Coremonwcalth r21ison Com;uny .

, Drexten Generating 5tation

. . 6MM) North Drrxlen Road

. Morris, IL N)150 Tel H15-942 2920 March 10,1997 JSPLTR 97-0049 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Data Report for February 1997 Dresden Nuclear Power Station Commonwealth Edison Company Docket Nos.50-010,50-237, and 50-249 Gentlemen:

Enclosed is the Dresden Nuclear Power Station Monthly Operating Summary Report for February 1997.

This information is supplied to your office as required by Technical Specification 6.9.A.5, in accordance with the instructions set forth in Regulatory Guide 1.16.

Sincerely, b

f.ktephen If eny Site Vice President Dresden Station Enclosure cc: NRC Region III Office Illinois Dept. of Nuclear Safety, State ofIllinois /

l NRC Senior Resident Inspector UDI, Inc. - Washington, DC M j File / Numerical 9703180042 970228 i PDR ADOCK 05000010 hE,$% HEE,E,IE l A Unicom Comgun)

h

, 1 1

a MONTHLY NRC-

SUMMARY

OF OPERATING EXPERIENCE, ,

l PER REGUIATORY GUIDE 1.16 FOR DRESDEN NUCLEAR POWER STATION j COM40NWEALTH EDISON COMPANY FOR FEBRUARY 1997 i UNIT DOCKET LICENSE 1 050-010 DPR-2 2 050-237 DPR-19 3 050-249 DPR-25 l

l I

1 I

l I i l I l 1 Li\e360\8301\ Misc \97\97020602,GA i

4 TABLE OF CONTENTS FEBRUARY 1997 NRC REPORT 1.0 Introduction 2.0 Summary of Operating Experience 2.1 Unit 2 Monthly Operating Experience Summary.

2.2 Unit 3 Monthly Operating Experience Summary. i i

3.0 Operating Data Statistics 3.1 Operating Data Report - Dresden Unit 2 3.2 Operating Data Report - Dresden Unit 3 3.3 Average Daily Unit 2 Power Level 3.4 Average Daily Unit 3 Power Level 3.5 Unit 2 Shutdowns and Power Reductions 3.6 Unit 3 Shutdowns and Power Reductions 4.0 Unique Reporting Requirements 4.1 Main Steam Relief and/or Safety Valve Operations -

Unit 2 and Unit 3 4.2 Off-Site Dose Calculation Manual Changes 4.3 Major Changes to the Radioactive Waste Treatment Systems ,

4.4 Failed Fuel Element Indications 1 4.4.1 Unit 2 4.4.2 Unit 3 5.0 Technical Specification Amendments 5.1 Amendments to Facility License or Technical Specifications 5.1.1 Unit 2 5.1.2 Unit 3 l

l i 1

]-  !

l

)

2 Lt\8360\9301\M!sc\97\97020601.GA I

l

1.0 Introduction Dresden Nuclear Power Station is a three reactor generating facility owned and operated by the Comed Company of Chicago, Illinois. Dresden Station is located at the confluence of the Kankakee and Des Plaines Rivers, in Grundy County, near Morris, Illinois.

Dresden Unit 1 is a General Electric Boiling Water Reactor with a design net electrical output rating of 200 megawatts electrical (MWe). The unit is retired in place with all nuclear fuel removed from the reactor vessel. Therefore, no Unit 1 operating data is provided in this report.

Dresden Units 2 and 3 are General Electric Boiling l

Water Reactors, each licensed at 2527 megawatts thermal. The gross outputs of Units 2 and 3 are 832 and 834 megawatts electrical, respectively, with design net electrical output ratings of 794 MWe each. The commercial service date for Unit 2 is 11 August 1970, and 30 October 1971 for Unit 3.

Waste heat is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois River i for blowdown.  !

The Architect-Engineer for Dresden Units 2 and 3 was .

