ML20136D862

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-456/97-03 & 50-457/97-03 on 970203-07 & Notice of Violation.First Violation Concerns Four Examples of Failure to Adhere to Procedures & to Adequately Establish Procedures
ML20136D862
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/04/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20136D867 List:
References
NUDOCS 9703130044
Download: ML20136D862 (2)


See also: IR 05000456/1997003

Text

. _. _. _. _ _ _ _ _ . . , . _ . _ , _ _ _ _ . _ . _ . _ . . _ _ _ . _ _ _

'OCO

..

March 4,1997

Mr. H. G. Stanley

'

Site Vice President

Braidwood Nuclear Power Station

Commonwealth Edison Company

R.R. #1, Box 84

Braceville, IL 60407

SUBJECT:

NRC BRAIDWOOD CHEMISTRY INSPECTION REPORTS 50-456/97003

(DRS); 50-457/97003(DRS) AND NOTICE OF VIOLATION

Dear Mr. Stanley:

This refers to the inspection conducted by Mr. S. Orth and Ms. D. Hart of this office which

concluded on February 7,1997. The inspection included a review of authorized activities

for yoer Braidwood Generating Station, Units 1 and 2.

L

The inspection was an examination of activities conducted under your license as they

relate to chemistry, to radiation safety, and to compliance with the Commission's rules

and regulations and with the conditions of your license. The inspection consisted of a

selective examination of procedures and representative records, observations, and

interviews with personnel.

The water chemistry management program was effective in reducing chemical _

contaminants which contribute to primary and secondary system. corrosion and radiological  ;

source term. Chemistry technician analytical technique and knowledge of the chemistry

program were very good. - However, problems were identified in the implementation of the

,

!

laboratory quality control program indicating that oversight in this area was not as

!

effective. in additionia number of problems were identified concoming the lack of

acceptance criteria in quality control procedures and post accident sampling system

surveillances. Although your staff has corrected previously identified post acci6c

sampling system material condition and procedural problems, additional improvements are

needed to correct the remaining problems in these areas as documented in the enclosed

inspection report.  ;

'

- Based on the results of this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice of Violation (Notice). The first

violation concerns four examples of the failure to adhere to procedures and to adequately

establish procedures. The second violation concerns inadequate instructions. In the post

' accident sampling system surveillance procedure.

k{

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. In your response, you should document

the specific actions taken and any additional actions you plan to prevent recurrence. After

reviewing your response to this Notice, including your proposed corrective actions and the

' results of future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC 'ragulatory requirements.

9703130044 970304 lappsppsuuss *-

9< o\

PDR ADOCK 05000456

0 PDR

__ _. . _ _ _ __

.. _._.. -. -. -

. . _ _ _ _ _ __ _

.

,

[ I

j .

&

H. G. Stanley -2-- March 4, 1997

1

In accordance with 10 CFR 2.790 of the NRC'S " Rules of Practice," a copy of this letter

and the snclosures will be placed in the NRC Public Document Room (PDR).

l

Sincerely,

i

4

3 Original Signed by Geoffrey E.. Grant

l Geoffrey E. Grant, Director I

j Division of Reactor Safety

,

Docket Nos. 50-456;50-457

Licensas No. NPF-72; NPF-77

4

} Enclosures: 1. Notice of Violation

! l

4- 2. Inspection Reports 50-456/97003(DRS); 50 457/97003(DRS)

cc w/encIs: T. J. Maiman, Senior Vice President,

,

Nuclear Operations Divi.sion

D. A. Sager, Vice President,

j Generation Support

H. W. Keiser, Chief Nuclear

j Operating Officer

T. Tulon, Station Manager

T. Simpken, Regulatory Assurance I

l Supervisor

q

-

I. Johnson, Acting Nuclear

Regulatory Services Manager

3

Document Control Desk - Licensing

Richard Hubbard

j Nathan Schloss, Economist,

!

Office of the Attorney General ..

State Liaison Officer

l Chairman, Illinois Commerce Commission

Distribution:

i Docket File w/encls Rill PRR w/encls W. L. Axelson, Rlli w/ enc!s

{ PUBLIC IE-01 w/encls SRis, Braidwood, Byron, Enf. Coordinator, Rill w/encls

j OC/LFDCB w/encls Zion w/encls R. A. Capra, NRR w/encls

j DRP w/encls LPM, NRR w/encts CAA1 w/encls

4

DRS w/encls A. B. Beach, Rlli w/encls

,

4

DOCUMENT NAME: G:DRS\ BRA 97003.DRS

' To receive a copy of this document, Indicate in the box: "C" = Copy without

attachment

=

/ enclosure "E" = Copy with attachment / enclosure "N" = No copy ~l

'

OFFICE RIII E RIII r) RIII J RIII l

S0rth:Jp 5F

_

NAME TKozak T M- N hnksburyW m v MLeach/G&# 4

DATE 02/ M. /97 02/ 4 /97 0

02/#8/97 04/ 4 /9{)()

0FFICIAL MCORD C0Plf

.- . ..-