Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Numerous Required Records of Radiation Surveys Were Created Which Were Not Complete & Accurate
ML20136B305
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/02/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20136B139 List:
References
FOIA-96-434 50-267-94-03, 50-267-94-3, EA-95-110, NUDOCS 9703100235
Download: ML20136B305 (1)


See also: IR 05000267/1994003

Text

. _ . _ _ . _ _ _ . . _ . . _ _ . _ _ _ _ _ _ _ _ _ _ . . . _ . . _ . _ _ . _ _ _ _ . _ . _ _ . .

'

,  !

y;

REVISED NOTICE OF VIOLATION

l Public Service Company of Colorado Docket: 50-267

^

<

Fort St. Vrain Nuclear Generating Station License: DPR-34

i

i

EA 95-110

During an investigation conducted on behalf of the licensee, and subsequently

confirmed by investigations conducted by the NRC's Office of Investigations,

4

violations of NRC requirements were identified. In accordance with the

" General Statement of Policy and Procedures for NRC Enforcement Actions,"

i NUREG-1600, the violations are set forth below:

l

] 10 CFR 50.9 requires, in part, that information required to be

maintained by the licensee shall be complete and accurate in all
  • material respects.

i

Contrary to the above, in February, March, and September 1993, numerous

s' required records of radiation surveys were created which were not

complete and accurate in all material respects. Specifically, during

February and March, 1993, 14 records which were required to support the

release of material from the facility, and 20 records, which were

} required to support work conducted under various radiation work permits

! contained false information regarding survey instrument usage and

i' calibration dates. In September 1993, a survey record supporting

4 release of the hot service facility plug was created to indicate that

the survey had been completed when in fact it had not. These records

'

were material to the NRC because they were required to ensure compliance

with the regulations in 10 CFR Part 20. (01013)

This is a Severity Level III violation (Supplement VII).

The NRC has concluded that information regarding the reason for the violation,

the corrective actions taken and planned to correct the violation and prevent

recurrence, and the date when full compliance was achieved, is already

adequately addressed on the docket in your letter dated November 29, 1995.

However, you are required to submit a written statement or explanation

pursuant to 10 CFR 2.201 if the description therein does not accurately

reflect your corrective actions or your position. In that case, or if you

choose to respond, clearly mark your response as a " Reply to a Notice of

Violation," and send it to the U.S. Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington,'D.C. 20555 with a copy to the j

Regional Administrator, Region IV, and a copy to the NRC Resident Inspector at

the facility that is the subject of this Notice, within 30 days of the date of

the letter transmitting this Notice of Violation (Notice).

S.

Dated at Arlington, Texas,

this 2nd day of April 1996

.

9703100235 970228

PDR FOIA -

SAUR096-434 PDR

.-. - - - .-