Sargent and Lundy of Chicago, Illinois. I This report for February 1997, was compiled by Gary A. l Abrell of Dresden Regulatory Assurance Staff, telephone i number (815) 942-2920, extension 3749.

3

! L:\8360\B30)\ MISC \97\970?O601.GA l

l

. . . _ . - - . _ _ . . _ _ . _ - . . ~ .__ . - - . . . ___ - . - _ _ _ . _ .

ll 2.0 SUt44ARY OF OPERATING EXPERIENCE EUR FEBRUARY 1997 2.1 UNIT 2 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 2 was on system at the beginning of the  !

period near full power. At 0110 on February 1, 1997, load was reduced to 676 MWE for surveillance testing. Load increase to full power began at 1115 that day.

l At 1148 on February 3, 1997 load was reduced 130 l MWE to remove 2F Condensate Demineralizer Unit from service. Full power was restored at 2300.

At 0050 on February _8, 1997 commenced a load drop to 550 MWE for surveillance testing. Load was held at this level following discovery of a ,

mispositioned control rod. Load increase was begun on February 12 following the investigation and corrective action.

At 1915 on February 14 commenced load drop for-control rod drive exercising and other minor maintenance including adding oil to 2A Recirc Pump

' Motor Bearings. Load increase began at 1020 on February 16, and the unit was near. full power by i 1040 on February 17.

The unit remained at full power until 2110 on February 27, 1997 when load was reduced approximately 10%.because feedwater inlet  ;

temperature exceeded the nominal value of 340*F.

The significance of this condition is under investigation.

l t

I l

l 4

1 4

Li\B360\B301\ MISC \97\97020601,GA

l .

l 3.0

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1997 2.2 UNIT 3 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 3 was on system at the beginning of the period following startup at the end of January 1997. Load was increased during the period until the full coast down capability was reached. Coast down operation continued throughout the period.

1 i

I l

I 5

1.13 D M O \ B )01 \ MISC \ 97 % 9 7 0:0001. GA I

4 a

.t M

3.0 OPERATING DATA STATISTICS 3.1 OPERATING DATA REPORT - DRESDEN UNIT TWO DOCKET No. 050-237 DATE MARCH 4, 1997 l COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 4

i OPERATING STATUS

1. REPORTING PERIOD: FEBRUARY 1997
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) : 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe NET) : 772 DESIGN ELECTRICAL RATING (MWe Net): 794
3. POWER LEVEL TO WHICH RESTRICTED (MWe Net): No restrictions
4. REASONS FOR RESTRICTIONS (IF ANY): See Section 2.1 of this report.

REPORTING PERIOD DATA PARAMETER i THIS MONTH YEAR TO DATE CUMULATIVE HOUR 5 IN PERIOD 672 1,416 232,752 TIME REACTOR CRITICAL 672 1,416 168,578 TIME REACTOR RESERVE SHUTDOR4 (Hours) 0 0 0 TIME GENERATOR ON-LINE (Hours) 672 1,416 160,431 TIME GENERATOR RESERVE SHUTDOM4 (Hours) 0 0 1 THERMAL ENERGY GENERATED (MWHt Gross) 1,504,252 3,190,483 334,894,384 ELECTRICAL ENERGY GENERATED (HWRHe Gross) 487,476 1,036,537 106,934,473 ELECTRICAL ENERGY GENERATED (MNEHe Net) 465,404 991,584 101,093,313 REACTOR SERVICE FACTOR (%) 100.0% 100.0% 72.4%

REACTOR AVAILABILITY FACTOR (%) 100.0% 100.0% 72.4%

GENERATOR SERVICE FACTOR (%) 100.0% 100.0% 68.9%

GENERATOR AVAILABLILITY FACTOR (%) 100.0% 100.0% 68.9%

CAPACITY FACTOR (Using 2C:D Net) (%) 89.7% 90.7% 56.3%

CAPACITY FACTOR (Using DER Net) (%) 87.2% 88.2% 54.7%

PORCED OUTAGE FACTOR (%) 0% 0.0% 12.5t

20. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS: NONE
21. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 6

