ML20135H762

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-456/85-42,50-457/85-41 & 30-17035/85-01 on 850819-23.No Noncompliance Noted
ML20135H762
Person / Time
Site: Braidwood, 03017035
Issue date: 09/17/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20135H763 List:
References
NUDOCS 8509240205
Download: ML20135H762 (2)


See also: IR 05000456/1985042

Text

f .

.

SEP 17 1985

Docket No. 50-456

Docket No. 50-457

Docket No. 30-17035

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. B. Grant of

this office on August 19-23, 1985, of activities at Braidwood Nuclear Power

Station, Units 1 and 2 authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and Byproduct Material License No. 12-05650-17 and-to the discussion

of our findings with Mr. J. Gudac at. the conclusion of the inspection.

~

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

~

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC'_s Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

' Original signed by W.D. Shafer*

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Report

No. 50-456-85042(DRSS);

No. 50-457/85041IDRSS);

No. 30-17035/85001(DRSS)

Ob

4e

See Attached List For Distribution .

I

kDR9240205 850917 ,

' ) f

G ADOCK 05000456 i

PDR

. .

Commonwealth Edision Company 2

SEP 17 1985

Distribution

cc w/ enclosure:

- D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB(RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

-Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Ca11than, ASLB

,

The Honorable Richard F. Cole, ASLB

.

< ,n

i

R RIII,

R}Q RIII RI [

Grant /pg Gr e it Wiedeman j fr

09/13/85

f/7 (

m