Forwards Safety Insp Repts 50-456/84-36 & 50-457/84-34 on 841120-850730.No Violations Noted
ML20134G323
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/16/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134G327 List:
References
NUDOCS 8508230221
Download: ML20134G323 (2)


See also: IR 05000456/1984036

Text

P

,

\-

AUG 161985

~

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTh: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. M. Jacobson

of this office on November 20-21, December 5-6, 17-19, 26-27, 1984, and

May 1,17, June 14, July 16, 25-26, 30,1985, of activities at Braidwood

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. L. O. DelGeorge

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,,ortetnal Sianca by J. F. Stre'eter" (

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-456/84-36 DRS ;

No. 50-457/84-34 DRS

See Attached List For Distribution

8508230221 850816

PDR ADOCK 05000456 \(

O PDR

V60/

n_

, (- .

.

Commonwealth Edison Company 2 (UG 161985

6

-Distribution ,

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager -

D. Shamblin, Construction -

Superintendent ~

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H..S.. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

l

l

l

RIII RIII RI" RIII

(Jaco#.d

bson/kja M Dani

d on hLitti

MW

HarVison l

, 08/15/85

f/t>ff l Y #fM S/]L

- _ _ _ _ _ - _ - - ---__ _ ------_ _ _ _ --- _ _-----_-- _ _ _ _ --_ _ -_