BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130

From kanterella
(Redirected from ML20135A448)
Jump to navigation Jump to search
Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130
ML20135A448
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/27/1996
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-96-151, NUDOCS 9612030225
Download: ML20135A448 (1)


Text

. -. . . _ , ,- - ~. . .- ..

VER'MONT YANKEE NUCLEAR POWER CORPORATION

. /

l 3 Ferry Road, Brattleboro, VT 05301-7002 -

y ,,,, , o ENGINEERING OFFICE

. 580 MAIN STREET j BOLTON, MA 01740 j (508)779-6711 1 November 27,1996 BVY 96-151 United States Nuclear Regulatory Commission i ATTN: Document Control Desk Washington, DC 20555

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, VYNPC to USNRC, BVY 96-115, dated October 10,1996 (c) Letter, VYNPC to USNRC, BVY 96-117, dated October 8,1996 I

Subject:

Revised Schedule for Installing improved Fire Protection System ,

in References (b) and (c) Vermont Yankee reported details of the Switchgear Room CO2 System modifications being performed at the Vermont Yankee Nuclear Power Station and l informed the NRC that these modifications would be completed by November 30,1996. The  !

purpose of this letter is to inform the NRC of a revision of Vermont Yankee's schedule for completing these CO2 system modifications.

, Although the majority of the new system will be installed by the previously reported date of l November 30,1996, additional time is' required to incorporate new design features initiated during the design review process. Therefore, we now expect to complete system installation by December 31,1996. Following installation, the new CO2 system will be tested to verify proper operation, prior to declaring the new system functional.

We trust that the information provided is acceptable; however, should you have any questions or require additional information, please contact this office.

Sincerely, l VERMONT YANKEE NUCLEAR POWER CORPORATION f

mof& f James J. Duffy Licensing Engineer

' l c: USNRC Region i Administrator b O J  !

. USNRC Resident inspector -VYNPS

! USNRC Project Manager - VYNPS 9612030225 961127 PDR ADOCK 05000271 F PDR