setween welds 111-W-168
and 111*W-169) Hel: EA '
Settsfactory
NO YES - Code Visual Reg. NO YES - See liste 7
,
.2" x 3/4" SWAS ;
! (Setween volve 099 and
,1 weld 111-W-169) HII: M5437
.
l
1
1
!
l
'
i
,
! .
1
.
i
.'
l
l
I
i
i
!
!
!
i
i ,
- - - - - . . . . . - . . , . . - . _ _ . _ _ . _ _ _ _ - __
--
, -3 ,
,
-
us1Lljt
IllSPECTI0ft AND REC 0ftOSiREVIEW FOR INSTALLE0 MECHANICAL EOUIPME%T AND PIPING
(SHEET 7 Of 9) , ,
Hardware Inspection Records Review CommentalfInalInes
Epipment/ Piping R.R T NRC RRT MP_C fSee meta 1l .
I 7Iflestien
Nuclear Service Coeling Water,
FCCrication Isometric,
Auu. Side, Aree 3E, Level 0
fleid Welds
Settsrectory
111-W-167-D YES YES - Code Visual Reg. YES YES - Used RRY Checklist Setisfactory
YES YES - Code Visuaa Reg. YES YES - Used RRT CheckIist Wrong NN recorded for
111-W-168 YES - Code Visual Req. NO YES - Used RRT Checklist
111-W169 NO 2" x 3/4" SWAG en
weld process sheet
2
for weld 111-W-169
YES - Used Rfti Checklist Settsfactory
NO YES - Code Visual Reg. NO SetIsfectory
111=W-170
111-W-146- YES YES - Used RRT CheckIist YES YES = Used RRT Check 1Ist Satisfactory
111-W-145 YES YES - Used RAT. Checklist YES YES - Used RRT Checklist Setisrectory
111-W-179 YES YES - Used RRT Checkilst YES NO Setlefactory
111-W-181 YES YES - Used 1RT Checklist YES NO Satisfactory
111=W 182 YES YES - Used ART Checklist YES NO Setisfactory
111=Wal83 YES YES - Used RAT Checklist YES NO Satisfactory
111-W 180 YES YES - Used RRT Checklist YES YES - Used RRY Checklist Settsfactory
111-W144 YES YES - Used RRT Checklist YES YES - Used RRY Checkilst Settsrectory
111-W143 YFS YES - Used RRT Checklist YES YES - Used RRT Checklist Se tI sfectory
111-W=142 YES YES = Used RAT Checklist YES YES - Used RRY Checklist Se t t sfactory
111-W-141 YES YES = Used RRT Checklist YES YES - Used RRT Checklist (See Note 4)
.
Satisfactory
111-WITS YES YES - Used RAT Checklist YES .410 Setlerectory
111-W 140 YES YES = Used RRT Checklist YES YES - Used RAT CheckIlst Set t eractory
111-W-139 YES YES - Used RRT Checklist YES YES - Used RRT Checkilst (See Note 4)
Setisfactory
111-W-138 YES YES = Used RRT Checklist YES YES - Used RRY CheckIlst Settsfactory
111-W137 YES YES - Used RAT Checklist YES YES - Used RRT Checklist Settsfactory
111=W 136 YES YES - Used RRT Checklist YES YES - Used RRT Checklist Setisfactory
NO YES - Used RRT CheekIIst No YES - Used RRT CheckIist Setiefeetory
111-W-135 YES - Ugesi RRT CheckIist NO YFS - Used RRT CheckIIst
111-W-134 NO Satisfactory
NO YES - U RRT thecklist No YES - Used RRT CheckIlst Settsrectory
111=W-133 RAT Checklist NO YES - Used RRT CheckIsst
111-W-132 NO YES - U Setisfactory
111-W=131 NO YES - Used RAT Checklist No VES - Used RAT Checkilst Setiefactory
Ill-W 130 NO YES - Used lUtT CheckiIat NO YES - Used AllT CheckIIst Se ti sfactory
111-W-129 NO YES - Used RRT Checkitat 100 YES - Used RAT Checklist Settsfactory
NO YES = Used RRT Checklist NO YES - Used RRY Checklist
111-W123 NO - YL4 - Used RRT Checkiist NO YES - Used IIRT CheckIIst
Setiefeetory
111 W=1278
.
6
-- -,,---------,--,,nm-w,m-a- - . . ,-,,-me- m..,. , . - ,-m.w ---,--,-m.,m--, . - , ,,-,,-e ,,e-,,,s -n--,.- . - - - - - - - - - - - ,,-. - ---
_-__ _ _ _ . - - _ _ - . .- - - - - . . . -. -
,
.
.
