PY-CEI-NRR-2147, Forwards Changes to Emergency Plan for Plant Which Constitute Revs,Temporary Changes or Reissued Pages

From kanterella
(Redirected from ML20135F376)
Jump to navigation Jump to search
Forwards Changes to Emergency Plan for Plant Which Constitute Revs,Temporary Changes or Reissued Pages
ML20135F376
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/03/1997
From: Myers L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135F381 List:
References
PY-CEI-NRR-2147, NUDOCS 9703120171
Download: ML20135F376 (3)


Text

.-. . .- .- - - . _ .

s GNTERDOR ENERGY Power Generation Group Perry Nuctaar Power Plant Mail Address: 218-280 4915 Lew W. Myers 10 Center Road RO. Box 97 FAX: 216-280 8029 Vee Presdent Perry, ONo 44081 Perry, OH 44081 March 3, 1997 PY-CET/NRR-2147L

i. j United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant

. Docket Nos. 50-440; 50-441 Emergency Plan Ladies and Gentlemen:

Pursuant to 10CFR50.54 (q) , enclosed are changes to the Emergency Plan for the Perry Nuclear Power Plant (PNPP). These changes constitute revisions, temporary changes, or reissued pages. Please follow the updating instructions per the attached Controlled Document Instruction Sheet and return the signed Acknowledgment of Receipt form.

The changes have been reviewed in accordance with 10CFR50.54 (q) and it has been determined that the changes do not decrease the effectiveness of the Emergency Plan. It has also been determined that the Plan, as changed, continues to meet the standards of 10CFR50.47 (b) and 100FR50 Appendix E.

If you have questions or require additional information, please contact Mr. Marcus J. Roseum, Supervisor - Emergency Planning Unit, at (216) 280-5030.

Very truly yours, l

r TLF sc / /

Enclosure cc: NRC Project Manager NRC Resident Inspector NRC Region III, Incident Response Center w/2 attachments 9703120171 970303 PDR ADOCK 05000440 F PDR h@ ....

J

s I

THE CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT UNIT 1 & 2 I

i ACKNOVLEDGMENT OF RECEIPT l l

1 Title Emergency Plan Implementing Instructions I EPI-Al / REV.5 / PIC-2, EPI-A8 / REV.9, EPI-B1 / REV.9 / PIC-3, l

EPI-C1 / REV.5, EPI-C2 / REV.7, EPI-C5 / REV.1 i i

control No. 60 l Letter No./Date PY-CEI/NRR-2147L / March 3, 1997 Signature Date Title l

1 l

l Return to:

Perry Nuclear Power Plant Attn T. L. Francis PTC P. O. Box 97 Perry, Ohio 44081 4

I

7 l

The Cleveland Electric Illuminating Company 1 Perry Nuclear Power Plant 1

Controlled Document Instruction Sheet 1 Manual: Emergency Plan Implementing Instruction

' l Control Number 60  ;

Revision Temporary Number Change No. Insert Remove 5 2 EPI-Al / REV.5 / PIC-2 1, iv, 17, 20, 21 1, iv, 17, 20, 21, 30, 21, 30, 31, 32, 41, 31, 32, 41, 43, 52, 54, 41, 43, 52, 54, 71, 71, 72, 74. 72, 74.

9 EPI-A8 / REV.9 9, 10, 21, 22.

9, 10, 21, 22.

9 3 EPI-B1 / REV. 9 / PIC-3 All existing REV's and all TC's 5 Cancellation form vitb EPI-C1 / REV.5 revised Table of Discard existing REV's l contents. and all TC's. l l

7 Cancellation form with EPI-C2 / REV.7 revised Table of Discard existing REV's  ;

Contents. and all TC's. l 1 Cancellation form with EPI-C5 / REV.1 revised Table of Discard existin, REV's Contents. and all TC's.