ML20136H998

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20136H998
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/10/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML20136H988 List:
References
NUDOCS 9703190392
Download: ML20136H998 (1)


Text

'

4 INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 l 10 Center Rd. Report Date: 12/10/96 Perry, Ohio 44081 )

Laboratory: Electro-Analytical 1 Date of Sample: 12/2 to 12/3/96 Time of sample: 10:05 Sample Location: Sewage Pump Station Name of Sampler: Beckler Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 12/3 to 12/9/96 Flows 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 12/04/96 180 mg/L BOD Composite 405.1 12/09/96 26 mg/L TSS Composite 160.2 12/06/96 150 mg/L Silver Composite 200.7 12/06/96 <.01 mg/L Mercury Composite 245.1 12/10/96 <.5 ug/L  !

l pH Grab 150.1 12/3/96 8.0 s u.

Oil / Grease Grab 413.1 12/9/96 9.9 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

Sr. Vice President - Nuclear Signat,a(re / Date Title 9703190392 970313 PDR ADOCK 05000440 R PDR