ML20133L185

From kanterella
Jump to navigation Jump to search
Provides Revised TS Pp for TS Change Request 96-01-0, Requesting That TS Be Revised to Eliminate in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities
ML20133L185
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/15/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133L188 List:
References
NUDOCS 9701210518
Download: ML20133L185 (2)


Text

  • -* ,

Etttion Support Depirtment

.. A W

PECO NUCLEAR geco see,,, cemoe,,,

A Unit of PECO Energy C e B levard wn p January 15,1997 Docket Nos. 50452 50453 Ucense Nos. NPF-39 1 NPF-85 j l

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 i Revised Technical Specification Page for '

Technical Specifications Change Request 96-01-0 l Gentlemen-

]

By letter dated March 29,1996, PECO Energy submitted Technical Specifications (TS) Change ,

Request 96-01-0 for Umerick Generating Station (LGS), Units 1 and 2, requesting that the TS be l revised to eliminate the requirement to perform in-situ functional testing of the Automatic  ;

Depressurization System (ADS) valves as part of start-up testing activities.

Subsequently, PECO Energy became aware that information on one of the marked up TS pages was inadervently deleted. Specifically, the word "OPERABluTY" was deleted from the footnote on the mark-up for TS page 3/4 5-5 for Unit 1, Therefore, the attachment to this letter provides l a correc'd Unit 1 TS mark-up page for TSCR 96414. The Unit 2 TS mark-up page that was  ;

submitted by our letter dated March 29,1996, contains the correct information. l This information is being submitted under affirmation, and the associated affidavit is enclosed. f If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, h hfcut G. A. Hunger, Jr.

Director - Licensing Enclosure Attachment cc: H. J. Miller, Administrator, Region I, USNRC (w/ attachment, enclosure)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment, enclosure)  ;

R. R. Janati, Director, PA Bureau of Radiological Protection (w/ attachment, enclosure)

ADOf )

9701210518 97011532 DR ADOCK 050

. - . . . -- - _. _. . .- .. ~ _-.

/

COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF CHESTER  :

l D. B. Fetters, being first duly sworn, deposes and says:

l That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the foregoing information which submRs a revised page for Technical Specifications Change Request No.  ;

96-01-0 for Limerick Generating Station, Units 1 and 2, Facility Operating License Nos. NPF-39 and NPF-85, l

concerning Automatic Depressurization System (ADS) valve start-up testing, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, l l

Information, and belief. j

~;

Vice President Subsc"ibed and sworn to before me this day o .

1997.

1

//.

Nctary blic

- i aC g,-

i [ 4 commisekm Ex;*eetesy 17.

l

-nemies,pennsywarmu ed