Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106
ML20133H126
Person / Time
Site: Midland
Issue date: 09/25/1985
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
CON-#485-635 32386, ALAB-106, OL, OM, NUDOCS 8510160279
Download: ML20133H126 (7)


Text

s ,

90 ,/

a (f

- Consumers .

Power  !

James W Cook l Vice President - Projects, Engineering and Construction General Ctfices: 1945 West Pernell Road, Jack.on, MI 49201 * (517) 788 0453 September 25, 1985 Director of Office of Inspection and Enforement Att Mr James M Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 MONTHLY REPORT FOR AUGUST 1985 DOCKET NOS 50-329 AND 50-330 FILE 0.4.6 SERIAL 32386 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are five copies of the following documents written or closed during the month; Bechtel Nonconformance Reports, Quality Action Requests, Management Corrective Action Reports, Quality Audit Findings; Babcock & Wilcox Reports of Noncon-formity; Consumers Power Company Nonconformance Reports, Audit Finding Re-ports, Quality Action Requests, Corrective Action Reports, and Management Corrective Action Requests / Reports.

JWC/WRB/lm CC JGKeppler, USNRC Region III (w/ enc)

CBechhoefer, Esq. ASLB (w/ enc)

ALAB-106 Service List (w/ enc) 8510160279 850925 PDR ADOCK 05000329 A PDR g

OC0985-0025A-MP02 gi

ALAB-106 MONTHLY REPORT SERVICE LIST Mr Frank J Kelley, Esq Mr Steve Gadler Attorney General of the 2120 Carter Avenue State of Michigan St Paul, MN 55108 Ms Carole Steinberg, Esq Assistant Attorney General Mr William Clements (2)

Environemntal Protection Div Docketing & Services 720 Law Building US Nuclear Regulatory Commission Lansing, MI 48913 Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Cherry 6 Flynn Ms Mary Sinclair 3 First National Plaza 5711 Summerset Street Suite 3700 Midland, MI 48640 Chicago, IL 60602 Mr William D Paton, Esq Mr F C Williams, Esq Counsel for the NRC Staff Isham, Lincoln & Beale US Nuclear Regulatory Commission 1120 Connecticut Ave, NW Washington, DC 20555 Suite 325 Washington, DC 20036 Mr P Robert Brown,Jr Clark, Klein & Beaumont Ms Barbara Stamiris 1600 First Federal Building 5795 North River Road 1001 Woodward Avenue Route 3 Detroit, MI 48226 Freeland, MI 48623 Ms Lynne Bernabei Mr John Demeester, Esq Government Accountability Dow Chemical Building Project of the Institute Michigan Division for Policy Studies Midland, MI 48640 1901 Q Street, NW Washington, DC 20009 Mr Michael I Miller, Esq Isham, Lincoln & Beale Mr James E Brunner, Esq 3 First National Plaza Consumers Power Company 52nd Floor 212 West Michigan Avenue Chicago, IL 60602 Jackson, MI 49201 OC0985-0025A-MP02

INDEX OF ATTACHMENTS ALAB-106 MONTHLY REPORT AUGUST 1985 Bechtel Nonconformance Reports - None Bechtel Quality Action Requests - None Bechtel Management Corrective Action Reports - None Bechtel Quality Audit Findings - None Babcock & Wilcox Reports of Nonconformity - Ncne Consumers Power Company Nonconformance Reports -

Q-00025, Opened 08/27/85 Q-00026, Opened 08/23/85 Consumers Power Company Audit Finding Reports - None Consumers Power Company Quality Action Requests - None Consumers Power Company Corrective Action Reports - None Consumers Power Company Management Corrective Action hequest/ Reports - None OC0985-0025A-MP02 i

UdbUfid ha'.

QUALITY 15 NCR NO. 17 REY ]

'ASSURA$CE Q-00025 0 DIVISION 16 DATE ISSUD FORM QAD-1 Aunust 23. 1985 NONCONFORMANCE REPORT 18 PAGE 1 0F 2 1 IT M LOCATION Service Water Bays l 2 DRAWING OR PART NO. AND REY. 3 PART NAME 4 SERIAL NO. ,

N/A Traveling Screens N/A i

5 ITM DESCRIPTION l

Sarvice Water Traveling Screens - 0F-55 A&B f

6 ITEM STARTUP SYSTM NO. 7 1r.rr.mEhCE DOCUhr.nl 8 ASME A.N.I. REQUIRED N/A OM-001, Rev 2 N/A 9 INSPECTION PLAN REY 10 ACTION ORGANIZATION

! WO-500533 0 Operations and Maintenance Division all ACTIVITY HOLD REQUIRED: ACTIVITY ROLD ORDER NO.

