Responds to Notice of Exercise Weakness in Insp Rept 50-160/96-05.Corrective Actions:Will Conduct Emergency Drills & Will Conduct Addl Table Top Exercises
ML20134L306
Person / Time
Site: Neely Research Reactor
Issue date: 02/13/1997
From: Karam R
Neely Research Reactor, ATLANTA, GA
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9702190008
Download: ML20134L306 (5)


Text

_ - . _ A .- ---

Hme.ofIheisOIypicnkge

=

G o Neely Nuclear Research Center h_ -

e00 Atlantic Drive 1

echa@.@gy Atlanta, Georgia 30332-0425

<404>-ee4 2e00 eex: <404>-ee4-e325

=

February 13,1997 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Subject:

Georgia institute of Technology License No. R97.

Docket No. 50-160 Replay to Notification of Exercise Weakness inspection Report No. 50-160/96-05 Ladies and Gentlemen, Pursuant to the 10 CFR 2.204 please find Attachment I- A Response to Exercise l Weakness, inspection Report No. 50-160/96-05. Should you have any questions, please l call me at 404-894-3620.

Sincerely, A(COULA R.A. Karam, Director Neely Nuclear Research Center RAK/ars cc: Mr. Luis A. Reyes, Region 11 jh)D Jltfo

.180074 9702190008 970213 PDR ADOCK 05000160 0 PDR A una of the unNersky System of Georgia An Equal Education and Employment Opportunity Institution

i

! - i 4 .

. j l

Attachment i Georgia Institute of Technology Reply to Notice of Exercise Weakness, inspection Report  !

No. 50-160/96-05.  !

Exercise Weakness as Reported in Inspection Report No. 50-160/96-05. f

a. Inspection Scope Section 10.2 of the licensee's Emergency Plan required that annually drills be .

conducted to test the adequacy of emergency procedures and to ensure that i emergency organization' personnel are familiar with their. duties. Further, the Emergency Plan required that at least biennially, drills contain provisions for {

coordination with local offsite emergency organizations for testing communications  !

and notification procedures. The inspector observed the annual exercise l

conducted on November 26,1996, i

b. Observations and Findinas i The scenario was reviewed in advance of the exercise and was discussed with l licensee representatives prior to the exercise. No major problems were identified during the review, but inconsistencies became apparent during the exercise. The j inconsistencies failed to detract from the overall performance of the licensee's i emergency organization.  !

i l

The exercise involved full padicipation by the Georgia Department of Natural  !

Resources / Environmental Protection Division (DNR/EPD), and GTP. Participation j by the Atlanta /Fulton County Emergency Management Agency (A/ FEMA) and j Georgia Emergency Management Agency (GEMA) was limited to communications l only. The simulated accident conditions commenced at 9:00 a.m. and terminated i at 11:15 a.m. The scenario postulated a tornado in the vicinity of the NNRC ]

causing a loss of electrical power and damage to a structure used for storage of I low-level radioactive waste. The inspector observed the licensee's actions in the following areas:

ECC activation and operation Notification and communication with offsite authorities Interface between the alternate ED and response personnel (DNR/EPD and GTP)

Facility assembly and accountability On-scene response by health physics personnel 4

_.. _ . _ _ _ ~ . - . _ _ _ _ _ _ . - _ . _ _ _ _ _ _ _ _ _ . _ _ . _

~

i c Event recognition and classification In response to the GTP report of a tornado warning due to a tornado sighted one  !

mile WNW of NNRC and moving toward the NNRC, a building PA announcement was made asking personnel to relocate to the basement. Facility staff were directed to the rear of the ECC for assembly and accountability. Accountability  ;

was completed within approximately twelve (12) minutes of the announcement to I relocate. The deployment of a search team for a missing faculty member followed l by a damage assessment team to assess the impact of the tornado on the facility l was both timely and appropriate. However, the inspector. noted that the ]

emergency classification by the alternate ED was both delayed and incorrect '

based on postulated conditions as follows (approximate timeline and events):

9:03 a.m. Message card two issued ' indicating the GTP reported a tornado had been sighted one mile WNW of NNRC and moving toward NNRC

' 9:10 a.m. Message card three issued to the alternate ED indicating that i the tornado had passed the NNRC and all electrical power  ;

was lost (lights were switched off to add realism) )

i 9:14 a.m. Message card four issued to the alternate ED indicating that f the assessment team reported no damage.to reactor, hot  !

cell, or NNRC; containment integrity could be effected  !

9:18 a.m. Team two reported damage to the barn (low-level radioactive l waste storage) and possible spread to contaminated material i 9:32 a.m. Assessment team reported to ECC that contaminated l paper ,

and gloves located outside the site boundary l 9:53 a.m. Alternate ED considering an Alert emergency classification based on radiation levels greater than 20 millirem / hour at site boundary  ;

9:57 a.m. Offsite notifications (State / local /NRC) initiated regarding the Alert classification based on radiation levels of 38 millirem / hour 10:00 a.m.- Controller informed the alternate ED of error in reviewing rad 3 data as millirem rather than microrem  !

