ML20134J834

From kanterella
Jump to navigation Jump to search
Informs NRC That SCE Will Perform Actions & Provide Info as Requested by GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related MOVs.317
ML20134J834
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/14/1996
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, GL-96-05, GL-96-5, NUDOCS 9611180085
Download: ML20134J834 (1)


Text

4 2'. r

[2' Southem Califomla Edison Company P. O. BOX 128 SAN CLEMENTE. CALIFORNIA 92874 4 128  ;

November 14, 1996 __

u.n ,N Enny A@g OpsOf'HE NU(RE AM GENE HAtlNG STATION U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Response to Generic Letter 96-05: " Periodic Verification of Design-Basis Capability of Safety-Related Motor-0perated Valves" J San Onofre Nuclear Generating Station Units 2 and 3

Reference:

. Generic Letter 96-05: " Periodic Verification of Design-Basis Capability of Safety-Related Motor-0perated Valves" i i

This letter is to notify.the NRC that Southern California Edison (Edison) will erform the actions and arovide the information as requested by Generic Letter p(GL) 96-05. Edison esta)lished a Motor-0perated Valve (MOV) periodic verification program in response to GL 89-10. Edison will review the current M0V. verification program to determine if any changes are appropriate based on GL 96-05 and will submit a written summary description of the MOV periodic verification program by March 17, 1997.

This letter meets the 60 day response required by GL 96-05. Please let me i know if you have any additional questions. l Very truly yours,

, \

x l

- l Enclosure cc: .L. J. Callan, Regional Administrator, NRC Region IV

'J. E. Dyer, Director, Division of Reactor Projects, Region IV

. K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3

.M. .

B. Fields, NRC Project Manager, San Onofre Units 2 and 3

['p l ,

j i

9611180085 961114 PDR ADOCK 05000361 P PDR t