} TES X NO N/A 3,12 REQUIREMBT Procedure Number OM-001, Rev.2, paragraph 5.3.2.d. states in part "In the execution of the I_ work order if it is found that the engineering criteria and/or work order require revision,_ ,

4 the Maintenance Coordinator shall request the assistance of Engineering Technical Support

] cr the initiator of the work request in revising the work order."

l i

i

!13 NONCONFORMANCE While performing a partial inspection to. Work Order 22500533-9 (Layup of Service Water Bsys and Sluice Gates) it was noted that four Service Water Traveling Screens (Q-equipment) had been removed in order to facilitate the work. The-~ work order did not cover the removal of the screens. A revision to the work order was not obtained prior to removing the

, screens.

t m

1 '+ N R INATED BY T L E3 F J Lo M DAME 19 HOLD TAG APPLIED TES x NO 20 LOCATION OF HOLD TAGS OR SEGREATE AREA ITEMS SEGREGATED TES X NO N/A ,

R 21 NEED TO REVIEW FOR 23 TREND CODE 24 CR EVI .

REPORTABILITY TES X NO 1 <P y 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD ASSURANCW p INEERING

.! TES NO ,

N/A N/A QA-006 Rev 2

!26 CAUSE 35 PAGE 2 0F" 2 .

27 PROCESS CORRECTIVE ACTION REQUIRED I lYES l l NO ,

l 28 RECOB0GilDE DISPOSITION l ]RDIORK l l SCRA?/ REJECT l l REPAIR

  • l l USE AS IS*

C CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l l YES l l NO CR NO:

30 ADDITIONAL INFORMATION l

s 13 1 DISPOSITI0tl CollCURRDCE l

j -

ACTION ORGANIZATI0ll DATE QAD CONCURRB CE DATE ,

I

I ENGINEERING DATE A.N.I. (ASME) IF REQUIRE

.; .32 DISPOSITION ACTION TAKEN i

.. ... -.- - - . . . . - . . . . , . . . . . - - - - - . ~ . - . . . . . . . . .

33 METHOD OF DISPOSITION ACTION VERIFICATION *34 NCR CLOSE BY RESULTS OF DISPOSITION ACTION VERIFICATION I

l l ACCEPTABLE l l UNACCEPTABLE :QAD DATE IF UNACCEPTABLE, REFERENCL SUPERSEDING NCR NUMBER

A.N.I. (ASME) DATE

', IF REQUIRE QA-006 Rev 2 i

RECOM CfPY ,

.-QpALITY 15 NCR NO. 1F MV

  • ASSURANCE Q-00026 0 DIVISION 16 DATE ISSUED FORM QAD-1 8/27/85 NONCONFORMANCE REPORT 18 PAGE 1 0F jt, 1 ITEM LOCATION Warehouse 1 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

NA NA NA

5 ITEM DESCRIPTION Warehouse 1 - Class B Storage Area f

i6 ITEM STARTUP SYSTEM NO. 7. REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA CD-002 revision 0 NA f

{9 INSPECTION PLAN REV 10 ACTION ORGANIZATION NA Facilities and Materials Division jl1 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

l YES x NO NA l12 REQUIREMENT l Procedure Number CD-002 revision 0, paragraph 7.2.2 states in part, "-Level B Storage areas L_ zhalla._4 _ Be well_ ventilated buildings or equivalent enclosures. that .are. fire.. resistant.

l tear resistant and weathertight,"

l 13 NONCONFORMANCE Contrary to the above requirement Warehouse 1 class B storage area is not weathertight. The couth west corner of the building roof has a severe leak causing extensive flooding of the floor during rains. On 8/26/85, following an afternocn rain, a standing puddle of water measuring approximately 25' wide x 60' long x 1 1/2" deep was on the warehouse floor.

lG14 NCR INATED BY L

'FJLoun M

& a/cler

' DATE 19 HOLD TAG APPLIED YES y NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED YES NO NA 21 NEED TO REVIEW FOR y 23 TREND CODE 24 NCR R BY L,M (

REPORTABILITY YES A NO {

i22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD, AS CE ENGINEERING" ' / /

YES NO QA-006 Rev 2 i

t

26 CAUSE ~

35 PAGE 2 OF

  • b - -

27 PROCESS CORRECTIVE ACTION REQUIRE l l YES l l NO ,

l 28 RECOMMEND E DISPOSITION . ,

l l l REWORK l l SCRAP / REJECT l l REPAIR

  • l iUSE AS,IS*

AREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEED 1 lYES. l 1 NO- CR NO:

30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE ACTION ORGANIZATION DATE. QAD CONCURRENCE DATE ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR CLOSE BY

'RESULTS OF DISPOSITION ACTION VERIFICATION l l ACCEPTABLE l l UNACCEPTABLE -QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEING NCR NUMBER A.N.I. (ASME) DATE IF REQUIRE QA-006 Rev 2

_ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _