HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2

From kanterella
(Redirected from ML20134G842)
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2
ML20134G842
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/31/1996
From: Beckham J, Shannon Rogers
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5265, NUDOCS 9611130388
Download: ML20134G842 (11)


Text

-- . . . . - - . - - - . - =

= Georgia Power Company 40 invemess Center Parkway Post Office Box 1295 l Birmingham. A!abama 35201 l Telephone (205) 877 7279

)

ice es den - Juclear GeorgiaPower Hatch Project November 7, 1996

,3y3,gy,y gf Docket Nos. 50-321 * * "#""*

50-366 HL-5265 U. S. Nuclear Regulatory Cemmission '

ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Monthly Operatine Reports Gentlemen:

1 Enclosed are the October 1996 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, DocktJ No. 50-366. These reports are l

submitted in accordance with Technical Specifications requirements.

Sincerely,

/

fk

. T. Beckham, Jr.

SMS/id l

Enclosures:

)

1. October Monthly Operating Report for Plant Hatch Unit 1 l
2. October Monthly Operating Report for Plant Hatch Unit 2 l.

cc: Georgia Power Company i Mr. H. L. Sumner, Nuclear Plant General Manager NORMS U. S. Nuclear Regulatorv Commission. Washington D. C. l .

l Mr. K. Jabbour U. S. Nuclear Regulatorv Commission. Rezion 11 1,IL '{ki Mr. S. D. Ebneter, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch Utility Data Institute. Inc.

! Mr. Fred Yost, Director - Research Services

! 1 m, . ,

96111003;38 961031 PDR ADCCK 05000321 R PDR

Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report October 1996 1 I

Table of Contents 1

EA%t Narrative Report El-1 l

\ l j Operating Data Report El-2 Average Daily Power Level El-3 ,

l Unit Shutdowns and Power Reductions El-4 l

i i i

\

l t

l.

I l l

l

l l

l PLANT E.1. HATCH - UNIT ONE DOCKET NO.: 50-321 l DATE: NOVEMBER 5,1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OCTOBER 1 0000 Shift continued to maintain rated thermal power. i OCTOBER 4 2130 Shift began reducing load to approximately 805 GMWe to perform i a Rod Pattern Adjustment, Control Rod Drive Exercises on i l selected control rod drives, and Turbine Stop Valve and Bypass Valve Testing.

l OCTOBER 4 2330 Shift began ascension to rated thermal power.

OCTOBER 4 2345 The unit attained ated thermal power. I OCTOBER 5 0718 The unit experienced a partialloss of feedwater heating upon l

inadvertent isolation of extraction steam to the 8th Stage "A",

7th Stage "A", and 5th Stage "A" Feedwater Heaters.

OCTOBER 5 0720 Shift began reducing load to approximately 600 GMWe in response to the partial loss of feedwater heatr g.

OCTOBER 5 1230 All feedwater heaters were returned to service. Investigation revealed that the partial loss of feedwater heating was caused by a faulty control switch which resulted in closure of the 8th Stage "A" to 10th Stage "A" Feedwater Heater Low Level Dump Isolation Valve.

OCTOBER 5 1345 Shift began ascension to rated thermal power.

OCTOBER 5 1805 The unit attained rated thermal power.

OCTOBER 31 2400 Shift continued to maintain rated thermal power.

1 i

l 1

l l

l E1-1 I

t .

l l

OPERATING DATA REPORT DOCKET NO.: 50-321 i

! DATE: NOVEMBER 5,1996 l COMPLETED BY: S. B. ROGERS ,

l TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS  ;

1. UNIT NAME: E. l. HATCH - UNIT ONE
2. REPORT PERIOD: OCTOBER 1996
3. LICENSED THERMAL POWER (MWt): 2558
4. NAMEPLATE RATING (GROSS MWe): 850
5. DESIGN ELECTRICAL RATING (NET MWe): 822.1
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
840
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 805
8. IF CHANGES OCCUR IN CAPACITY RATINGS l (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES l 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS  ;

i

10. REASONS FOR RESTRICTION,IF ANY: N/A 1 i THIS MONTH YEAR-TO-DATE CUMULATIVE i
11. HOURS IN REPORTING PERIOD: 745.0 7320 182639 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 745.0 6367.3 140768.8 i
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l l 14. HOURS GENERATOR ON LINE: 745.0 6203.3 135463.4 l l 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 00 0.0 l
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1899017 14775946 306584713 l 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 622616 4763177 98635509 ,
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 597420 4541812 93905352 1
19. UNIT SERVICE FACTOR: 100.0 % 84.7 % 74.2 %

i 20. UNIT AVAILABILITY FACTOR: 100.0 % 84.7 % 74.2 %

21. UNIT CAPACITY FACTOR (USING MDC NET): 99.6 % 79.0 % 68.7%

' 22. UNIT CAPACITY FACTOR (USING DER NET): 97.5 % 77.2 % 66.0 %

! 23. UNIT FORCED OUTAGE RATE: 0.0% 3.1% 10.3%

! 24. SHUTDOWNS SCHEDULED OVER THE NEXT G MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A l

l i

E1-2 l

. .. _. .- . . . . . . - - ~ - . . . - . . . _ . . . . . . - - . . = - - . _ _ _ _ -

l PLANT E. l. HATCH - UNIT ONE DOCKET NO.: 50-321 l DATE: NOVEMBER 5,1996 ,

l AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS f

) TELEPHONE: (912) 367-7781 x2878 OCTOBER 1996 DAY NetMWe i

1. . 801 l
2. 801
3. .. . . 800
4. . . . 802 '
5. .. 731
6. . . 807
7. . 807 8... . 802 9.. . 803
10. . 807 11...... ... , 808

, 12. . . 807 r l 13. . 808 l 14. . 806 l

15. . 805 >

, 16. . 803 i

17. 803
18. .. . 804 19 . . . . .. 809 l 20 .. 810 21.. . . 808
22. . .. 804 l
23. 804
24. . . 809
25. . 807
26. 800 l 27. . 802
28. . . . 800
29. . . . . . 800
30. . 799 l 31. . . 804 1

2 i

E1-3 l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: NOVEMBER 5,1996 i UNIT NAME: E.1. HATCH - UNIT ONE COMPLETED BY: S. B. ROGERS  !

