B16082, Discontinues Payment of Annual Fees as Outlined in 10CFR171.15 for Plant,Effective 970101

From kanterella
(Redirected from ML20133B646)
Jump to navigation Jump to search
Discontinues Payment of Annual Fees as Outlined in 10CFR171.15 for Plant,Effective 970101
ML20133B646
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/19/1996
From: Feigenbaum T
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16082, NUDOCS 9701060062
Download: ML20133B646 (2)


Text

.- .- - - . . - . - - . - .- . -- - . . . - . - . .

n .

~

"h Northeast 1 7 seide stnet,Buk cn6037 Utilities System wrtwt Utim su+. comp.ny P.O. Box 270 flartford, CT 06141-0270 l (203) 665-5000 l December 19,1996 Docket No. 50-213 B16082 Re: 10CFR171 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

. Washington, DC 20555  !

Haddam Neck Plant l Annual Fee Reauirements Of 10CFR171  !

i )

l The purpose of this letter is for Connecticut Yankee Atomic Power Company  !

(CYAPCO) to discontinue the payment of annual fees as outlined in 10CFR171.15 for

the Haddam Neck Plant (HNP) in a letter dated December 5,1996,W CYAPCO infcrmed the NRC that the Board of Directors of CYAPCO had decided to permanently cease operations at the HNP and that the fuel had been permanently removed from the reactor. In accordance with 10CFR50.82(a)(2), the certifications in this letter modified the HNP license to permanently withdraw CYAPCO's authority to operate. As a result, CYAPCO is only authorized to possess special nuclear material. i in conjunction with the HNP license modification, CYAPCO has reviewed the annual fee requirements of 10CFR171 for applicability. CYAPCO has concluded that 10CFR171 l no longer applies to the HNP. Specifically,10CFR171.3, " Scope," states the following

"The regulations in this part apply to any person holding an operating license for a power reactor, . . . ."

10CFR171.5, " Definitions," further states:  ;

" Operating license means having a license issued pursuant to 9 50.57 of this chapter. It does not include licenses that only authorize possession of special nuclear material after the Commission has received a request from the licensee to amend its licensee to permanently withdraw its authority to operate or the g300 ?g Commission has permanently revoked such authority."

(1) T. C. Feigenbaum letter to the U. S. Nuclear Regulmory Commission,

" Certifications Of Permanent Cessation Of Power Operation And That Fuel Has (

Been Permanently Removed From The Reactor," dated December 5,1996. -

l C

6 0i"656062 961219 l PDR ADOCK 05000213 P PDR

l Based on the exclusion cited in 10CFR171.5, CYAPCO will discontinue payment of annual fees as outlined in 10CFR171.15 beginning on January 1,1997. CYAPCO will continue to pay the fees as outlined in 10CFR170 for regulatory and licensing services.

If you should have any questions, please contact Mr. G. P. van Noordennen at (860) 267-3938. l 1

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY i

l f p/Ar "N T. C. Feigenbapfff ,

Executive Vice President and l Chief Nuclear Officer I

cc: H. J. Miller, NRC Region l Administrator  :

S. Dembek, NRC Project Manager, Haddam Neck Plant  !

W. J. Raymond, NRC Senior Resident inspector, Haddam Neck Plant K. T. A. McCarthy, Director, CT DEP Monitoring and Radiation Division

]