ML20134B113

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-440/85-73 & 50-441/85-24 on 851007-11 & 14-18.No Violation Noted
ML20134B113
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/05/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20134B115 List:
References
NUDOCS 8511110277
Download: ML20134B113 (2)


See also: IR 05000440/1985073

Text

-

. ,

.*

b

NOV - 51985

-Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety . inspection conducted by C. H. Scheibelhut

of this office on October 7-11 and 14-18, 1985, of activities at Perry Nuclear i

Power plant, Unit 1 and 2 authorized by NRC Construction Permit No. CPPR-148

and CPPR-149, and to the discussion of our findings with Messrs. Waldron and

Shuster_at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined ouring

the inspection. Within these areas, the inspection consisted of a selective -

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this '

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

-

30rtsipi citrad by a y. Wald"

R. F. Warnick, Chief

Projects Branch 1

Enclosure: Inspection Report No.

50-440/85073 and 50-441/85024

cc w/ Enclosure: See Distribution

, 8511110277 851105

PDR ADOCK 05000440

G PDR

@

~

RIII RIII A T RIII

RFu)fr<

McCormick-Barger/r1 Knop

Wa& aed Efe) '

11/$785

'

11/f/85fik@,Warnick

11/ r/85

/yhp\

-____-__ _ ___ .

_ _ _ - _ _ _ _ _

'

.

Cleveland Electric I~iluminating -2-

Company

't

NOV 5 1985

Distribution:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

,

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

,

4

l

l'

i

.

,

,,. , , , . _ - . - - . . - - , ,,- -.