ML20133M511

From kanterella
Jump to navigation Jump to search
Forwards Preoperational Physical Security Insp Rept 50-440/85-65 on 850930-1004.No Noncompliance Noted
ML20133M511
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/22/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20133M513 List:
References
NUDOCS 8510280103
Download: ML20133M511 (2)


See also: IR 05000440/1985065

Text

' Oc-

vit T db I b if bb

OCT 2 21985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTri: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the announced preoperational physical security inspection

conducted by Messrs. J. R. Kniceley and J. L. Belanger of this office on

September 30 - October 4,1985, of activities at Perry Nuclear Power Plant,

Unit 1, authorized by NRC Construction Permit No. CPPR-148 and to the

discussion of our findings with fir. A. Kaplan and other rienbers of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

exanination of procedures and representative records, observations, and

interviews with personnel.

No itens of noncompliance with NRC requirements were identified during the

ccurse of this inspection.

Areas exanined during this inspection concern a subject matter which

is exempt from disclosure according to Section 73.21(c)(2) of the NRC's

" Rules of Practice," Part 73, Title 10, Code of Federal Regulations.

This infornation must be handled and protected in accordance with the

provisions of 10 CFR 73.21. Consequently, our report of this inspection

will not be placed in the Public Docunent Room.

We will gladly discuss any questions you have concerning this inspection.

!

Sincerely,

W. L. Axe so'n, Chief

Y . 6 'l ,

[C ;gi;

I

Nuclear Materials Safety -

F-

and Safeguards Branch .q ;i M , g1

Encicsure: Inspection Report

f il

No. 50-440/85065(DRSS) 1. - .

,,r.

s

See Attached Distribution ,' ' 3T 10.1

a This

E '

..c rol } ;d

l Bu

G

  • nn SoNAo

e n c r n i i n n rs n .-,rmm- ~

a -' g

-

u n Luutu wd thi Ut tivin ilVl;

- - _ _ - - _ - - - _ _ _ _ - . - - _.-,- - . - - - - - _ . _ - - - . - - - _ ~ . - . _ , - . . -. . -

.

QllCEGIllippQ l'\f C(W 8 A" (W

v, u -m v. u w v i, o viuvert ,U n

'0CT 2 2 '1985

The Cleveland Electric Illuminating 2

Company

Distribution

cc w/ enclosure:

Perry Information Control

Mail Zone R290

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

.

Y6

RIII RIII III RIII RIII

Kn e ey/kja Bel er [d Kn p A n

10/19/85 0.a. r r rub np, n ..-- -- -

v< " 'uonRoa 11eUiuwA l . Ui\.

.. .. _