TELEPHONE: (912) 367-7781 x2878 j REPORT MONTH: OCTOBER 1996 l '

R M S i E E Y t T A T LICENSEE SC I Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE .

P DURATION O O REPORT ED CODE ACTION TO  !

NO. DATE E (HOURS) N D NUMBER I ME (SUBCODE) PREVENT RECURRENCE No significant power reductions occurred this month.

l l

l l

L l

! TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE l A GREATER THAN 20%

F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECED NG 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN) l H-OTHER (EXPLAIN)

E1-4

l .

Enclosure 2 ,

Plant Hatch Unit 2 i Monthly Operating Report l October 1996 l l

Table of Contents Page l

l Narrative Report E2-1 Operating Data Report E2-2 l Average Daily Power Level E2-3 l Unit Shutdowns and Power Reductions E2-4 i

l I

l i

I k

I l

- __. - -,. - .. ,. - . - _ . . - - _ - _ - - . - - . . . - . . - . - . . - - . . - - ~ . . . . _ -

l i PLANT E.1. HATCH - UNIT TWO DOCKET NO.: 50-366 l DATE: NOVEMBER 5,1996  !

NARRATIVE REPORT COMPLETED BY: S. B. ROGERS l TELEPHONE: (912) 367-7781 x2878  !

- OCTOBER 1 0000 Shift continued to maintain approximately 85% of rated thermal power to facilitate repair of the flange leak on the 7th Stage "A" to 8th Stage "A" Feedwater Heater Low Level Dump Valve.

OCTOBER 1 0250 Shift began ascension to rated thermal power.

i' OCTOBER 1 0447 The unit attained rated thermal power.

OCTOBER 20 2125 Shift began reducing load to approximately 830 GMWe to backwash and precoat Condensate Demineralizers "F" and "D".

OCTOBER 21 0002 Shift began ascension to rated thermal power, l OCTOBER 21 0147 The unit attained rated thermal power.

l- OCTOBER 27 0107 Shift began reducing load to approximately 830 GMWe to perform l l Turbine Stop Valve and Bypass Valve Testing.

~ ~

OCTOBER 27 0133 Shift began ascension to rated thermal power. j OCTOBER 27 0146 The unit attained rated thermal power.

OCTOBER 31 2400 Shift continued to maintain rated thermal power.

l l

i E2-1

l .- .

OPERATING DATA REPORT DOCKET NO.
50-366 DATE: NOVEMBER 5,1996 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS
1. UNIT NAME: E.1. HATCH - UNIT TWO l 2. REPORT PERIOD: OCTOBER 1996
3. LICENSED THERMAL POWER (MWt): 2558
4. NAMEPLATE RATING (GROSS MWe): 850
5. DESIGN ELECTRICAL RATING (NET MWe): 784
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 844
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 809
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS  ;
10. REASONS FOR RESTRICTION, IF ANY: N/A l

THIS MONTH YEAR-TO-DATE CUMULATIVE l

11. HOURS IN REPORTING PERIOD: 745.0 7320 150265
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 745.0 7213.1 117694.7  !
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l
14. HOURS GENERATOR ON LINE: 745.0 7175.7 113826.7
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1902907 18133685 254499486
17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 637725 6068576 83502835
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 612078 5819701 79577162
19. UNIT SERVICE FACTOR: 100.0 % 98.0 % 75.8 %
20. UNIT AVAILABILITY FACTOR: 100.0 % 98.0 % 75.8 %
21. UNIT CAPACITY FACTOR (USING MDC NET): 101.6 % 98.3 % 69.3%
22. UNIT CAPACITY FACTOR (USING DER NET): 104.8 % 101.4 % 67.5 %
23. UNIT FORCED OUTAGE RATE: 0.0% 0.9% 6.6%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

30 Day Refueling Outage tentatively scheduled for March 15,1997.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A l

l E2-2

l l

l PLANT E. I. HATCH - UNIT TWO DOCKET NO.: 50-366 DATE: NOVEMBER 5,1996 l AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS i TELEPHONE: (912) 367-7781 x2878 j

DAY. NetMWe
1. . . . 801 l
2. 818  :

I

3. , . 816
4. .. . . 820
5. . 824
6. . 822 7.. . 823 l 8. . . . 820
9. 822
10. . 825 l
11. . . 825 12.

825

! 13. . 825 14 . . 824 l 15. . 824 l 16. . . 822 l 17 . . . 821

! 18. . 822

19. .. . . . 826
20. 824
21. 826
22. . . .. 825
23. . . 823  ;
24. .. 827 l
25. . . . 825
26. . 819
27. . . 818
28. . . 819
29. 818
30. . 817 l 31 . . 822 I

i E2-3 i

I

. . .. - -- . _. = _ . . - - . - - - - = _ - - _ . - .. .~.

g UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-366 DATE: NOVEMBER 5,1996 UNIT NAME: E.1. HATCH - UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: OCTOBER 1996  :

1 1 i l

R M S

E E Y l T A T LICENSEE SC

, Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO

NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE I

l No significant power reductions occurred this month.

1 1

i  ;

J i

I l

TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

E2-4