Li\8360\0301\ Misc \97T97020601.GA

~ _ _~ . - - . _ _ _ . . . .. . . _ . - - . - -

i .

t I l

3.0 OPERATING DATA STATISTICS l l' 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE

]

DOCKET No. 050-249 l DATE MARCH 4, 1997 l COMPLETED BY G. A. ABRELL i l TELEPHONE (815) 942-2920 OPERATING STATUS i l

1. REPORTING PERIOD: FEBRUARY 1997 l
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 i MAXIMUM DEPENDABLE CAPACITY (MWe Net): 773 DESIGN ELECTRICAL RATING (MWe Net): 794 j 3. POWER LEVEL TO WHICH RESTRICTED: No restriction

! 4. REASONS FOR RESTRICTIONS (IF ANY) : See Section 2.2 of this report.

REPORTING PERIOD DATA l PARAMETER THIS MONTH YEAR TO DATE CUMULATIVE HOURS IN PERIOD 672 1,416 222,072 TIME REACTOR CRITICAL 672 720.8 156,578 TIME REACTOR RESERVE SHUTDOWN (Hours) 0.0 0 0 TIME GENERATOR ON-LINE (Hours) 672 682 149,206 TIME GENERATOR RESERVE SHUTDOWN (Hours) 0.0 0 0 THERMAL ENERGY GENERATED (MWHt Gross) 1,176,729 1,178,365 311,390,842 ELECTRICAL ENERGY GENERATED (MWEHe Gross) 379,258 380,578 99,653,719 ELECTRICAL ENERGY GENERATED (MWEHe Net) 362,726 358,078 94,440,579 REACTOR SERVICE FACTOR (%) 100.0% 50.9% 70.5%

REACTOR AVAILABILITY FACTOR (%) 100.0% 50.9% 70.5%

GENERATOR SERVICE FACTOR (%) 100.0% 48.2% 67.2%

GENERATOR AVAILABLILITY FACTOR (%) 100.0% 48.2% 67.2%

CAPACITY FACTOR (Using DCD Net) (%) 69.9% 32.8% 55.1%

CAPACITY FACTOR (Using DER Net) (%) 68.0% 31.8% 53.6%

EURCED OUTAGE FACTOR (%) 0.0% 51.8% 14.4T

20. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS: March 29, 1997 for D3R14.
21. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 7

L:\8360\B301\ MISC \97\97020601.GA  !

l t  !

l 3.3 AVERAGE DAILY UNIT 2 POWER LEVEL DOCKET No. 050-237 UNIT Dresden 2 l DATE MARCH 4, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 MONTH: February-97 DRESDEN 2 DAY AVERAGE DAILY NET DAY AVERAGE DAILY NET POWER LEVEL (MWe) POWER LEVEL (MWe) 1 724 17 735 2 791 18 782 l 3 739 19 787 4 789 20 787 j 5 788 21 786 I 6 787 22 774 7

789 23 783 j 8 548 24 785 9 535 25 785 10 534 26 787 11 535 27 779 12 558 28 716 13 684 14 621 15 273 16 414 l (Note: negative values represent station loads) 8 Li\8360\8301\ MISC \97\97020601.GA

3.4 AVERAGE DAILY UNIT 3 POWER LEVEL DOCKET No. 050-249 ,

UNIT Dresden 3 DATE MARCH 7, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 MONTH: February-97 DRESDEN 3 DAY AVERAGE DAILY NET DAY AVERAGE DAILY NET l POWER LEVEL (MWe) POWER LEVEL (MWe) 1 203 17 560 2 464 18 557 3 518 19 555 4 565 20 550 1 5 570 21 547 6 567 22 546 7 566 23 544 8 568 24 540 l