IeRLL_IE -
t
lilSPECil001 AND RECORDS(SNEET
ItEVIEW FOR I:: stall.ED MCCHANICAL EOUlPIICT A400 PIPIIIO
8 0F 9)
,
Hardware laspectlen itecords Review -
7ta#1ndinas
Equipment / Piping MRT NAC _
RRT NRC fSee nata 11
I 21Fication
tem-12e2-001-es R/T .
lluclear Service Coeling Water,
Fabricetten Isenstric,
Centelament Sieg.,
,
Areee 4A, 48, and 4C, Lovei A
.
Field Wolds Satisfactory
YES YES - Used RRT Checklis; YES VES - Used RRY Checklist satisfactory
001-W-11 YES YES - Used RRT Checklist YES YES - Used RAT Checklist Satisfactory
) 001-W-21A YES YES - Used RRT Checklist YES YES - Used RRT Checklist Setterectory ,
001-W-22 YES YES - Used RRT Checklist VES YES - Used RRT Checklist Settsfactory
i 001-W-23 YES YES = Used RRT CheckIlst YES YES - Used RAT Checklist Satisfactory
001-W-24 YES YES - Used RRT Checklist YES YES - Used RAT Checklist
001-W-2S
l Seeel Places Setlef'octory
- YES YES = Used RRT Checklist YES YES - Used RRT Checklist Satisfactory
,
001-S-24 YES YES - Used RRT Checklist YES YES = Used RRT Checklist Satisfactory
l
001-S-25 Yts YES - Used RRT CheckIlst YES YES - Used RRT Checklist setIsfactory
- 001-5-2S PCI YES YES = Used RRT CheckIist YES YES - Used RRT CheckiIst (see Rete '))
) 001-5-26 --
SetIsroctory
YE5 YES - Used RRT CheckIIst YES YES - Used RRY CheckIist (See flote' SI
< 001-S-27 Setiefeetory
'
001-S-28
YES YES - Used RRT CheckIIst YES YES = Used itRT CheckIIat
I
t
l HMOR peECMAltlCAL EOUIPseElli
l ReR_liset Exchenestr SetIafeetory
1-1205-E6-001
YES YES - Used RRT CheckiIat YES YES - Used IIRT CheckI a st
,
.
t
!
cvCS Positive Olsplacement **t
,
l PIN 8PS SetIsfoctory
NO
t
1-1298-P6-001
YES YES - Used RRT ChechlIst NO
!
<
"*N YreIa A Puess Unsetiefeetory
,
i NO YES - Used RRT Checklist NO YES - Used AfiT ChochIIst inedegueto
l 1-1202-Pee-001 PreventIwe
i NO YES - Used RRT CheckiIst NO YES - Used 1101T CheckIist Its intenance
4 1-1202-PIB-003 (VIO SS-40-03)
- NO YES - Used RflT CheckIiet NO YES - Used itRT CheckiIet
1-1202-Pts-005 !
i
i
l v
4
4
'
. . , . - - - - , - . . , , _ . . . - . . -.. - - . , . . _ - - . _ . - . - ~ . - . - . _ - - - . . . . . . - . . .-- . . . - - . . . . . _ . -
~ ~
., ';
, i ,
1
.
IA8 0 R = ,
186SPECTION ANO REC 0llOSiREVIEW FOR INSTALLE0 MECHANICAL EGulPIEC T Asso PIPIIIC *
(SNEET 9 0F 9)
l MIES:
, 1 AR Checklists referenced are rigure 6.2-1, Figure 6.2-2, rigure 6.2-5 and Figure 6.2-6 as included in the Opc tendulo 4 RR
repert.
The revielen should
2. One einer deficiency was identirled - a revleton pueber had been leproperly corrected on a process sheet.insteed the revision was corrected in a men
have been Ilned thru, initleted and dated and the correction entered.; ather f eelsted case end was judged to have ne serety ,
that it was not apparent a correction had been mode. This appeared 4,r ,
significence.
Indicated that the bellows expension Jelpt en the
3. The IIRC
value reviewer found
encapsulation vessel a sketch wouldinhewith the other
Jacked out torecords reviewed
recilitate thatwelding of a piping piece between the containment
ritup and well
Licensee
cad encapsulatten vessel. The reviewer questioned whether this Jacking had been property engineered and approved. -
personnel infereed him that it had. The reviewer identirled verlrication of the engineering and approval as en inspector
reIlowup Itee.
. 1
4 HerWwere Inspection confirmed corrective action in response to RRF-4-46 (als-stenciled welds)
S, Nordware inspection confirmed corrective octlen in response to RRr-4-45 (Arc strikes)
'
4.
Verlfled that records included Code Date Report and Receipt inspection Report required by constructlen precedures.
7. Verirled that records included Material Certification and Receipt inspection Itoport required by constructfen
precedures.
!
!
! ,
,