Text

.

OPERATING DATA REPORT UNIT NAME M_illstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444 5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period August 1955 INotes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to ,
4. Licensed Thermal Power (MWt): 2011. reflect Forced Outage
5. Nameplate Rating (Gross MWe): 662 beginning 12/13/95 @ 0000
6. Design Electrical Rating (Net MWe): 660_ due to 10CFR50.54(f) letter
7. Maximum Dependable Capacity (Gross MWe): 670
8. Maximum Dependable Capacity (Net MWe): 641
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report,  !

Give Reasons:

N/A _

10. Power Level To Which Restricted, if any (Net MWe): 0 ~
11. Reasons For Restrictions, if Any: NRC Category lli Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 5855.0 225071.0
13. Number Of Hours Reactor Was Critical 0.0 0.0_ 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line _

0.0 0.0 166560.7 l

16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 i
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0  ;
18. Gross Electrical Energy Generated (MWH) _0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) -2233.0 -18049.0 101036086.0
20. Unit Service Factor 0.0 0.0 74.0
21. Unit Availability Factor 0_.0, 0.0_ 74.0
22. Unit Capacity Factor (Using MDC Net) _,

-0.5 -0.5 68.6

23. Unit Capacity Factor (Using DER Net) -0.5_ -0.5 68.0
24. Unit Forced Outage Rate *100.0 *100.0 *14.5
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: To be determined
27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

l 9612200111 961216 PDR ADOCK 05000245 R pop

UNIT SHUTDOWNS AND POWER REDUCTIONS . .'

DOCKET NO. 50-245 ,

UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: Auaust 1996 2

No. Date Type' Duration Reason Method of License System Comp *onent Cause & Corrective (Hours) Shutting Event Code' Code Action to Down Reactor' Report # Prevent Recurrence 95-10H 951213 F 744 D 4 N/A N/A N/A NRC Category I'l facility; NRC Confirmatory Order requiring independent corrective action verification; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

3

' F: Forced 2 Reason Method ' IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual

  • Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F- Administrative 6 - Other (Explain) ' IEEE Standard 803A-1983 G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"  ;