9 580 25 537 i 10 574 26 538 11 570 27 535 12 567 28 532 13 568 14 568 15 564 l 16 562 (Note: Negative values represent station loads) 9 Li\8360\0301\ MISC \91\'47020601.rA

I i

3.5 UNIT 2 SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH OF FEBRUARY 1997 {

I NO DATE TYPE DURATION REASON METHOD LICENSEE SYSTEM COMPO- CORREC- f (1) (HOURS)* (2) OF EVENT. CODE (4) NENT TIVE F SHUTTINC REPORT # CODE ACTIONS / I DOWN (5) COM- f REACTOR MENTS  !

(3) 1 970208 S O B 4 N/A N/A N/A 2.1 2 970214 S 0 B 4 N/A N/A N/A 2.1 l

t P

Year-to-date forced outage hours = 0  ;

Cumulative forced outage hours = 22,935 TABLE KEY: f (1) (3)  :

F: Forced Method:  !

S: Scheduled 1. Manual i

2. Manual Scram )

(2) 3. Automatic Scram  :

Reason: 4. Other (Explain) j A Equipment Failure (Explain) 5. Load Reduction B Maintenance or Test C Refueling (4)

D Regulatory Restriction Exhibit G Instruction for E Operator Training & Preparation of Data Entry Licensing Exam Sheets for Licensee Event  ;

F Administrative Reports (LER) File i G Operational Error (NUREG-0161) l H Other (Explain)

(5)

Exhibit I Same Source as Above.

10 Li\B360\B301\ MISC \97\97020601.GA

. _ ~ . - . - - . - - - - . . . - - - - . . . - . - .. . . .. .. ~..... . - . .. --

.* . j 1

i . . . '!

) .

\ .

( l

( .,

l. i 3.6 UNIT 3 SHUTDOWNS AND POWER REDUCTIONS

)

REPORT MONTH FEBRUARY 1997 i i

i NO DATE TYPE (1) DURATION PE.ASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CORREC- l

{ HOURS)* SHUTTING EVENT CODE CODE ('s) TIVE DOWN REPORT f (4) ACTIONS /  !

REACTOR COPHENTS  !

(3) i l

l Year-to-date forced outage hours = 734 -

3 Cumulative forced outage hours = 25,810 j i 1 TABLE KEY:

l I

I

l. -(1) (3)

F: Forced Method: I S: Scheduled 1. Manual )

2. Manual Scram 1 (2) 3. Automatic Scram l Reason: 4. Other (Explain) i A Equipment Failure 5. Load Reduction _;

(Explain) l B Maintenance or Test (4) l C Refueling Exhibit G Instruction for  !

l' D Regulatory Restriction Preparation of Data Entry )

E Operator Training & Sheets for Licensee Event Licensing Exam Reports (LER) File F Administrative (NUREG-0161)

G Operational Error H Other (Explain) (5)

Exhibit I Same Source as Above.

I

~

L L

l 11 L:\8360\B301\ MISC \97\97020601.GA I

i

o 4.0 UNIQUE REPORTING REQUIREMENTS 4.1 MAIN STEAM RELIEF AND/OR SAFETY VALVE' OPERATIONS - UNIT 2 AND UNIT 3 i None  !

j 4 . 2. OFF-SITE DOSE CALCULATION MANUAL (ODCM) CHANGES None l l

4.3 MAJOR CHANGES TO THE RADIOACTIVE WASTE TREATMENT SYSTEMS 1

l None 1 4.4 FAILED FUEL ELEMENT INDICATIONS <

-4.4.1 Unit 2 Unit 2 has no indications of fuel failures.

4.4.2 Unit 3 Unit 3 Previous operation indicated a single fuel rod failure. i 5.0 TECHNICAL SPECIFICATION AMENDMENTS 5.1 Amendments to Facility License or Technical Specifications implemented during February 1997.  ;

l None i

i 12 Li\8360\9301\ MISC \97\91020601.GA