ML20134K990

From kanterella
Jump to navigation Jump to search
Revises TS Change 96-01,rev 1, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SR
ML20134K990
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/07/1997
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134K993 List:
References
TVA-SQN-TS-96, TVA-SQN-TS-96-0, NUDOCS 9702180106
Download: ML20134K990 (3)


Text

h =

s \

l Rh I l

Tennessee Valley Authority, Post Off ce Box 2000, Soddy-Daisy Tennessee 37379-2000 s February 7,1997 TVA-SON-TS-96-01, Revision 1 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 I

Gentlemen: '

in the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 l SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 96-01, REVISION 1, " CONVERSION FROM WESTINGHOUSE ELECTRIC I C%t ORATION FUEL TO FRAMATOME COGEMA FUEL (FCF) (MARK-BW17)"

Reference:

TVA letter to NRC dated April 4,1996, "Sequoyah Nucte::r Plant (SON) - Technical Specification Change 96-01, " Conversion from Westinghouse Electric Corporation Fuel to Framatome Cogema Fuel (FCF) (MARK-BW17)""

The purpose of this letter is to revise the referenced TS change request that was submitted in accordance with 10 CFR 50.90. This is a revision to the requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2.

The referenced change revises the appropriate specifications, surveillances, and bases to allow for the conversion from Westinghouse fuel to FCF. This revision is required to ensure that the core analysis computer code output actions are consistent with het channel factor surveillance requirements.

The revised TS pues are provided in Enclosure 1. The justification for the proposed revision is provided in Enclosure 2. The previous determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 that was provided in the referenced letter is still applicable to this revision without change. A revised page to the draft Core Operating Limits Report is contained in Enclosure 3. Portions of the referenced TS change request not affected by the aNtions provided in this revision remain valid based on the original justifications. The proposed additions in this revision are bounded by the original justifications for this fuel conversion request.

9702180106 970207 I PDR ADOCK 05000327 P PDR )

180041

)

. . _ _ _ . . ~ . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . . -_ -

e . _ _ . _ _ . _ _ .. !

  • l

, o U.S. Nuclear Regulatory Commission i- Page 3 '

February 7,'1997  ;

' i (Enclosures): '

Mr. R. W. Hernan, Project Manager '

Nuclear Regulatory Cornmission  ;
One White Flint, North  !

4 11555 Rockville Pike  !

Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures) i Division of Radiological Health  ;

3rd Floor i L & C Annex  !

l 401 Church Street J

! Nashville, Tennessee 37243-1532 i I i NRC Resident inspector  ;

Sequoyah Nuclear Plant ]

2600 Igou Ferry Road I Soddy-Daisy, Tennessee 37379-3624 l I

D Regional Administrator i U.S. Nuclear Regulatory Cornmission I Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l

I I

4

'o l U.S. Nuclear Regulatory Commission Page 2

. February 7,1997 As has >een previously discussed with NRC, TVA will convert to FCF fuel assemblies l beginning with each unit's Cycle 9 core. The Unit 1 Cycle 8 refueling outage is l currently scheduled to begin in late March 1997 and receipt of the Unit 1 approved change is needed prior to this date to support the cutage. The Unit 2 Cycle 8 refueling outage is presently scheduled to begin in early October 1997.Therefore,it is requested that the implementation of each unit's TSs be required prior to start-up from each unit's respective Cycle 8 refueling outage.

Please direct questions concerning this issue to Keith Weller at (423) 843-7527' Sincerely, .

1 i R. H. Shell Site Licensing and Industry Affairs Manager Sworn to and subscribed before me tnis 7 4 day of 8;Ahua>- 1997 uAJ .

Al )

/0 Notary Public My Commission Expires Af. S/; /99P Enclosures