10:02 a.m. Alternate _ ED reassessed emergency action levels based on radiation data and determined the event should be downgraded to a NOUE i

l

Offsite notifications were initiated to indicate that, due to an  ;

error in radiation levels reported earlier, rather than an Alert, a NOUE was declared based on offsite contamination. ]

The event declaration (9:53 a.m.) was delayed more than 30 minutes after the l t'

conditions were met (9:14 a.m.) for the NOUE Emergency Action Level (EAL) in )

. 5.9.5 of EP 6100 (Rev. 6) and Table I of the Plan. In addition, the decision to'  !

declare an Alert was incorrect due to misinterpretation. of radiological units i (millirem rather than microrem). Further, the basis for the NOUE at 10:02 a.m. l 5 was not consistent with the EALs in the Plan or EP 6100 in that offsite

contamination is not included _as an EAL. The inspector indicated that an exercise weakness (EW) was identified for failure classify the event timely and correctly in

, accordance with the Plan and implementing procedures.-

! EW 50-160/96-05-01: Failure to classify the event in a timely manner'and in

accordance with the Plan and implementing procedures.

The inspector observed that notification procedures were implemented in accordance with EP 6100 " Emergency Notification." However, the lack of a -

standard message notification form resulted in insufficient details being provided to offsite authorities during the initial message (e.g. event status, assistance needed,'etc.) to assist authorities in assessing conditions (e.g. travel directions, equipment / personnel resources). The inspector noted examples where the alternate ED appeared to lack command and control over the response:

On arrival, State personnel directed areas for conducting rad surveys and i assessment rather than the alternate ED directing State resources as the  !

ED desired. I Accident assessment did not take into consideration means to protect the barn or prevent additional material from being dispersed. l Noise levels within the ECC by the facility staff at times was excessive.

  • - Following the loss of power, the alternate ED was observed struggling to operate a flash light while making _offsite notifications, when numerous resources were available in the ECC to assist with light and/or phone calls."

' "Other observations that were discussed with the licensee included:

During early stages of drill, players failed to preface communications (particularly two-way radio) with "this is a drill."

There was excessive prompting and exercise control problems by controller organization.

. 4 1

There was ineffective use of personnel resources within the ECC by the alternate ED. ,

in response to the inspector's comments regarding the lack of command and control by the alternate ED, the facility Director attributed the lack of experience as the basis for the performance. The facility. Director discussed conducted additional training including a table-top drill for the alternate ED to provide the necessary experience. Whea questioned regarding the date for such training, the l inspector was informed that such training would be completed pending decisions  ;

by the University President regarding continued operations of the NNRC. The i inspector indicated that the additional training and table-top drill for the alternate  ;

ED was considered an Inspector Followup Item (IFI).

IFl 50-160/96-05-02: Provide additional training including table-top dri'l for .

personnel designated as alternate ED.

)

At the conclusion of the exercise, the licensee conducted a critique that included I participants from onsite and offsite organizations. Offsite participants provided l good candid assessments regarding exercise play and desire to be involved in ' '

early stages of planning and scenario development.

c. Conclusions The licensee's performance to protect the health and safety of facility staff, and students was adequate. Exercise control and excessive prompting by the controller organization continue to pose a challenge for the licensee.

REPLY l The objectives for the Nov. 26,1996 Emergency Drill were described in the Emergency Drill scenario as follows:

1. To test the NNRC Emergency Organization's response to a "NOUE" emergency event;
2. To demonstrate a new Emergency Director's ability to handle an emergency situation:
3. To demonstrate that NNRC personnel are trained properly and can respond appropriately to an emergency situation;
4. To demonstrate that emergency procedures are adequate and can be followed; I

I I

l

' j

5. To demonstrate that emergency communications systems are functional, i and  ;
6. To use the emergency communication system in summoning help from the
State of Georgia.

Emergency Drills or any drills are usually conducted for the purpose of teaching and/or testing or measuring the level of skill acquired in performing a required function.

. The Emergency Preparednesh Plan states in paragraph 10.2.

"Onsite emergency drills will be conducted annually to test the adequacy of emergency procedures and to ensure that emergency organization personnel are familiar with their duties."

The drill of Nov. 26, 1996 did indicate clearly that the alternate Emergency Director " trainee" needed additional training in recognizing that "he" is in charge and that he must command and control completely the Emergency situation. To that end, Management of NNRC promise to conduct additional " Table Top" exercises so that all alternate Emergency jirectors have better understanding of their responsibilities as

, emergency directors. This promise is contingent however upon decision by the President of the Institute to continue ~ reactor operation. The President's decision on i continued operationls expected in mid to late March 1997. Should the decision to continue operation be made by the President, the retraining of NNRC staff in emergency control will start immediately thereafter and will be concluded by December 1,1997.

We further recognize that timely classification of an Emergency is important and that additional training on this matter is essential. Additional training on this issue will also be completed Dec.1,1997.

NNRC management also recognizes that an Event information worksheet tailored to GTRR operations and GTRR potential emergencies is beneficial. Such a worksheet will be developed and instituted by the Dec.1,1997 deadline.