Advises of Planned Insp Resulting from Plant Performance Review.Insp Plan for Next 6 Months Encl
ML20134J827
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/07/1996
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccoy C
GEORGIA POWER CO.
References
NUDOCS 9611180083
Download: ML20134J827 (6)


Text

u Nowsnber 7,1996 Georgia Power Company ATTN: Mr.. C. K. McCoy Vice President

! Vogtle Electric Generating Plant P. O. Box 1295 Birmingham. AL 35201 l

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - V0GTLE On October 1.1996, the regional staff completed the semiannual Plant Performance Review (PPR) of Vogtle. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Vogtle involved the participation of all technical divisions in evaluating inspection results

~and safety performance.information for the period from March 1996 through

! August 1996. PPRs provide regional management with a current summary of

! -licensee 3erformance and serve as inputs to the NRC Systematic Assessment of l Licensee 3erformance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Vogtle PPR review. It is provided in an attempt to minimize the resource impact on your. staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near term inspections.

Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for em)hasis in the.se program areas. Resident inspections are not listed due to t1eir ongoing and continuous nature, nor are l Region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences -due-to training.

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Re) ort (UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to~ tie inspection activities will be reviewed and verification made

, that the UFSAR commitments have been properly implemented into plant l practices, procedures and/or parameters.

l l

150071

, 9611100083 961107 j PDR ADOCK 05000424 G PDR h gg

GPC 2 We will inform you of any changes to the inspection plan. If you have any questions, please contact P. H. Skinner at (404) 331-6299.

Sincerely.

(Original signed by Pierce H. Skinner)

Pierce H. Skinner. Chief  ;

Reactor Projects Branch 2  !

Division of Reactor Projects Docket Nos. 50-424, 50-425 License Nos. NPF-68. NPF-81

)

Enclosure:

Inspection Plan l cc w/ encl:

J. D. Woodard l Senior Vice President i Georgia Power Company P. O. Box 1295 Birmingham AL 35201 J. B. Beasley General Manager. Plant Vogtle Georgia Power Company i P. O. Box 1600 Waynesboro GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. O. Box 1295 Birmingham. AL 35201 Jim Hurt. Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King. Jr. Drive Plaza Level - East: Suite 356 Atlanta, GA 30334-4600 Office of Planning and Budget Room 6158 270 Washington Street. SW

! Atlanta, GA 30334 cc w/encls cont'd: (See page 3) i

V 1 l

GPC 3

- cc w/encls: Cont'd

- Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Harold Reheis, Director Department of Natural Resources 205 Butler. Street, SE. Suite 1252

- Atlanta .GA 30334 Thomas Hill. Manager Radioacti've Materials Program l Department of Natural Resources 4244 International Parkway _. 1

- Suite 114 i Atlanta, GA 30354 '

. Attorney General .

Law Department i 132 Judicial Building  !

Atlanta, GA 30334 Thomas P. Mozingo Manager of Nuclear Operations

. Oglethor)e Power Corporation 2100 E. Exchange Place =

Tucker -GA 30085-1349-

' Charles 'A. Patrizia. Esq. I Paul, Hastings, Janofsky & Walker i

10th Floor-

'1299 Pennsylvania Avenue l Washington, D. C. 20004-9500 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority ,

of Georgia i 1470 Riveredge Parkway NW Atlanta GA 30328-4684  ;

Distribution w/ enc 1: i P. Skinner. RII L

l R. Wright, RII

- W. P._'Kleinsorge. RII

M. E. Ernstes, RII

< -G. Hallstrom RII.

. L. Wheeler. NRR-PUBLIC t

Distribution w/encls, cont'd: (See Page 4) i

) ,

~

GPC 4 Distribution w/encls: Cont'd NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission 8805 River Road Waynesboro. GA 30830 I

1 l

I i

i 1

l l

I SEND TO PUBL10 DOCUMENT POOMS [ lYES NO OFFICE RII:DRP RI h RII:DRS:EB RII:DRSMB RII:DRS: SIB RII:DRS:PSB SIGNATURE NAME RMgf RWWright:dka kinner C1p p CCasto HChristensen Q

Pfredrickson n

hr DATE 10 / % c / 96 h/96 1) / ,3 / 96 / 96 IQ,,/ / 96 10 / N / 96 COPY? h) NO /IES) NO lYG NO /.ES/ NO [ES} NO [Y[M NO v v -

- I SEND TO PUBtiC 00CtMENT ROOM' YES NO OFFICE RII:DRS:0LHP \11:DRP S!GNATURE NAME TP EWMers off DATE 10 / uD/ 96 10 / \% 10 / / 96 10 / / 96 10 / / 96 10 / /%

COPY? YES '% YES NO\ YES NO YES NO YES NO YES NO UtFILIAL KtLUKU LW) UULUMLNI NAM;. A;W LLilLK FFR '

l I

V0GTLE INSPECTION PLAN INSPECTION TITLE / PROGRAM AREA NUM ER OF PLANNED TYPE OF INSPECTION - BASIS PROCEDURE / INSPECTORS INSPECTION TENPORARY- DATES INSTRUCTION IP 57080 NDE Procedure UT Examination 1 10/03/96 Regional Initiative - Reactor

[ MAINTENANCE - SI] Vessel Upper Internal Split Pin Failure IP 82301 Evaluation of Exercises for. 1 11/20/96 Core Inspection Power Reactors IP 82302 Exercise Objectives & 1- 11/20/96 Core Inspection Scenarios

[ PLANT SUPPORT - PS]

IP 62700 Maintenance Implementation 1 Regional Initiative -

[ MAINTENANCE - MNT] 12/16/96 Maintenance and Testing of Safe Shutdown Panel IP 52002 Digital Retrofits Not 2 01/13/97 NRR Initiative - Digital Receiving Prior. Approval Modification Inspection

[NRR - TWO I&C Personnel]

IP 62700 Maintenance Implementation 1 12/09/96 Regional Initiative'- Debris

[ MAINTENANCE'- MNT] in NSCW System. NSCW flow measurements. FME IP 84750- Rad Waste Systems. Water' 1 02/10/97 Core Inspection Chemistry. & Envir. Monitoring IP 86750 Rad Waste Management & Transp.

TI 133 Rad Waste Combine with 86750

[ PLANT SUPPORT - PS]

IP 82701 Op. Status of EP Program 1 02/10/97 Core Inspection

[ PLANT SUPPORT - PS]

V0GTLE INSPECTION PLAN IP 64704 Fire Protection Program 1 02/10/97 Core Inspection

[ PLANT SUPPORT - SI]

IP 81700 Security Program for RXs 1 03/03/97 Core Inspection

[ PLANT SUPPORT - SI]